If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20110 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.533286,"lon":-76.230139,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Colley Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 144598 | |
Farm/Lease Name: ROUNDTOP S SUL 4H | |
License Status: | |
Spud Date: 2011-09-22 | |
Permit Date: 2011-09-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.533286 | |
Longitude: -76.230139 |
Date | Event |
---|---|
2011-09-01 | New Permit Application |
2011-09-21 | Performed Spud Operation |
2011-11-06 | Drilling Completion |
2012-04-27 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-04-25 | 2012-04-25 | 8,710 | 4,494,000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Recycled Produced Water | Carrier/Base Fluid | 12.53 | |||||
L058 | Schlumberger | Iron Control Agent | Sodium erythorbate | 6381-77-7 | 100.00 | 0.00023000 | ||
Ottawa Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 11.40 | |||
J609 | Schlumberger | Friction Reducer | Aliphatic amine polymer | 30.00 | 0.02 | |||
Ammonium sulfate | 7783-20-2 | 30.00 | 0.02 | |||||
Acid, Hydrochloric 15pct | Schlumberger | Acid | Water | 7732-18-5 | 85.00 | 0.23 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.04 | |||||
SC-30 | X-Chem | Scale Inhibitor | Sodium polyacrylate | 9003-04-7 | 100.00 | 0.00956000 | ||
B-84 | X-Chem | Antibacterial Agent | Glutaraldehyde | 111-30-8 | 27.00 | 0.00795000 | ||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.50 | 0.00162000 | |||||
Ethanol | 64-17-5 | 4.00 | 0.00118000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8.00 | 0.00236000 | |||||
A264 Corrosion Inhibitor | Schlumberger | Corrosion Inhibitor | Aliphatic acid | 30.00 | 0.00018000 | |||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00006000 | |||||
Aliphatic alcohols, ethoxylated # 1 | 30.00 | 0.00018000 | ||||||
Methanol | 67-56-1 | 40.00 | 0.00023000 | |||||
Fresh Water | Carrier/Base Fluid | 74.41 | ||||||
100 Mesh Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 1.21 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 143,767.00 | 57 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 842,554.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 540,439.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 304,617.00 | 245 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 124,951.00 | 41 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 606,305.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 413,689.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 338,517.00 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 1,100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 3,382.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 2,382.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 585.54 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 222.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 164.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2012696 | Primary Facility | 2011-10-20 | Drilling/Alteration | No Violations Noted | drilling at 4826 air hammer |
2018489 | Primary Facility | 2011-11-10 | Routine/Complete Inspection | No Violations Noted | |
2022919 | Primary Facility | 2011-11-30 | Routine/Complete Inspection | No Violations Noted | |
2115260 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | |
2196622 | Primary Facility | 2013-08-16 | Routine/Complete Inspection | No Violations Noted | |
2446107 | Primary Facility | 2016-02-02 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.
Temporary erosion and sediment control BMPs are in place around the pad, but have been removed along the access road. Overall, the site has >70% vegetative cover, though some patches with less cover exist. No evidence of accelerated erosion or sedimentation was observed. No violations were cited during this inspection. |
2542618 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.
Temporary erosion and sediment control BMPs are in place around the pad, but have been removed along the access road. Overall, the site has greater than 70% vegetative cover, with some areas that have less. No evidence of accelerated erosion or sedimentation was observed. No violations were cited during this inspection. |
2561759 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | Arrived @ 11:50. Weather: snow and ice on ground, sunny. No personnel were on site. There were two wells in production on a 6-slot set-up.
Roundtop S Sul 4H: cellar frozen, no bubbling. Top gauge: 1023 psi (digital) 13-3/8” x 9-5/8”; venting through 2” check valve, shut to dump line, no methane detected at valve openings. 9-5/8” x 5-1/2”: 13.6 psi (digital) 5-1/2”: 68.89 (digital). There were no violations at the time of my inspection. Left @ 12:10. |
2604095 | Primary Facility | 2017-06-14 | Routine/Complete Inspection | No Violations Noted | Two wells in production phase. Two each sand and water separators. No leaks from production equipment. Site has e&s concerns with water retention and temp control removal. No violations taken at this time. |
2729663 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | Arrived at 1349. Weather: sunny and nice. There are two producing wells with lift assist on a 6 Slot set up. All cellars are full of water. |
2805507 | Primary Facility | 2018-11-20 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 11:35; the weather was ~40°F, calm, and the ground was snow covered. A work area was plowed around the production equipment.
There were 2 properly tagged Marcellus wells staged for production. There was a total of 6 well cellars onsite and filled with water; no bubbling was observed. There were 2 each GPUs, produced water tanks, and sand separators onsite and in secondary containment. The containment around the produced water tanks contained a small amount of frozen water. The snow cover prevented the proper assessment of vegetative cover. However, large amounts of taller grasses and vegetation were visible above the snow. No obvious E&S issues were observed. According to Department records the ESCGP for this site expired on 7/25/15. There does not appear to be any active well permits or restoration extensions for this site. It is recommended that an NOT be submitted in the spring or summer if this site is ready for permit termination. No violations noted. |
For data sources see[8]