If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20075 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.535881,"lon":-76.612011,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 149044 | |
Farm/Lease Name: PHILLIPS 5H | |
License Status: | |
Spud Date: 2011-02-01 | |
Permit Date: 2010-11-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.535881 | |
Longitude: -76.612011 |
Date | Event |
---|---|
2010-11-17 | New Permit Application |
2011-01-13 | Performed Spud Operation |
2011-03-20 | Drilling Completion |
2011-09-02 | Perforation |
2013-07-26 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-08-23 | 2011-08-23 | 7,117 | 5,385,324 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexbreak 145 | Services Company, USA | Non-Emulsifier | |||||
Fresh Water | Carrier/Base Fluid | 81.82 | ||||||
TS-30 | TERRA Services | Scale Inhibitor | Sodium polycarboxylate | 100.00 | 0.01 | |||
Plexslick 921 | Pumpco Services | Friction Reducer | Polyethoxylated Alcohol Surfactants | 7.00 | 0.00383000 | |||
2-Propenoic acid, polymer with 2-propenamide | 9003-06-9 | 28.00 | 0.01 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 35.00 | 0.01 | |||||
Water | 7732-18-5 | 40.00 | 0.02 | |||||
Recycled Produced Water | Carrier/Base Fluid | 4.90 | ||||||
Feriplex 40 - Acid - Additives | Pumpco Services | Iron Control Agent | Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00101000 | ||
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00003000 | |||||
Water | 7732-18-5 | 60.00 | 0.00151000 | |||||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00005000 | |||||
Chlorine Dioxide | TERRA Services | Antibacterial Agent | Chlorine dioxide | 10049-04-4 | 5.00 | 0.00027000 | ||
Plexbreak 145 | Pumpco Services | Non-Emulsifier | Diethanolamine | 111-42-2 | 3.00 | 0.00002000 | ||
2-Butoxyethanol | 111-76-2 | 15.00 | 0.00011000 | |||||
Coconut oil acid/Diethanolamine condensate (2:1) | 68603-42-9 | 7.00 | 0.00005000 | |||||
Water | 7732-18-5 | 65.00 | 0.00049000 | |||||
Methanol | 67-56-1 | 15.00 | 0.00011000 | |||||
Sand (Proppant) | Proppant | 12.57 | ||||||
Plexhib 256 | Pumpco Services | Corrosion Inhibitor | Thiourea polymer | 68527-49-1 | 30.00 | 0.00020000 | ||
Methanol | 67-56-1 | 60.00 | 0.00041000 | |||||
Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00003000 | |||||
Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00020000 | |||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00007000 | |||||
Acid HCL | Pumpco Services | Acid | Water | 7732-18-5 | 85.00 | 0.52 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 1,316,171.00 | 300 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 383,425.00 | 346 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 241,017.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 269,097.00 | 322 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 178,591.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 131,301.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 136,895.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 8,922.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 604.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 12,874.48 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 107.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 319.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 2,432.13 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 424.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 125.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 222.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,162.42 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 263.60 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 30.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 21.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 9.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1940032 | Primary Facility | 2010-12-30 | Routine/Complete Inspection | No Violations Noted | |
1948460 | Primary Facility | 2011-02-03 | Drilling/Alteration | No Violations Noted | 20" - set to 80' |
1956428 | Primary Facility | 2011-03-09 | Drilling/Alteration | No Violations Noted | |
1964817 | Primary Facility | 2011-04-11 | Routine/Partial Inspection | No Violations Noted | well tag |
1984386 | Primary Facility | 2011-06-21 | Routine/Complete Inspection | No Violations Noted | 1 well - cellar full of water - no bubbles |
1994982 | Primary Facility | 2011-08-09 | Routine/Complete Inspection | No Violations Noted | 0 psi on gauge. 0% combustible gas coming off of annulus. Well not yet fract. Staging area of frac fluids for Matt |
1995437 | Primary Facility | 2011-08-09 | Routine/Complete Inspection | No Violations Noted | |
2029340 | Primary Facility | 2011-12-22 | Routine/Complete Inspection | No Violations Noted | |
2272272 | Primary Facility | 2014-05-17 | Routine/Complete Inspection | No Violations Noted | |
2452306 | Primary Facility | 2016-02-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.
Vegetative cover on site is generally greater than 70%, though some patches with less coverage were present. No evidence of accelerated erosion or sedimentation was observed. On February 24, 2016, the Department approved Chesapeake's request for a 2-year extension of time to restore the well site. As a condition of this approval, post construction stormater management BMPs must be constructed and operation by May 24, 2016. No violations were cited during this inspection. |
2503321 | Primary Facility | 2016-07-21 | Routine/Partial Inspection | No Violations Noted | Partial inspection to determine the status of installation of post-construction stormwater management (PCSM) BMPs. No Chesapeake representatives were present.
The PCSM BMPs have been installed as approved by the Department in February 2016 through the granting of a 2-year extension of time for site restoration. Erosion and sediment control BMPs and temporary stabilization have been installed, and no evidence of accelerated erosion or sedimentation was observed. No violations were cited during this inspection. |
2566798 | Primary Facility | 2017-03-02 | Routine/Complete Inspection | No Violations Noted | No violations cited. |
2612903 | Primary Facility | 2017-07-07 | Routine/Complete Inspection | No Violations Noted | One well in production phase. Five empty well cellars. One each sand and water separator. No leaks detected from production equipment. Site stable. No violations noted. |
2787950 | Primary Facility | 2018-10-11 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection. It had been raining throughout the day and several puddles had formed on the pad surface. Several locations were screened for conductivity and all had results less than 100 µS/cm.
There is 1 properly tagged Marcellus well staged for production. There is 1 GPU onsite and in secondary containment and one newer double walled fiberglass produced water tank not in traditional secondary containment. The old steel produced water tanks had been removed but their secondary containment remained along with a Waste Management temporary tank. There was 1 infiltration area PCSM onsite, however the final site restoration plans onsite state that no permanent PCSM is needed. The site was very well vegetated and no E&S issues were observed. It does not appear that an NOT has been submitted for this site. It is recommended that if the site meets restoration criteria, stormwater management has been added or removed as necessary, and the site is ready for permit termination an NOT be s |
For data sources see[8]