X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-111-20291

Well Details

Well ID: 37-111-20291
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Jefferson Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149131
Farm/Lease Name: R MILLER UNIT 2H
License Status:
Spud Date: 2011-06-03
Permit Date: 2010-01-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.033639
Longitude: -79.184861

For data sources see[1][2][3]

Well History

Date Event
2010-01-07 New Permit Application
2010-12-30 Permit Renewal Application
2011-06-02 Performed Spud Operation
2011-06-10 Drilling Completion
2012-05-30 Drilling Completion
2012-09-11 Perforation
2013-01-11 NEWLY DRILLED
2013-05-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-09-11 2012-09-11 7,239 5,851,923

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00676000
Proppant (lbs) Proppant 9.32 10.36
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.31
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00187000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00704000
Clean Volume (gals) Carrier/Base Fluid 90.68 100.00
Biocide EC 6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00676000
Polyethylene glycol 25322-68-3 60.00 0.01
Dibromoacetonitrile 3252-43-5 5.00 0.00113000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00011000
Carbohydrates 95.00 0.00067000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 375,953.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 284,318.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 212,749.00 365 0.00 0 0.00 0
2016 LPR ENERGY LLC 160,682.38 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 134,297.00 354 0.00 0 0.00 0
2018 LPR ENERGY LLC 151,487.00 365 0.00 0 0.00 0
2019 LPR ENERGY LLC 119,860.00 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Drilling Fluid Waste 130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 CHIEF OIL & GAS LLC Drill Cuttings 462.41 Tons LANDFILL 100081
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 360.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 8,438.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Drill Cuttings 29.71 Tons LANDFILL 101421
2012 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 7.24 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,020.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 9,536.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,890.50 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 270.42 Tons LANDFILL 100172
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 12.01 Tons LANDFILL 100419
2014 CHEVRON APPALACHIA LLC Produced Fluid 26.66 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 6,343.34 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 3,293.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 LPR ENERGY LLC Produced Fluid 307.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 2,365.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 231.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,042.33 Bbl REUSE OTHER THAN ROAD SPREADING
2017 LPR ENERGY LLC Produced Fluid 1,533.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 714.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 LPR ENERGY LLC Produced Fluid 843.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid 411.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 1,121.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 2,152.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 408.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 LPR ENERGY LLC Produced Fluid 2,874.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid 101.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1985943 Primary Facility 2011-06-28 Drilling/Alteration No Violations Noted At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure on the gauge at the manifold.
1986026 Primary Facility 2011-06-09 Drilling/Alteration No Violations Noted Chief contracted UDI 5 to install gas well. Chief contact person was Dewayne Pauley. Conductor pipe (20¿) installed to 60 ft and grouted to surface. Second stringer was 13 3/8¿ installed to 462 ft with 330 sks of gas blocks with 11 bbl return. Current depth was 1781. At the time of inspection, no E&S issues or IW issues at the site. Chief proposing to install 9 5/8¿ pipe to 1811 ft.
2004283 Primary Facility 2011-09-13 Routine/Complete Inspection No Violations Noted During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well drilled not yet in production. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Control Plan and appear properly maintained. No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with growth observed. R Miller 6H recently spudded and drilled. No pits or tanks present on site. No violations noted during this inspection.
2006207 Primary Facility 2011-09-28 Routine/Complete Inspection No Violations Noted At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure reading on the gauge located at the manifold. Annulus valve was closed.
2034177 Primary Facility 2012-01-10 Routine/Complete Inspection No Violations Noted During this inspection; well sign, ES plan, ESCGP-1, and PPC plan onsite. Well tag present, although recommend operator update well tags to include current operator information.
2069379 Primary Facility 2012-05-10 Routine/Complete Inspection No Violations Noted At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Multi well pad. Said well previously drilled. Crown Rig # 8 actively drilling 6H. Charles, DSM onsite during this inspection. Secondary containment in place beneath rig and onsite tanks. No pits installed by Chevron for drilling operations. Tanks and secondary containment look structurally sound. Appears bmp's are installed and functioning according to plan. No accelerated erosion or sedimentation issues noted with site or access road. Access road adequately rocked.Noted a "small" leak coming from Residual waste box on site, notified DSM whom stated the problem would be addressed immediately. Absorbent pads were placed in location of leak. Department also noted to DSM of a possible safety concern near back side of rig, where it appears shale was placed over top electric lines and drilling equipment (see picture). DSM stated that matter would be addressed immediately no violations noted.
2070076 Primary Facility 2012-04-20 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place. 13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet. Chevron current depth was 5,663 feet. Chevron was planning to TD at 7500 feet and set the kick off point. DEP personnel performed a site walk and did not find any issues.
2082062 Primary Facility 2012-07-03 Routine/Complete Inspection No Violations Noted
2092742 Primary Facility 2012-05-15 Drilling/Alteration No Violations Noted Well 2H was completed and Chevron was setting up on 6H.
2092873 Primary Facility 2012-06-01 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place. 13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet. Chevron current depth was 14,255 feet. Chevron set the kick off point at 7829 ft. DEP personnel performed a site walk and did not find any issues.
2094651 Primary Facility 2012-08-06 Routine/Complete Inspection No Violations Noted At the time of inspection, no site activity and no E&S issues were present.
2141760 Primary Facility 2013-02-19 Incident- Response to Accident or Event In Compliance with Policy Admin Inspt. Spoke to Chevron representative B.A. Lambie via phone on 2/19/13. According to Mr. Lambie, on 2/18/13 as truck was loading production brine, truck tank began leaking due to failed tank seam. Resulted in approximately 10 gallons of brine released to ground, impacting an approximate area of 15 square feet. Impacted materials immediately excavated into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
2145150 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted Regulatory inactive status. Multi-well pad.
2159322 Primary Facility 2013-04-18 Routine/Complete Inspection No Violations Noted Routine inspection. 5 unmarked drums found on site.
2169728 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2181817 Primary Facility 2013-07-09 Routine/Complete Inspection No Violations Noted Inspectd site. No issues noted other than there are 5 un marked drums on site. These drums were noted on a 5/22/13 inspection.
2196932 Primary Facility 2013-08-20 Routine/Complete Inspection No Violations Noted Inspected the site on 8/20/13. There was not any activity on the restored well pad. The road going into the site was well graveled. The welll pad was well graveled. The Well pad signs were properly marked. This pad has three producing Marcelus gas wells. The three wells were properly marked.The drums observed in the past inspection were removed from the pad.There were two dumpsters on the well pad that contained Demo waste. No staining on the well pad was observed. The fresh water impoundment is now fenced in. No E&S issues were observed. During the inspection no issues were observed that need to be addresed
2238794 Primary Facility 2014-01-22 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present. Well was in production.
2297782 Primary Facility 2014-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present. Well was in production.
2297815 Primary Facility 2014-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present. Well was in production.
2323954 Primary Facility 2014-11-24 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present. Well was in production.
2382918 Primary Facility 2015-06-15 Routine/Complete Inspection No Violations Noted no issues. system running
2443387 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted system running. no issues
2486198 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted system running. no issues
2493461 Primary Facility 2016-06-13 Routine/Complete Inspection No Violations Noted Multi-well Marcellus pad.

