If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-111-20298 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.788139,"lon":-79.342472,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Addison Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 146417 | |
Farm/Lease Name: BLUEBAUGH UNIT 1H | |
License Status: Inactive | |
Spud Date: 2011-04-21 | |
Permit Date: 2010-08-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.788139 | |
Longitude: -79.342472 |
Date | Event |
---|---|
2010-08-26 | New Permit Application |
2011-04-21 | Performed Spud Operation |
2011-06-13 | Drilling Completion |
2011-10-18 | Perforation |
2013-01-11 | DEVIATED |
2019-03-15 | Inactive Well Request Granted |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-10-20 | 2011-10-20 | 8,951 | 2,978,576 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Clean Volume (gals) | Carrier/Base Fluid | 100.00 | 91.47 | ||||
Unislik ST 50 | CESI Chemical | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.26 | |||
GBL | Clearwater International | Gel Breaker | Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 | ||
Iron Control A | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00691000 | ||
CMHPG | Ashland | Water Viscosifier | Carboxymethylhydroxyporoyl guar blend | 100.00 | 0.00129000 | |||
Proppant (lbs) | Proppant | 100.00 | 8.53 | |||||
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00674000 | ||
Biocide EC 6116A | Nalco | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00683000 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00114000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 882.34 Tons | LANDFILL | 100081 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 168.16 Tons | LANDFILL | 101421 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 115.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 290.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1969366 | Primary Facility | 2011-04-29 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, valid site Id sign, ES plan, and ESCGP-1(final approval 4/14/11), located onsite. Well spud 4/20/11. Noted that PPC plan contacts were not updated, specifically those within the DEP. 24hr security guard located onsite. Rig located onsite actively drilling well. No pits located on pad, operator utilizing closed containment tanks, which appear structurally sound with freeboard. Operator installed ¿containment pad beneath rig¿ in order to prevent a possible pollution event. No accelerated erosion or sedimentation issues observed. BMP¿s installed according to ES plan. Operator should continue to routinely monitor/maintain all BMP¿s until final restoration is completed. Access road stable. |
1975381 | Primary Facility | 2011-05-06 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5. Conductor pipe set at 32 ft using 26¿ pipe. First stringer set at 419 ft using 20¿ pipe. Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns. Second stringer set at 13 3/8¿ to 621 feet with gas block of 20 bbl return. Third stringer set at 1791 ft of 9 5/8¿ pipe with 650 sks of gas block with 25 bbl return. Current depth set at 5000 feet. Bridge plug set at 1700 ft into the 9 5/8¿. |
1975386 | Primary Facility | 2011-04-26 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5. Conductor pipe set at 32 ft using 26¿ pipe. First stringer set at 419 ft using 20¿ pipe. Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns. No voids or mines present. Hence, no baskets were used. Chief underlain drilling rig and associated equipment with protective layer of grip plastic for the prevention of a surface release. The site is bermed around the edges of the plastic. |
2003238 | Primary Facility | 2011-09-08 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well sign, ES plan, and ESCGP-1 present. Site gated with 24hr security onsite. Well drilled not yet in production. Pad actively being re-rocked. Frac (empty) tanks present onsite; noted several with bottom lids open. Recommend operator close tank links in order to prevent a possible pollution and/or safety incident. All previously disturbed areas have been seeded and mulched with growth observed. BMPs installed and functioning, appears sediment trap is full. Operator should continue to monitor and maintain ALL BMPs until final restoration is complete. No accelerated erosion or sedimentation issues noted. |
2016702 | Primary Facility | 2011-11-01 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection result of reported incident received by myself (as well as Marc Maestra) via phone call on Tues November 1, 2011 at 1050am from Chad Eisenman of Chevron. He called to provide notification of a discharge/release of an undetermined amount of flow back on to the grounds of the commonwealth. He stated that it is believed that secondary containment located beneath frac tanks overflowed. At the time of phone call no further data was available. |
2017970 | Primary Facility | 2011-11-03 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | follow up to operator reported incident on 11-1-11. At the time of inspection, it appears operator has removed approximately 6 inches of "pad" from areas affected by release. Contaminated soils are located on secondary containment on well pad. Department also observed various pilot test holes most likely used to determine the depth of extend of contamination--at this time visible evidence(liquid fraction or staining) of contamination not observed in holes. Operator also removed soils from access road. At the time of this inspection, it appears operator has controlled release and no "visible" evidence identified that area still contaminated by release, operator indicated plans to conduct sampling to ensure all continmated soils were removed, as well as confirm the area of contamination(width and depth). No new violations noted during this inspection, clean up of spill ongoing.Follow up inspections will be conducted to monitor and ensure clean up meaures are being dillegently proceeded with. |
