If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-111-20306 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.757722,"lon":-79.356572,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Addison Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149073 | |
Farm/Lease Name: PMG GRACE UNIT 3H | |
License Status: | |
Spud Date: 2011-07-27 | |
Permit Date: 2011-06-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.757722 | |
Longitude: -79.356572 |
Date | Event |
---|---|
2011-06-23 | New Permit Application |
2011-07-23 | Performed Spud Operation |
2011-08-19 | Drilling Completion |
2012-09-06 | Drilling Completion |
2013-04-15 | Perforation |
2013-11-08 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-15 | 2013-04-29 | 8,819 | 6,535,220 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CMHPG | Ashland | Water Viscosifier | Carboxymethyl Hydroxporoyl Guar Blend | 68130-15-4 | 100 | 0.0029 | 0 |
EC 6116a | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.01546 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00129 | 0 | ||||
1, 1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00773 | 0 | ||||
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30 | 0.03714 | 0 | |
15% Hcl Acid | Reagent/PPG | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 15 | 0.07679 | 0 | |
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00717 | 0 | |
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | |||
GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00004000 | 0 | |
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00767 | 0 | |
Clean Volume | Chevron Applachia, LLC | Carrier/Base Fluid | H20 | 7732-18-5 | 100 | 88.48 | 0 | |
Proppant | Chevron Applachia, LLC | Proppant | Crystalline Sillica | 14808-60-7 | 100 | 11.52 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 402,159.00 | 177 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 531,557.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 353,952.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 203,524.56 | 361 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 153,569.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 243,573.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 257,538.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 364.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,325.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,170.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 574.09 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 220.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,895.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,266.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,585.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 647.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,183.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 26.67 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,810.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 33.56 Tons | LANDFILL | 100280 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,064.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | LPR ENERGY LLC | Produced Fluid | 335.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | LPR ENERGY LLC | Produced Fluid | 56.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | Produced Fluid | 78.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 325.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | LPR ENERGY LLC | Produced Fluid | 435.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | Produced Fluid | 146.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | LPR ENERGY LLC | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | LPR ENERGY LLC | Produced Fluid | 429.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 842.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid | 1,444.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1997384 | Primary Facility | 2011-08-04 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI. Toby Trip was representative for Chief. Conductor pipe set at 40 ft. (20¿¿pipe) and was grouted in place. 13 3/8¿ pipe set at 410¿ and used 315 sks of gas block (Universal cement) with 15 bbl. 9 5/8¿ pipe is going to be set at 2,144 feet with Universal performing cement using gas block. Deviation of hole is less than 1 %. DEP performed a site walk and did not find any issues. Current depth was 2,110 feet. |
2003965 | Primary Facility | 2011-09-08 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, Well ID Sign, ES plan, and ESCGP-1 present. Access road entrance and roadway appear adequately rocked and stable. Well drilled and actively being vented while onsite, not yet in production. Temporary BMPs installed according to plan (both 12in and 18in compost soxs) and functioning. Noted ¿stressed¿ vegetation alongside and surrounding sediment traps. It appears as possible evidence that sediment traps are not properly functioning and/or water is improperly draining to traps. Although no (active) accelerated erosion or sedimentation issues are noted during this inspection, due to recent heavy rains, it is recommend that operator examine and monitor sediment traps and areas surrounding to ensure that proper drainage is occurring in order to prevent a possible pollution event. Noted red staining at toe slope of pad, again previously attributed to decomposition of mulch/tress. Accompanied by WQS Marc Maestra during inspection. |
2016748 | Primary Facility | 2011-11-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well sign (multi- well pad), ES Plan, ESCGP-1, PPC Plan present. Site gated and locked, as well as monitored by security. Access road and well pad adequately rocked and maintained. Well drilled. Well head surrounded by metal fence. No accelerated erosion or sedimentation issues noted during inspection. Bmp's are installed and appear to be functioning, although operator should continue to monitor and maintain all bmp's until final permanent restoration is complete. Previously disturbed areas have been temporarily seeded/mulched with observed growth. No violations noted during this inspection |
2067337 | Primary Facility | 2012-05-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Well head was modified in order to drill gas well 2H. |
2078301 | Primary Facility | 2012-06-20 | Routine/Complete Inspection | No Violations Noted | |
2094696 | Primary Facility | 2012-08-06 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section. |
2094822 | Primary Facility | 2012-08-14 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section. |
2095548 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron had contracted Crown Rig #8. Current depth was 8200 feet. KOP was set at 8143 feet and TOM is estimated at 8700 ft. Currently, Chevron was in the process of changing drilling bit. |
2107591 | Primary Facility | 2012-10-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. |
2123143 | Primary Facility | 2012-12-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2144619 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all on-site. |
2160675 | Primary Facility | 2013-04-23 | Incident- Response to Accident or Event | No Violations Noted | Incident inspection. Company reported a 10 gallon spill. Company could not find spill location. Asked company to locate spill. |
2163937 | Primary Facility | 2013-05-02 | Follow-up Inspection | No Violations Noted | Follow up inspection to a 4/21/13 spill. Spill Cleaned up correctely. |
2169701 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2182697 | Primary Facility | 2013-07-11 | Routine/Complete Inspection | No Violations Noted | Met with chevron on site. No issues noted. |
2229830 | Primary Facility | 2013-09-26 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Well was in production. |
2297850 | Primary Facility | 2014-08-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Well was in production. |
2311294 | Primary Facility | 2014-10-08 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2408922 | Primary Facility | 2015-09-18 | Routine/Complete Inspection | No Violations Noted | Unconventional multi-well pad. |
2486274 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | no issues. system running |
2532261 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2548875 | Primary Facility | 2016-12-29 | Routine/Complete Inspection | No Violations Noted | Multi-well marcellus pad.
Site ID sign, E&S plan, ERP and PPC plan on site. At time of inspection no E&S issues observed on access road. Well pad surrounded by security fence. Well pad rocked, no E&S issues observed. Well appears equipped for production. Well tag present. Brine tank located in secondary containment appears structurally sound. |
2594475 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2594599 | Primary Facility | 2017-05-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2626065 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2656090 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | No issues. System producing. |
2672010 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | System running no,issues |
2672097 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | Well appears to be in production. Well head surrounded by cement barriers. Site gated. |
2685329 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
2700689 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Multi well site. Well appears to be in production. Three brine tanks on site. Well pad surrounded by security fence. Well head surrounded by cement barriers. |
2700704 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Well tag present and emergency contact information present. No issues at the site |
2766554 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well pad surrounded by security fence. Well head surrounded by cement barriers. Three brine tanks on site. |
For data sources see[8]