If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-105-21935 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.828513,"lon":-77.868533,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Potter | |
| Municipality: Allegany Township | |
| Operator Name: JKLM ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: WOODCOCK CREEK 125-4HU | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2019-03-01 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: Yes | |
| Latitude: 41.828513 | |
| Longitude: -77.868533 |
| Date | Event |
|---|---|
| 2019-03-01 | New Permit Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2835770 | Primary Facility | 2019-02-05 | Preoperation Inspection | No Violations Noted | Silt sock no chip berm. 1 HU.
The Department of Environmental Protection (DEP) conducted a PREOP inspection of the JKLM Woodcock Creek Well Pad 125, located in Allegany Twp, Potter Co. on 2/5/2018 @1000 hours. Present for the inspection were Jeff Long, JKLM; Jamie Spear, JKLM and John Watts, JL Watts Contractor. No activity was observed onsite. The site consists of ~4200' of access road, a 350' x 500' well pad, two sediment traps, and a topsoil stockpile. As of today's inspection the access road and rock-lined channels were observed installed. Soil cement and cap rock has not been completed on the well pad. The out-slope of the well pad was observed stabilized with ECB matting, with TRM matting in the perimeter channels. The perforated drains around the perimeter of the well pad were discharging into the corner PVC pipe that outlets into the sediment traps. Both sediment traps were observed holding water and discharging due to snow melt. No violations were noted at this time. JKLM plans to spud and dril |
For data sources see[5]