Well ID: 37-113-20362 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.542272,"lon":-76.403569,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Cherry Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 148570 | |
Farm/Lease Name: HURLEY UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2016-09-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.542272 | |
Longitude: -76.403569 |
Date | Event |
---|---|
2016-09-01 | New Permit Application |
2017-01-24 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-01 | 2017-06-09 | 7,874 | 8,899,090 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Chief Oil & Gas | Carrie/Base Fluid | Listed Below | ||||
SCAL 16484A | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
Hydrochloric Acid | PVS | Acidizing | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
Glutaraldehyde | 111-30-8 | 5 | 0.00126 | 1090 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02584 | 22413 | ||||
(Mineral oil) Light hydrotreated petroleum distillate | 64742-47-8 | 30 | 0.01914 | 16600 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00165 | 1430 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00829 | 7193 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 5 | 0.00319 | 2767 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00005000 | 44 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00319 | 2767 | ||||
Alcohols, (C10-16), ethoxylated | 68002-97-1 | 5 | 0.00319 | 2767 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00251 | 2180 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00165 | 1430 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Crystallilne silica | 14808-60-7 | 100 | 14.114 | 12,242,000.0 | ||||
Water | 7732-18-5 | 80 | 0.0201 | 17438 | ||||
Ethanol | 64-17-5 | 5 | 0.00126 | 1090 | ||||
Water | 7732-18-5 | 85 | 0.14643 | 127007 | ||||
Water | 7732-18-5 | 40 | 0.0022 | 1906 | ||||
Water | 7732-18-5 | 100 | 85.6191 | 74,262,900.0 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 6 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00009000 | 76 | ||||
BIOC11139A | Nalco Champion | Biocide | Listed Below | |||||
Unislick ST-50 | CESI Chemical | Friction Reducer | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | 2,267,434.59 | 201 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 3,089,897.99 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,977,117.18 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 4,700.19 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,262.44 Tons | LANDFILL | 301358 |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 420.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 1,365.25 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 458.41 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2553980 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall conditions on site. No Chief representatives were present.
Site vegetated with greater than 70% uniform perennial cover. No evidence of accelerated erosion or sedimentation was observed. Electrical conductance of puddles on the pad was not screened due to the absence of puddles. No violations were cited during this inspection. |
2560815 | Primary Facility | 2017-02-10 | Routine/Complete Inspection | No Violations Noted | Arrived at 13:00. Weather: snow on ground. Allison Crane personnel on location preparing the site for a rig move. There were 3 wells on location:
Hurley 1H in production, Annular vents shut-in and polytank disconnected. Hurley 2H spud, conductor only Hurley 3H spud, conductor only Left location at 13:30. |
2573840 | Primary Facility | 2017-03-22 | Routine/Partial Inspection | No Violations Noted | Inspection to assess site conditions during drilling operations. Due to snow cover, assessment of site conditions relating to erosion and sediment control could not be conducted. All chemicals and equipment were stored within containment. No violations cited during this inspection. |
2576465 | Primary Facility | 2017-03-29 | Routine/Partial Inspection | No Violations Noted | Inspection to assess site conditions during drilling operations. Numerous small spots of iridescent sheen were observed on puddles along the back (south) side of the well pad. The source of the spots is likely a piece of equipment with a small leak. Though the amount of sheen observed does not indicate that a reportable release occurred, it is recommended that all equipment be checked regularly for leaks and drips that could result in the release of fluids to the ground surface and surrounding environment. No violations were cited. |
2581203 | Primary Facility | 2017-04-11 | Routine/Complete Inspection | No Violations Noted | Inspection to assess conditions during drilling operations. No violations cited. |
2582100 | Primary Facility | 2017-04-11 | Drilling/Alteration | No Violations Noted | Arrived at 14:14. Weather: hot and sunny. At the time of my inspection the H&P 513 was completing the lateral and was at 10,700’. Met with company man Brandon Jesson who said the drilling was going well. Walked the site with the company man. The small location appeared to be well organized. Left 14:35. |
2586681 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | Drilling operations completed for 2H and 3H wells. The 1H well is in production phase. Rig matting is stacked on the corners of the pad and various supplies are left over from drilling operations. Rig secondary containment removed. Wells require appropriate identification tags. No violations enforced at this time. |
2608448 | Primary Facility | 2017-06-15 | Follow-up Inspection | No Violations Noted | Arrived at 10:40. Weather: cloudy, cooler. There were three wells at this location: The Hurley 1H, a producing well was shut-in. The Hurley 2H and 3H were TD’ed. I was accompanied by Jon Hafer (Chief), who also brought a fresh water truck, and a vac truck. The purpose of this inspection was to fill the cellars of the Hurley 2H and 3H with enough water to determine whether there was methane outside of surface casing. Water was added to each cellar to a level just above the wellhead flutes, where the cement between the conductor and surface casing was exposed. Following the addition of the water, we waited approximately 15 minutes and searched for any signs of bubbling. No signs of bubbling were seen in the cellars of the Hurley 2H and Hurley 3H. Following these observations, the vac truck removed the water from the cellars. The result of this inspection for the Hurly 2H and the Hurley 3H is NOVIO, because no violations were observed during this inspection. Left location @ 11:45. |
2614041 | Primary Facility | 2017-07-06 | Routine/Complete Inspection | No Violations Noted | No activity on pad when I arrived. Three wells on the pad, all tagged (although the tags on the 2H and 3H wells are temporary). 3 banks of Baker tanks in containment on the pad; small amounts of water in these containments showed conductance from .03- .5 mS/cm. Two poly tanks were present on the site, hooked to the annuli of the wells. The volume of fluid in these tanks was low 2-4" in the bottom) and had a slightly briny petroleum odor. These poly tanks should likely be in secondary containment, as the substances contained in them fall under the definition of "regulated substances". |
2621510 | Primary Facility | 2017-07-14 | Routine/Complete Inspection | No Violations Noted | |
2625585 | Primary Facility | 2017-08-14 | Routine/Complete Inspection | No Violations Noted | Arrived at 14:17. Weather: cloudy, humid. There were no personnel on site at the time of my inspection. There were three producing wells at this location: the Hurley Unit 1H, 2H and 3H.
