Well ID: 37-111-20314 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.743636,"lon":-79.357572,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Addison Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149069 | |
Farm/Lease Name: PMG ALLEN UNIT 5H | |
License Status: | |
Spud Date: 2012-11-27 | |
Permit Date: 2012-07-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.743636 | |
Longitude: -79.357572 |
Date | Event |
---|---|
2012-07-23 | New Permit Application |
2012-11-27 | Performed Spud Operation |
2013-11-25 | Drilling Completion |
2014-08-12 | Perforation |
2016-04-29 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-12 | 2014-08-20 | 8,590 | 5,235,490 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00031317 | 0 |
15% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 15 | 0.00807452 | 0 | |
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 87.9628 | 0 | |
A264 | Schlumberger | Iron Control | Aliphatic acids | Proprietary | 30 | 0.00002419 | 0 | |
Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00002419 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00003225 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00000806 | 0 | ||||
EC6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00074205 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00012367 | 0 | ||||
Polyethylene Glycol | 25322-68-3 | 60 | 0.00148409 | 0 | ||||
B466 | Schlumberger | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.00075478 | 0 | |
Ammonium Acetate | 631-61-8 | 6 | 0.00015096 | 0 | ||||
Alcohol Ethoxylates | Proprietary | 5 | 0.0001258 | 0 | ||||
J134 | Schlumberger | Gel Breaker | Hemicellulase Enzyme | 9012-54-8 | 100 | 0.0015216 | 0 | |
J580 | Schlumberger | Gelling Agent | Carboydrate polymer | Proprietary | 100 | 0.0326808 | 0 | |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 11.8626 | 0 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00367429 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00077181 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 196,130.00 | 203 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 191,404.94 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 127,172.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 134,988.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 150,742.00 | 345 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 88.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 472.78 Tons | LANDFILL | 100172 |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 492.74 Tons | LANDFILL | 100419 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,867.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,727.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 28.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 82.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 58.23 Tons | LANDFILL | 76-00-08 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 23.48 Tons | LANDFILL | 100592 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,304.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 13.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 10,916.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.11 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2016 | LPR ENERGY LLC | Produced Fluid | 749.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | LPR ENERGY LLC | Produced Fluid | 102.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | Produced Fluid | 181.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,521.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | LPR ENERGY LLC | Produced Fluid | 356.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | Produced Fluid | 515.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | LPR ENERGY LLC | Produced Fluid | 538.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 420.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 821.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 1,111.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 156.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | LPR ENERGY LLC | Produced Fluid | 1,253.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid | 63.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2120888 | Primary Facility | 2012-11-30 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Surface casing was currently at 67feet from grade. |
2121598 | Primary Facility | 2012-11-28 | Routine/Complete Inspection | No Violations Noted | Inspection result of spud notification.Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site. Spoke to PIC Larry Dobbs who informed DepT that drilling for 5H had begun morning of 11/27/12.At the time of this inspection, actively drilling 5H, 1H had been drilled, cellars for 2H,3H,4H constructed, 6H staked.Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.Observed tophole cuttings along soil pile. Dept spoke with company rep who stated plans were to incorporate cuttings into soil pile and disperse across pad.Opr will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.Access road adequately rocked and no E&S issues were noted in relation to access road.Department recommends that Operator continues to monitor and maintain access road and well-site as necessary. |
2123111 | Primary Facility | 2012-12-12 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well. |
2128472 | Primary Facility | 2012-12-17 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well. |
2128639 | Primary Facility | 2013-01-08 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was setting the water protection pipe (16”) to a depth of 415 feet. Site safety meeting was held by Josh Nicholis. Chevron site supervisor was Ken Silvas. |
2130318 | Primary Facility | 2013-01-14 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well. |
2130320 | Primary Facility | 2013-01-14 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was setting the water protection pipe (16”) to a depth of 415 feet. Coal was encountered at 575 feet to 586 feet. Coal protection pipe (11 ¾”) was set at 581 feet. Cement basket was set at 556 feet. Pipe was cemented with 328 sacks of Class A and had a return cement of 8 bbl. The current depth was 1,837 feet. Chevron site supervisor was David Freed. |
2136134 | Primary Facility | 2013-02-05 | Incident- Response to Accident or Event | In Compliance with Policy | Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance. |
2143501 | Primary Facility | 2013-02-11 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 4H. |
2143516 | Primary Facility | 2013-02-22 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H. |
2144639 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 5H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 4H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121598) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches. |
2145396 | Primary Facility | 2013-02-25 | Follow-up Inspection | No Violations Noted | Admin Inspt. Spoke to Chevron representative Curtis Small via phone on 2/5/13. According to Mr. Small, on 1/23/13 a jug of antifreeze was spilled in bed of truck as it was being driven down access road. It leaked through the tailgate, resulting in a one-inch, 70 foot strip of antifreeze down the AR, totaling approximately a half-gallon in volume. Impacted gravel immediately shoveled into drum. Samples taken, will dispose of in landfill. It appears Operator handled situation according to policy and a follow-up inspection will be conducted in future to ensure full compliance. |
2151596 | Primary Facility | 2013-03-13 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H. |
2173646 | Primary Facility | 2013-06-10 | Routine/Complete Inspection | No Violations Noted | Routine inspectio no issues noted. |
2181332 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | Met on site with Chevron. Signed off on a minor modification to the restoration plan. |
2224967 | Primary Facility | 2013-11-26 | Routine/Complete Inspection | No Violations Noted | On 11/26/13 this Marcellus well pad inspection was conducted. Met with the PICs Doug Davis and Jonathan Michalec and inspected the site. The weather was cold and raining/snowing the day of the inspection. |
2228117 | Primary Facility | 2013-11-26 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present. Chevron completed drilling well 5H. The well was set at the following: KOP – 7156 ft., LP- 9561 ft., Vertical – 3056 ft. and MD – 13, 167 ft. |
2228280 | Primary Facility | 2013-10-31 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H. |
2228732 | Primary Facility | 2013-10-09 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H. |
2229863 | Primary Facility | 2013-09-26 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H. |
2235874 | Primary Facility | 2014-01-13 | Routine/Complete Inspection | No Violations Noted | On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet. |
2244510 | Primary Facility | 2014-02-10 | Routine/Complete Inspection | No Violations Noted | Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding an additional ramp tp allow the pipeline company access to their well controls. The access road will only be temporary. |
2250989 | Primary Facility | 2014-03-05 | Routine/Complete Inspection | No Violations Noted | On 3/5/14 met with Joe Brusco with Chevron and inspected the site. |
2252449 | Primary Facility | 2014-03-10 | Routine/Complete Inspection | No Violations Noted | On 3/10/14 met with Alex Grant with Chevron and inspected the site. |
2311286 | Primary Facility | 2014-10-08 | Routine/Complete Inspection | No Violations Noted | Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans. |
2408944 | Primary Facility | 2015-09-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well tag present and legible. |
2486262 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | no issues. system running |
2532220 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | system running |
2549715 | Primary Facility | 2016-12-29 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus pad.
Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692. |
2594471 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2594594 | Primary Facility | 2017-05-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2626057 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2656145 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | System running no,issues |
2672038 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | System running. No,issues. |
2672071 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection. |
2685388 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
2700772 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Well tag present and emergency contact information present. No issues at the site |
2700822 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection. |
2719557 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment. |
2766920 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed. |
For data sources see[8]