2034625 | Primary Facility | 2012-01-10 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Clean up measures /restoration ongoing. Site not yet stabilized from excavation. Contaminated soils removed hauled off. Samples taken. Written opr response and sample results recieved by department follow up inspection will be conducted to ensure site is properly stabilized. |
2046720 | Primary Facility | 2012-02-22 | Compliance Evaluation | No Violations Noted | CEI inspection for reportable release of flow back water onto and outside of secondary containment on 10/01/11. At the time of this inspection, site id sign, ESCGP-1, ES & PPC plan present. Security guard located at site entrance. Access road stable no accelerated ES. Well pad appears to be restored --previously excavated areas have reclaimed as additional fill materials placed on pad. All excavated materials were placed in roll off boxes and properly disposed of according to regulation. One roll off box remains onsite. |
2067305 | Primary Facility | 2012-05-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2069403 | Primary Facility | 2012-05-10 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Access road adequately rocked, no accelerated erosion or sedimentation issues noted. Well drilled, not yet in production. Previously disturbed areas seeded/mulched with observed growth. Appears site has been adequately restored. Pad adequately rocked. no accelerated erosion or sedimentation issues noted on site. No violations noted during this inspection. |
2093092 | Primary Facility | 2012-06-21 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2102882 | Primary Facility | 2012-09-21 | Routine/Complete Inspection | No Violations Noted | Inspection the result of the Operators’ request to discuss the restoration of the well pad area. At the time of inspection the site appeared to be in sound condition. The E&S plan was onsite and appeared to be implemented properly. All BMPs appear to be in installed and maintained as outline in the plan. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The Departments suggests the Operator maintain the perimeter control while restoring the site and inspect weekly and after significant precipitation event to ensure the continued stability of the site. The Department notes that the restoration plan calls for the restored cut and fill slopes of 3:1 and the dispersal of the top soil stock pile, however the approved plan does not call for the reduction in the size of the well pad. |
2121592 | Primary Facility | 2012-11-28 | Site Restoration | No Violations Noted | Site ID sign, E&S plan, ESCGP1, permit all on-site. HQ watershed. At time of inspection, well drilled, not yet equipped for production. Security on-site. |
2337710 | Primary Facility | 2015-01-22 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well was not equipped for production. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. Site had been constructed in accordance with the E&S plan contained within the ESCGP permit located onsite. |
2486276 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | well inactive. no issues onsite |
2532262 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | no issues. system running |
2559731 | Primary Facility | 2017-02-07 | Routine/Complete Inspection | No Violations Noted | Single well Marcellus pad.
According to Department records, well was SPUD on 4-21-2011, frac'd 10-2011 and given INACTIVE status on 5-23-12. The ESCGP-1 (ESX11-111-0002) for this site was terminated on 7-13-15. At time of inspection site ID sign, well permit, PPC plan, ERP, ESCGP-1 and E&S plan on site. No E&S issues observed on rocked access road. Gate located at well pad entrance. Site fenced. Well pad rocked, no E&S issues observed. Well head surrounded by security fence. Well tag present and legible. Well does not appear equipped for production. Operator is reminded that as per 25 Pa. Code § 78a.104, approval of inactive status for a well is valid for 5 years unless revoked. After 5 years, the owner or operator shall plug or return to active status a well granted inactive status unless the Department grants an application for a 1-year extension. |
2626068 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | well is at inactive mode. no issues at the site. |
2656060 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | Well is shut in. Annulus open. No. Pressure. Wel sign and tag present. Gates on well locked. No issues at well site |
2671996 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | Lpr energy filed for,inactive status. No issues at the site. well tag present. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2016702 | 623903 | 11/01/2011 | 2011-11-01 | 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
623903 | 276794 | NOV - Notice of Violation | Comply/Closed | 2012-02-22 | |||
623903 | 282710 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-04-18 | 2012-04-18 | $7,000.00 | $7,000.00 |
For data sources see[8]