Hurley 3H, cellar partly filled with gravel Top gauge: 2225 psi (0-5000 psi analog) The Hurley Unit 2H and 3H annuli were plumbed to the same poly tank. Methane was detected at the tank (30% methane/volume, Altair 5X gas meter calibrated on 8/14/17). 13-3/8” x 9-5/8”: no combustible gas detected 9-5/8” x 5-1/2”: 35% methane/volume. The result of this inspection was NOVIO, because no violations were observed at the time of the inspection. Left @ 14:35 |
2650780 | Primary Facility | 2017-09-06 | Administrative/File Review | Violation(s) Noted | |
2658782 | Primary Facility | 2017-09-06 | Administrative/File Review | Violation(s) Noted | Administrative inspection created to enter Enforcement Record for nippling up BOPs and tripping in the wellbore on the Hurley 3H less than eight hours after cementing. |
2788125 | Primary Facility | 2018-10-11 | Routine/Complete Inspection | No Violations Noted | Chief Oil & Gas submitted a site restoration extension request to the Department on 10/11/18. Arrived onsite earlier that day for a routine inspection. It had been raining throughout the day.
The pad has been partially reduced in sized and overall is >70% vegetative cover. All PCSM BMPs appeared to be installed and functioning as designed. There were some small areas lacking in vegetation but were stabilized with straw and netting. Compost filter sock (CFS) remained along the access road and surrounding the pad including the revegetated areas. At the entrance of the access road there was a low spot which was retaining water(Photo #9). There are 3 properly tagged Marcellus wells staged for production. There are 3 GPUs and 3 produced water tanks onsite and in secondary containment. The thief hatch on the 1H tank appeared to be open at the time of inspection (Photo #6). All secondary containment appeared to be in good condition. It is recommended that inspection and maintenance of production equipment and st |
2796336 | Primary Facility | 2018-10-26 | Routine/Complete Inspection | No Violations Noted | Chief Oil & Gas submitted a Notice of Termination (NOT) for the Hurley pad covered under ESX11-113-0023(1). The NOT was received by the Department on 10/24/18.
A routine inspection was recently conducted on 10/11/18, ID# 2788086. PCSM had been observed during this inspection. The site was well vegetated with the exception of some spots that were stabilized with straw and erosion control matting. During the inspection on 10/26/18 the straw covered areas showed some new vegetation growing. The pad size was previously reduced and the site was >70% vegetative cover. No E&S issues were noted during the inspection. However, compost filter sock (CFS) remained around most of the pad and along sections of the access road. Temporary E&S controls should be removed as part of site restoration. The Department recommends returning the NOT and resubmitting it after the CFS and any other materials not part of PCSM have been removed. No violations noted. |
2829852 | Primary Facility | 2019-01-18 | Routine/Complete Inspection | No Violations Noted | Chief Oil & Gas submitted a Notice of Termination (NOT) for the Hurley pad covered under ESX11-113-0023(1). The NOT was received by the Department on 1/17/19. Arrived onsite at 09:16; the weather was ~25°F and lightly snowing. The gate was open when I arrived.
There were 3 wells staged for production and the cellars were filled with gravel. There were 3 GPUs and produced water tanks in secondary containment. There was a single 550 gallon poly tank plumbed to the well annuli and not on additional secondary containment. This pad was previously inspected for an NOT on 11/8/18, ID# 2800885. During this inspection it was noted that PCSM had been addressed, the site appeared stable, and the site was greater than 70% vegetative cover. The NOT was returned based on compost filter sock (CFS) remaining in place. The CFS has since been removed and the contents spread over an area to serve as a soil amendment. The vegetation still appeared sufficient and overall the site appeared stable. The Department recommends ac |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2650780 | 799792 | 2017-09-06 | 78a85(c)2 | Environmental Health & Safety | ||
2650780 | 799793 | 2017-09-06 | 78a85(c)4 | Environmental Health & Safety | ||
2658782 | 801551 | 2017-09-06 | 2018-10-18 | 78a85(c)2 | Environmental Health & Safety | Nippling up BOP less than eight hours after cementing |
2658782 | 801552 | 2017-09-06 | 2018-10-18 | 78a85(c)4 | Environmental Health & Safety | Tripping in hole less than eight hours after cementing |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
801551 | 359429 | NOV - Notice of Violation | 2018-10-18 | ||||
801551 | 368514 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-10-18 | 2018-10-18 | $220,000.00 | $220,000.00 |
801552 | 359429 | NOV - Notice of Violation | 2018-10-18 | ||||
801552 | 368514 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-10-18 | 2018-10-18 | $220,000.00 | $220,000.00 |
For data sources see[8]