Well ID: 37-113-20337 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.548636,"lon":-76.649372,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149302 | |
Farm/Lease Name: SIGNORE NORTH UNIT 4H | |
License Status: | |
Spud Date: 2016-01-28 | |
Permit Date: 2015-04-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.548636 | |
Longitude: -76.649372 |
Date | Event |
---|---|
2015-04-06 | New Permit Application |
2016-01-28 | Performed Spud Operation |
2016-03-04 | Drilling Completion |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-09-26 | 2016-10-04 | 7,350 | 8,036,150 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unislick ST-50 | CESI Chemical | Friction Reducer | Listed Below | ||||
Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | |||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
Hydrochloric Acid (15%) | PVS | Acidizing | Listed Below | |||||
EC6486A | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Bactron K-139 | Nalco Champion | Biocide | Listed Below | |||||
Water | 7732-18-5 | 85 | 0.10312 | 81755 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00252 | 2000 | ||||
Water | 7732-18-5 | 80 | 0.02018 | 16002 | ||||
Alcohols, (C10-16), ethoxylated | 68002-97-1 | 5 | 0.00312 | 2477 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0182 | 14427 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Ethanol | 64-17-5 | 5 | 0.00126 | 1000 | ||||
Water | 7732-18-5 | 100 | 84.5833 | 67,061,700.0 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00006000 | 48 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00812 | 6440 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00312 | 2477 | ||||
Water | 7732-18-5 | 40 | 0.00213 | 1688 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 5 | 0.00312 | 2477 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 30 | 0.01875 | 14862 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00004000 | 28 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 4 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.0016 | 1266 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00126 | 1000 | ||||
Crystallilne silica | 14808-60-7 | 100 | 15.2023 | 12,053,100.0 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.0016 | 1266 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CHIEF OIL & GAS LLC | 968,228.78 | 75 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 2,894,992.46 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 1,569,088.28 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,155,682.84 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 14,060.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,313.05 Tons | LANDFILL | 301358 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 19,512.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 2,458.19 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 3,168.37 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 350.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 2,345.76 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 2,630.34 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2451640 | Primary Facility | 2016-02-18 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general conditions on site. No Chief representatives were present.
Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No ESCGP was issued for this site as the total area of disturbance is less than 5 acres. No evidence of accelerated erosion or sedimentation was observed. Drilling is currently underway. Containment was in place under the drill rig and appurtenant equipment. Containment was also being used for pumps and generators that were not within the drilling mat area. No evidence of leaks or spills was observed. At the time of inspection, the pad surface was very muddy. However, all of the mud was contained on the pad. No voilations were cited during this inspection. |
2460842 | Primary Facility | 2016-03-02 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general conditions on site. No Chief representatives were present.
Drilling activity is still underway. Site containment was in place and all equipment, chemicals, and fuels on site were located within the containment. No evidence of spills was observed outside of the containment on the pad surface. Some containments were partially filled with water; the water should be removed to provide maximum containment capacity. No violations were cited during this inspection. |
2462527 | Primary Facility | 2016-03-07 | Drilling/Alteration | No Violations Noted | Patterson 254 onsite, met with Company Man Paul Rico. Drilling depth was 685’for the Signore North Unit 5H at the time of my inspection. Drilling was stopped following BOP testing. Surface cement job had 14 bbls returned to surface. Drilling the surface hole had damaged the bit.
The rig previously drilled the Signore North Unit 4H. While pulling out of the well bore, the BHA washed out and had been left at the base of the curve. BHA had been fished out. Also on the 4H, mud weight had been increased to 13.1 ppg due to gas in the lateral. Left location @ 13:20. There were no violations at the time of my inspection. |
2529570 | Primary Facility | 2016-10-20 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess site conditions during flowback operations.
Screened electrical conductivity in puddls on the well pad surface. Readings ranged from 242 uS/cm to 879 uS/cm. No evidence of any spills such as staining, sheens, or odors were observed. An area of erosion has started near the southeast corner of the well pad. This appears to be the low corner of the pad, and it appears the flow has concentrated and eroded pad material down the fill slope. None of the eroded material has left the limit-of-disturbance for the site. Merle Wade of Chief was on site and informed of this finding. No violations were cited during this inspection. |
2534932 | Primary Facility | 2016-11-02 | Routine/Complete Inspection | No Violations Noted | Arrived @ 11:17. Routine inspection of unconventional gas pad following stimulation and flow back. The site was wet following heavy rain, a worker onsite was vaccing up standing water. Flow back equipment was onsite. The Signore North Unit 4H and Signore North Unit 5H were in production. The 1H was not in production at the time of my inspection. Left location @ 11:30. |
2598750 | Primary Facility | 2017-05-26 | Routine/Complete Inspection | No Violations Noted | Three wells in production phase. Three separators within containment. No leaks from production equipment. Site has very steep fill slopes and requires further stabilization to prevent further erosion. |
2812133 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 12:57; the weather was ~30°F and windy.
There were 3 properly tagged Marcellus wells staged for production. The well cellars were filled with ice. There were 3 GPUs onsite and in secondary containment. The secondary containment onsite was about 25% filled with ice. The pad area was reduced in size and the site was greater than 70% vegetative cover. No E&S issues were observed. No violations noted at the time of inspection. |