{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.514389,"lon":-76.679783,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149632 | |
Farm/Lease Name: I HARVEY UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-08-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.514389 | |
Longitude: -76.679783 |
Date | Event |
---|---|
Deviated | |
2013-08-13 | New Permit Application |
2014-07-30 | Permit Renewal Application |
2014-09-07 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-04-13 | 2015-04-20 | 7,871 | 6,956,840 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10 | 0.0005 | 0 |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.905 | 0 | |
Hydrochloric Acid | Universal | Acid | Hydrochloric Acid | 7647-01-0 | 37 | 0.06 | 0 | |
Unislik ST 50 | Universal | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.03 | 0 | |
Bactron K-139 | Champion Technologies | Biocide | Glutaraldehyde | 111-30-8 | 5 | 0.002 | 0 | |
Ethanol | 64-17-5 | 5 | 0.002 | 0 | ||||
Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.004 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 1,226,295.64 | 236 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 810,766.23 | 330 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 441,545.21 | 335 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 281,705.97 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 228,673.14 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,236.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 596.22 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Drill Cuttings | 12.60 Tons | LANDFILL | 100933 |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 12,376.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Drill Cuttings | 607.85 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 27,246.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 280.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 440.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 2,050.24 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 97.55 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 2,695.30 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 1,459.43 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 1,551.25 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2273047 | Primary Facility | 2014-05-22 | Preoperation Inspection | No Violations Noted | 14:00 preoperational inspection. The pad is being constructed there are no gas well on this location. Frank Ferrana (J.P. Reilly construction contractors) working on site. Location does not have any significant drainage prblems, subsurface is shaley. Perimeter E&S controls are in place, ditches in place as per the plan, sediment retentionl basin in place. Temporary stabilziation good. There were some very minor earth slips along the base of the fill slope, these will be addressed during compaction. |
2311412 | Primary Facility | 2014-10-08 | Routine/Complete Inspection | No Violations Noted | |
2434083 | Primary Facility | 2015-12-16 | Routine/Complete Inspection | No Violations Noted | Arrived at 10:34, weather cold and cloudy. There were 3 wells on this location, 1 in production and the other two TD’ed. |
2481013 | Primary Facility | 2016-05-04 | Routine/Complete Inspection | No Violations Noted | The site currently has >70% coverage of perennial vegetation and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.
The electrical conductance of puddles was not screened due to the absence of puddles. The Erosion and Sediment Control General Permit for this site expires on 01/01/2018, and no current well permits exist. Chief has indicated that it plans to partially restore the well pad by the autumn of 2017. In order to remain in compliance with the Department's regulations regarding site restoration (Title 58 Pa. C.S. § 3216), Chief should obtain a new drilling permit or request a 2-year extension of time for site restoration. No violations were cited during this inspection. |
2499043 | Primary Facility | 2016-06-30 | Routine/Complete Inspection | No Violations Noted | Well in production. top gauge: 1000 psi (0-5000 psi, analog).
13" x 9-5/8": 0% methane. |
2554460 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | Pending | Routine inspection to assess overall site conditions post-fracking operations. No Chief representatives were present.
The surface of the well pad and access road were extremely muddy due to recent rains, snowmelt, and heavy truck traffic. Recently installed compost filter sock was in place in the field on the downslope side of the access road. No filter medium was present along the upslope sock/ground surface interface as prescribed by the Erosion and Sediment Pollution Control Program Manual (Technical Guidance No. 363-2134-008, Detail 4-1, page 65)(E&S manual). The absence of this filter media allowed sediment to flow underneath the sock in several locations in the vicinity of the guard post. The sediment that flowed under the filter sock continued downslope a short distance and possibly outside of the limit-of-disturbance for the site, but did not affect any aquatic resources or result in a significant accumulation of sediment that would negatively impact land use at that location. Erosion and sediment |
2647739 | Primary Facility | 2017-10-16 | Routine/Complete Inspection | No Violations Noted | Three wells staged for production. Three each dehydration units within containment. No leaks detected. No violations noted. |
2650770 | Primary Facility | 2017-10-23 | Routine/Complete Inspection | No Violations Noted | Arrived at 14:08. Weather: overcast, windy. 3 producing wells onsite. Annuli open and venting to 550-gallon polytank. No combustibe gas detected at polytanks. 3 GPUs, 3 produced water tanks. 1 Harvey 3H adding foam. No violations observed. |
2784689 | Primary Facility | 2018-10-03 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection. The pad size has been reduced and vegetation is established on restored area.
There are 3 properly tagged Marcellus wells staged for production. The well cellars contained water but not bubbling was observed. There are also 3 GPUs and 3 produced water tanks onsite and in secondary containment. There was very little water in secondary containment. A small amount in the GPU containment had a conductivity of 150.8 µS/cm. Overall the site is >70% vegetation and no E&S issues were observed. The E&S inspection log and other pertinent paperwork was present onsite. The department recommends inspecting and repairing equipment and storage as needed. At the time of inspection there was some minor rusting on the produced water tanks (Photo #5). No violations noted. |