If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20312 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.341033,"lon":-76.604069,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Shrewsbury Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: | |
Farm/Lease Name: EDKIN HILL UNIT 3P 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-09-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.341033 | |
Longitude: -76.604069 |
Date | Event |
---|---|
2014-09-15 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2310964 | Primary Facility | 2014-10-02 | Routine/Complete Inspection | No Violations Noted | Jeremy Rusczyk and I met with Rick Mays (EXCO), Kevin and Kyle Belles (Bower Construction) to review plans for construction of the pad and access road. The access road (often lying on bedrock) runs for ~ 1 mile and gently moves up contour as it follows a farm track/logging path across a south-facing hillside. The proposed access road is bordered by two small wetlands on the north side of the road. |
2321472 | Primary Facility | 2014-11-12 | Routine/Complete Inspection | No Violations Noted | RTNC- Shale being generated at the well pad is being used to construct both the well pad and access road. E&S controls are installed and functioning properly. Novio |
2339435 | Primary Facility | 2015-01-28 | Routine/Complete Inspection | No Violations Noted | |
2355905 | Primary Facility | 2015-03-27 | Routine/Complete Inspection | No Violations Noted | The access road is showing some signs of wear and breakdown as the frost comes out of the ground and the native shale top-rock wears but no signs of accelerated E&S (erosion and sedimentation) were noted. Soils were stabilized with straw mulch since the construction was completed outside the growing season. A few locations were showing signs of slumping and rain could cause some E&S issues in the coming month. I recommend keeping an eye on the stabilized slopes and access road. On the pad, flowback of the 2P 2H well (113-20330) had just been completed and equipment was being broken down. Field conductivity was between 8,000-13,000 umhos/cm on containment and a vacuum was being used to remove brine from containment before removing the liner for disposal. The highest specific conductivity noted off containment was 1760 umhos/cm in a small puddle. I asked the company man (Kevin Voltz) to keep vacuuming off the containment. No Violations Noted. |
2412146 | Primary Facility | 2015-10-01 | Routine/Complete Inspection | No Violations Noted |
For data sources see[5]