If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20212 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5334,"lon":-76.601294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149737 | |
Farm/Lease Name: RUNABUCK UNIT | |
License Status: Active | |
Spud Date: 2013-07-10 | |
Permit Date: 2013-05-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.5334 | |
Longitude: -76.601294 |
Date | Event |
---|---|
2013-05-28 | New Permit Application |
2013-07-11 | Performed Spud Operation |
2013-08-31 | Drilling Completion |
2013-09-18 | Perforation |
2013-10-03 | Perforation |
2013-10-03 | Performed Stage 1 of Stimulation |
2013-10-03 | Performed Stage 2 of Stimulation |
2013-10-03 | Performed Stage 3 of Stimulation |
2013-10-04 | Perforation |
2013-10-04 | Performed Stage 4 of Stimulation |
2013-10-04 | Performed Stage 5 of Stimulation |
2013-10-04 | Performed Stage 6 of Stimulation |
2013-10-04 | Performed Stage 7 of Stimulation |
2013-10-05 | Perforation |
2013-10-05 | Performed Stage 10 of Stimulation |
2013-10-05 | Performed Stage 11 of Stimulation |
2013-10-05 | Performed Stage 12 of Stimulation |
2013-10-05 | Performed Stage 8 of Stimulation |
2013-10-05 | Performed Stage 9 of Stimulation |
2013-10-06 | Perforation |
2013-10-06 | Performed Stage 13 of Stimulation |
2013-10-06 | Performed Stage 14 of Stimulation |
2013-10-06 | Performed Stage 15 of Stimulation |
2013-10-06 | Performed Stage 16 of Stimulation |
2013-10-06 | Performed Stage 17 of Stimulation |
2013-10-06 | Performed Stage 18 of Stimulation |
2013-10-07 | Perforation |
2013-10-07 | Performed Stage 19 of Stimulation |
2013-10-07 | Performed Stage 20 of Stimulation |
2016-07-12 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-02 | 2013-10-07 | 7,309 | 6,350,480 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BA-40L | Halliburton | Buffering Agent | Potassium Carbonate | 584-08-7 | 60 | 0.001 | 0 |
Bactron K-139 | Champion Technologies | Biocide | Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.004 | 0 | |
Glutaraldehyde | 111-30-8 | 5 | 0.002 | 0 | ||||
Ethanol | 64-17-5 | 5 | 0.002 | 0 | ||||
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.02 | 0 | |
Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10 | 0.001 | 0 | |
Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.1 | 0 | |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.88 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-10-03 | 1 | Sand | 5,989,494 | 7,796 | 8,617 |
2013-10-03 | 2 | Sand | 5,989,494 | 7,664 | 8,315 |
2013-10-03 | 3 | Sand | 5,989,494 | 7,603 | 8,380 |
2013-10-04 | 4 | Sand | 5,989,494 | 7,849 | 8,613 |
2013-10-04 | 5 | Sand | 5,989,494 | 7,523 | 8,451 |
2013-10-04 | 6 | Sand | 5,989,494 | 7,521 | 8,222 |
2013-10-04 | 7 | Sand | 5,989,494 | 7,285 | 8,175 |
2013-10-05 | 8 | Sand | 5,989,494 | 7,085 | 8,148 |
2013-10-05 | 9 | Sand | 5,989,494 | 7,941 | 8,535 |
2013-10-05 | 10 | Sand | 5,989,494 | 7,624 | 8,468 |
2013-10-05 | 11 | Sand | 5,989,494 | 7,392 | 8,072 |
2013-10-05 | 12 | Sand | 5,989,494 | 7,241 | 8,101 |
2013-10-06 | 13 | Sand | 5,989,494 | 7,262 | 8,220 |
2013-10-06 | 14 | Sand | 5,989,494 | 7,214 | 8,150 |
2013-10-06 | 15 | Sand | 5,989,494 | 7,192 | 8,246 |
2013-10-06 | 16 | Sand | 5,989,494 | 7,055 | 7,903 |
2013-10-06 | 17 | Sand | 5,989,494 | 6,950 | 8,084 |
2013-10-06 | 18 | Sand | 5,989,494 | 6,641 | 8,144 |
2013-10-07 | 19 | Sand | 5,989,494 | 6,440 | 8,238 |
2013-10-07 | 20 | Sand | 5,989,494 | 6,355 | 7,316 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 2,866,276.00 | 266 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 1,855,005.85 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,170,900.55 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 840,876.63 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 703,030.92 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 420,235.04 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 2,873.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 462.19 Tons | LANDFILL | 301358 |
2013 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 22.16 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 669.49 Tons | LANDFILL | 100933 |
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 700.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 3,219.46 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 1,868.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 970.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 30.55 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 429.26 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 96.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 359.19 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 82.25 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2178371 | Primary Facility | 2013-06-26 | Routine/Complete Inspection | No Violations Noted | No temporary stabilization along access road slopes. 102.22 calls for temp stab after 4 days, but do not have time frame. |
2190325 | Primary Facility | 2013-08-08 | Drilling/Alteration | No Violations Noted | |
2213941 | Primary Facility | 2013-10-16 | Routine/Complete Inspection | No Violations Noted | |
2248348 | Primary Facility | 2014-02-25 | Routine/Partial Inspection | No Violations Noted | |
2434067 | Primary Facility | 2015-12-16 | Routine/Complete Inspection | No Violations Noted | Arrived at 10:04, weather cold and cloudy. There is one TD’d well on this location. There was water in the cellar, no BAW. |
2452062 | Primary Facility | 2016-02-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general conditions on site. No Chief representatives were present.
Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. Surface conductance of puddles on the pad was not screened due to puddles being frozen. No violations were cited during this inspection. |
2543339 | Primary Facility | 2016-12-09 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall conditions on site. No Chief representatives were present.
Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. An extension of time for site resotration was approved by the Department on August 11, 2016. A condition of the restoration extension requires the installation of post-construction stormwater management (PCSM) BMPs by November 11, 2016. Chief has requested an extension of time to install the PCSM BMPs. No violations were cited during this inspection. |
2689581 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted. |
2796345 | Primary Facility | 2018-10-26 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 09:45. Steve from Waste Management arrived at the same time. He was dropping off a dumpster near the produced water tanks. He believed that Chief was coming to the pad later that day to clean out the tanks.
There was 1 properly tagged Marcellus well staged for production. There was also 1 GPU, 1 compressor and 2 produced water tanks onsite and in secondary containment. The well cellar contained some water; no bubbling was observed. The site was >70% vegetative cover and no E&S issues were observed. According to plans onsite PCSM appeared to be constructed and functioning as designed. Some compost filter sock remained onsite (Photos #1, 3). Department records indicate that the ESCGP does not expire until 11/12/22. No violations noted. |
For data sources see[9]