If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-111-20291 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.033639,"lon":-79.184861,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Jefferson Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149131 | |
Farm/Lease Name: R MILLER UNIT 2H | |
License Status: | |
Spud Date: 2011-06-03 | |
Permit Date: 2010-01-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.033639 | |
Longitude: -79.184861 |
Date | Event |
---|---|
2010-01-07 | New Permit Application |
2010-12-30 | Permit Renewal Application |
2011-06-02 | Performed Spud Operation |
2011-06-10 | Drilling Completion |
2012-05-30 | Drilling Completion |
2012-09-11 | Perforation |
2013-01-11 | NEWLY DRILLED |
2013-05-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-09-11 | 2012-09-11 | 7,239 | 5,851,923 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | ||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00676000 | ||
Proppant (lbs) | Proppant | 9.32 | 10.36 | |||||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.31 | |||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00187000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00704000 | ||
Clean Volume (gals) | Carrier/Base Fluid | 90.68 | 100.00 | |||||
Biocide EC 6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00676000 | ||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00113000 | |||||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00011000 | ||
Carbohydrates | 95.00 | 0.00067000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 375,953.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 284,318.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 212,749.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 160,682.38 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 134,297.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 151,487.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 119,860.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 130.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 462.41 Tons | LANDFILL | 100081 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 360.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 8,438.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 29.71 Tons | LANDFILL | 101421 |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 7.24 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,020.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 9,536.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,890.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 270.42 Tons | LANDFILL | 100172 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 12.01 Tons | LANDFILL | 100419 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 26.66 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 6,343.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,293.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | LPR ENERGY LLC | Produced Fluid | 307.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | LPR ENERGY LLC | Produced Fluid | 2,365.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | LPR ENERGY LLC | Produced Fluid | 231.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,042.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | LPR ENERGY LLC | Produced Fluid | 1,533.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | Produced Fluid | 714.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | LPR ENERGY LLC | Produced Fluid | 843.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | LPR ENERGY LLC | Produced Fluid | 411.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 1,121.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 2,152.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 408.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | LPR ENERGY LLC | Produced Fluid | 2,874.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid | 101.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1985943 | Primary Facility | 2011-06-28 | Drilling/Alteration | No Violations Noted | At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure on the gauge at the manifold. |
1986026 | Primary Facility | 2011-06-09 | Drilling/Alteration | No Violations Noted | Chief contracted UDI 5 to install gas well. Chief contact person was Dewayne Pauley. Conductor pipe (20¿) installed to 60 ft and grouted to surface. Second stringer was 13 3/8¿ installed to 462 ft with 330 sks of gas blocks with 11 bbl return. Current depth was 1781. At the time of inspection, no E&S issues or IW issues at the site. Chief proposing to install 9 5/8¿ pipe to 1811 ft. |
2004283 | Primary Facility | 2011-09-13 | Routine/Complete Inspection | No Violations Noted | During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well drilled not yet in production. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Control Plan and appear properly maintained. No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with growth observed. R Miller 6H recently spudded and drilled. No pits or tanks present on site. No violations noted during this inspection. |
2006207 | Primary Facility | 2011-09-28 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure reading on the gauge located at the manifold. Annulus valve was closed. |
2034177 | Primary Facility | 2012-01-10 | Routine/Complete Inspection | No Violations Noted | During this inspection; well sign, ES plan, ESCGP-1, and PPC plan onsite. Well tag present, although recommend operator update well tags to include current operator information. |
2069379 | Primary Facility | 2012-05-10 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Multi well pad. Said well previously drilled. Crown Rig # 8 actively drilling 6H. Charles, DSM onsite during this inspection. Secondary containment in place beneath rig and onsite tanks. No pits installed by Chevron for drilling operations. Tanks and secondary containment look structurally sound. Appears bmp's are installed and functioning according to plan. No accelerated erosion or sedimentation issues noted with site or access road. Access road adequately rocked.Noted a "small" leak coming from Residual waste box on site, notified DSM whom stated the problem would be addressed immediately. Absorbent pads were placed in location of leak. Department also noted to DSM of a possible safety concern near back side of rig, where it appears shale was placed over top electric lines and drilling equipment (see picture). DSM stated that matter would be addressed immediately no violations noted. |
