Well Details

Well ID: 37-111-20306
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149073
Farm/Lease Name: PMG GRACE UNIT 3H
License Status:
Spud Date: 2011-07-27
Permit Date: 2011-06-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.757722
Longitude: -79.356572

For data sources see[1][2][3]

Well History

Date Event
2011-06-23 New Permit Application
2011-07-23 Performed Spud Operation
2011-08-19 Drilling Completion
2012-09-06 Drilling Completion
2013-04-15 Perforation
2013-11-08 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-04-15 2013-04-29 8,819 6,535,220

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.0029 0
EC 6116a Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.01546 0
Dibromoacetonitrile 3252-43-5 5 0.00129 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00773 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.03714 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.07679 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00717 0
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00004000 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00767 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 88.48 0
Proppant Chevron Applachia, LLC Proppant Crystalline Sillica 14808-60-7 100 11.52 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 402,159.00 177 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 531,557.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 353,952.00 365 0.00 0 0.00 0
2016 LPR ENERGY LLC 203,524.56 361 0.00 0 0.00 0
2017 LPR ENERGY LLC 153,569.00 364 0.00 0 0.00 0
2018 LPR ENERGY LLC 243,573.00 364 0.00 0 0.00 0
2019 LPR ENERGY LLC 257,538.00 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 364.50 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,325.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,170.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 574.09 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,895.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 5,266.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,585.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 647.60 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,183.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 26.67 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 4,810.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 33.56 Tons LANDFILL 100280
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,064.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016 LPR ENERGY LLC Produced Fluid 335.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 56.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC Produced Fluid 78.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 CHEVRON APPALACHIA LLC Produced Fluid 325.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017 LPR ENERGY LLC Produced Fluid 435.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 146.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 LPR ENERGY LLC Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid 429.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 842.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid 1,444.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1997384 Primary Facility 2011-08-04 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI. Toby Trip was representative for Chief. Conductor pipe set at 40 ft. (20¿¿pipe) and was grouted in place. 13 3/8¿ pipe set at 410¿ and used 315 sks of gas block (Universal cement) with 15 bbl. 9 5/8¿ pipe is going to be set at 2,144 feet with Universal performing cement using gas block. Deviation of hole is less than 1 %. DEP performed a site walk and did not find any issues. Current depth was 2,110 feet.
2003965 Primary Facility 2011-09-08 Routine/Complete Inspection No Violations Noted At the time of inspection, Well ID Sign, ES plan, and ESCGP-1 present. Access road entrance and roadway appear adequately rocked and stable. Well drilled and actively being vented while onsite, not yet in production. Temporary BMPs installed according to plan (both 12in and 18in compost soxs) and functioning. Noted ¿stressed¿ vegetation alongside and surrounding sediment traps. It appears as possible evidence that sediment traps are not properly functioning and/or water is improperly draining to traps. Although no (active) accelerated erosion or sedimentation issues are noted during this inspection, due to recent heavy rains, it is recommend that operator examine and monitor sediment traps and areas surrounding to ensure that proper drainage is occurring in order to prevent a possible pollution event. Noted red staining at toe slope of pad, again previously attributed to decomposition of mulch/tress. Accompanied by WQS Marc Maestra during inspection.
2016748 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign (multi- well pad), ES Plan, ESCGP-1, PPC Plan present. Site gated and locked, as well as monitored by security. Access road and well pad adequately rocked and maintained. Well drilled. Well head surrounded by metal fence. No accelerated erosion or sedimentation issues noted during inspection. Bmp's are installed and appear to be functioning, although operator should continue to monitor and maintain all bmp's until final permanent restoration is complete. Previously disturbed areas have been temporarily seeded/mulched with observed growth. No violations noted during this inspection
2067337 Primary Facility 2012-05-04 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Well head was modified in order to drill gas well 2H.
2078301 Primary Facility 2012-06-20 Routine/Complete Inspection No Violations Noted
2094696 Primary Facility 2012-08-06 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
2094822 Primary Facility 2012-08-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Crown rig 8 was set up on well 2H to drill the curve and horizontal section.
2095548 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Crown Rig #8. Current depth was 8200 feet. KOP was set at 8143 feet and TOM is estimated at 8700 ft. Currently, Chevron was in the process of changing drilling bit.
2107591 Primary Facility 2012-10-09 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2123143 Primary Facility 2012-12-12 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2144619 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all on-site.
2160675 Primary Facility 2013-04-23 Incident- Response to Accident or Event No Violations Noted Incident inspection. Company reported a 10 gallon spill. Company could not find spill location. Asked company to locate spill.
2163937 Primary Facility 2013-05-02 Follow-up Inspection No Violations Noted Follow up inspection to a 4/21/13 spill. Spill Cleaned up correctely.
2169701 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2182697 Primary Facility 2013-07-11 Routine/Complete Inspection No Violations Noted Met with chevron on site. No issues noted.
2229830 Primary Facility 2013-09-26 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Well was in production.
2297850 Primary Facility 2014-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Well was in production.
2311294 Primary Facility 2014-10-08 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2408922 Primary Facility 2015-09-18 Routine/Complete Inspection No Violations Noted Unconventional multi-well pad.
2486274 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted no issues. system running
2532261 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted system running. no issues
2548875 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Multi-well marcellus pad.

Site ID sign, E&S plan, ERP and PPC plan on site. At time of inspection no E&S issues observed on access road. Well pad surrounded by security fence. Well pad rocked, no E&S issues observed. Well appears equipped for production. Well tag present. Brine tank located in secondary containment appears structurally sound.

2594475 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running. no issues
2594599 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted system running. no issues
2626065 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues
2656090 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted No issues. System producing.
2672010 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running no,issues
2672097 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well head surrounded by cement barriers. Site gated.
2685329 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700689 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi well site. Well appears to be in production. Three brine tanks on site. Well pad surrounded by security fence. Well head surrounded by cement barriers.
2700704 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2766554 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well pad surrounded by security fence. Well head surrounded by cement barriers. Three brine tanks on site.