At time of inspection site ID sign on site. ERP, PPC plan, ESCGP1 and well permit on site. Site surrounded by security fence. Gate locked. It appears well tag is present. Brine tank located in secondary containment appears structurally sound. Access road and pad rocked. No E&S issues observed on access road or on well pad.

2532144 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted system running. no issues
2580970 Primary Facility 2017-04-10 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well pad surrounded by security fence.
2594458 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running no issues
2605005 Primary Facility 2017-06-15 Routine/Complete Inspection No Violations Noted Wells active 1H, 6H, 2H in production. no issues
2624208 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted system running. no issues. no loud sounds coming from Miller pad and no heavy equipment running.
2626020 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted 1H, 2H and 6H wells are in production. No issues at the site. Wells 3H, 4H, and 5H were not drilled.
2672260 Primary Facility 2017-12-18 Routine/Partial Inspection In Compliance with Policy Routine partial inspection due to snow cover. At time of inspection it appears well is in production.
2673674 Primary Facility 2017-12-21 Routine/Complete Inspection No Violations Noted System running. No issues. .well tag present
2683418 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted System running no issues. Well tag present. Emergency contact sign present.
2700591 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2710352 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted Well tag and emergency contact number present at the site. No issues at the site
2719668 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well pad surrounded by security fence. Well tender on site during inspection.
2728427 Primary Facility 2018-05-09 Routine/Complete Inspection No Violations Noted Well was in production. Well tag and emergency contact present. No issues at the site
2827771 Primary Facility 2019-01-16 Routine/Complete Inspection No Violations Noted Wells are in production. No issues at the site
2853753 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted System running. Well in production. Production reports submitted to state.

For data sources see[8]

References