2070076 | Primary Facility | 2012-04-20 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place. 13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet. Chevron current depth was 5,663 feet. Chevron was planning to TD at 7500 feet and set the kick off point. DEP personnel performed a site walk and did not find any issues. |
2082062 | Primary Facility | 2012-07-03 | Routine/Complete Inspection | No Violations Noted | |
2092742 | Primary Facility | 2012-05-15 | Drilling/Alteration | No Violations Noted | Well 2H was completed and Chevron was setting up on 6H. |
2092873 | Primary Facility | 2012-06-01 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place. 13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet. Chevron current depth was 14,255 feet. Chevron set the kick off point at 7829 ft. DEP personnel performed a site walk and did not find any issues. |
2094651 | Primary Facility | 2012-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no site activity and no E&S issues were present. |
2141760 | Primary Facility | 2013-02-19 | Incident- Response to Accident or Event | In Compliance with Policy | Admin Inspt. Spoke to Chevron representative B.A. Lambie via phone on 2/19/13. According to Mr. Lambie, on 2/18/13 as truck was loading production brine, truck tank began leaking due to failed tank seam. Resulted in approximately 10 gallons of brine released to ground, impacting an approximate area of 15 square feet. Impacted materials immediately excavated into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance. |
2145150 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | No Violations Noted | Regulatory inactive status. Multi-well pad. |
2159322 | Primary Facility | 2013-04-18 | Routine/Complete Inspection | No Violations Noted | Routine inspection. 5 unmarked drums found on site. |
2169728 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2181817 | Primary Facility | 2013-07-09 | Routine/Complete Inspection | No Violations Noted | Inspectd site. No issues noted other than there are 5 un marked drums on site. These drums were noted on a 5/22/13 inspection. |
2196932 | Primary Facility | 2013-08-20 | Routine/Complete Inspection | No Violations Noted | Inspected the site on 8/20/13. There was not any activity on the restored well pad. The road going into the site was well graveled. The welll pad was well graveled. The Well pad signs were properly marked. This pad has three producing Marcelus gas wells. The three wells were properly marked.The drums observed in the past inspection were removed from the pad.There were two dumpsters on the well pad that contained Demo waste. No staining on the well pad was observed. The fresh water impoundment is now fenced in. No E&S issues were observed. During the inspection no issues were observed that need to be addresed |
2238794 | Primary Facility | 2014-01-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present. Well was in production. |
2297782 | Primary Facility | 2014-08-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present. Well was in production. |
2297815 | Primary Facility | 2014-08-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present. Well was in production. |
2323954 | Primary Facility | 2014-11-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present. Well was in production. |
2382918 | Primary Facility | 2015-06-15 | Routine/Complete Inspection | No Violations Noted | no issues. system running |
2443387 | Primary Facility | 2016-01-12 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2486198 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2493461 | Primary Facility | 2016-06-13 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus pad.
At time of inspection site ID sign on site. ERP, PPC plan, ESCGP1 and well permit on site. Site surrounded by security fence. Gate locked. It appears well tag is present. Brine tank located in secondary containment appears structurally sound. Access road and pad rocked. No E&S issues observed on access road or on well pad. |
2532144 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2580970 | Primary Facility | 2017-04-10 | Routine/Complete Inspection | No Violations Noted | Well appears to be in production. Well pad surrounded by security fence. |
2594458 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | system running no issues |
2605005 | Primary Facility | 2017-06-15 | Routine/Complete Inspection | No Violations Noted | Wells active 1H, 6H, 2H in production. no issues |
2624208 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | system running. no issues. no loud sounds coming from Miller pad and no heavy equipment running. |
2626020 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | 1H, 2H and 6H wells are in production. No issues at the site. Wells 3H, 4H, and 5H were not drilled. |
2672260 | Primary Facility | 2017-12-18 | Routine/Partial Inspection | In Compliance with Policy | Routine partial inspection due to snow cover. At time of inspection it appears well is in production. |
2673674 | Primary Facility | 2017-12-21 | Routine/Complete Inspection | No Violations Noted | System running. No issues. .well tag present |
2683418 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | System running no issues. Well tag present. Emergency contact sign present. |
2700591 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Well tag present and emergency contact information present. No issues at the site |
2710352 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | Well tag and emergency contact number present at the site. No issues at the site |
2719668 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well pad surrounded by security fence. Well tender on site during inspection. |
2728427 | Primary Facility | 2018-05-09 | Routine/Complete Inspection | No Violations Noted | Well was in production. Well tag and emergency contact present. No issues at the site |
2827771 | Primary Facility | 2019-01-16 | Routine/Complete Inspection | No Violations Noted | Wells are in production. No issues at the site |
2853753 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | System running. Well in production. Production reports submitted to state. |
For data sources see[8]