If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20380 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.564236,"lon":-76.606925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149240 | |
Farm/Lease Name: SAVAGE SOUTH UNIT | |
License Status: Active | |
Spud Date: 2017-11-17 | |
Permit Date: 2017-06-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.564236 | |
Longitude: -76.606925 |
Date | Event |
---|---|
2017-06-29 | New Permit Application |
2017-11-13 | Performed Spud Operation |
2018-01-10 | Drilling Completion |
2018-02-28 | Perforation |
2018-03-26 | Perforation |
2018-03-26 | Performed Stage 1 of Stimulation |
2018-03-26 | Performed Stage 2 of Stimulation |
2018-03-26 | Performed Stage 3 of Stimulation |
2018-03-27 | Perforation |
2018-03-27 | Performed Stage 4 of Stimulation |
2018-03-27 | Performed Stage 5 of Stimulation |
2018-03-27 | Performed Stage 6 of Stimulation |
2018-03-27 | Performed Stage 7 of Stimulation |
2018-03-27 | Performed Stage 8 of Stimulation |
2018-03-28 | Perforation |
2018-03-28 | Performed Stage 10 of Stimulation |
2018-03-28 | Performed Stage 11 of Stimulation |
2018-03-28 | Performed Stage 12 of Stimulation |
2018-03-28 | Performed Stage 9 of Stimulation |
2018-03-29 | Perforation |
2018-03-29 | Performed Stage 13 of Stimulation |
2018-03-29 | Performed Stage 14 of Stimulation |
2018-03-30 | Perforation |
2018-03-30 | Performed Stage 15 of Stimulation |
2018-03-30 | Performed Stage 16 of Stimulation |
2018-03-30 | Performed Stage 17 of Stimulation |
2018-03-30 | Performed Stage 18 of Stimulation |
2018-03-31 | Perforation |
2018-03-31 | Performed Stage 19 of Stimulation |
2018-03-31 | Performed Stage 20 of Stimulation |
2018-03-31 | Performed Stage 21 of Stimulation |
2018-03-31 | Performed Stage 22 of Stimulation |
2018-04-01 | Perforation |
2018-04-01 | Performed Stage 23 of Stimulation |
2018-04-01 | Performed Stage 24 of Stimulation |
2018-04-01 | Performed Stage 25 of Stimulation |
2018-04-01 | Performed Stage 26 of Stimulation |
2019-08-06 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-26 | 2018-04-01 | 7,413 | 8,672,370 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | ||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
Unislick CST-LA | Chemplex, Salvay Group | Friction Reducer | Listed Below | |||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
BIOC11219A | Nalco Champion | Biocide | Listed Below | |||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00004000 | 36 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 5 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00236 | 1980 | ||||
Copolymer of 2-Propenamide | 79-06-1 | 20 | 0.01272 | 10691 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Water | 7732-18-5 | 100 | 86.09 | 72,370,900.0 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 20 | 0.01272 | 10691 | ||||
Water | 7732-18-5 | 50 | 0.0318 | 26728 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.00127 | 1069 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.0016 | 1343 | ||||
Water | 7732-18-5 | 85 | 0.12339 | 103726 | ||||
Crystallilne silica | 14808-60-7 | 100 | 13.6723 | 11,493,500.0 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02177 | 18305 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00007000 | 62 | ||||
Water | 7732-18-5 | 40 | 0.00942 | 7920 | ||||
Methanol | 67-56-1 | 45 | 0.0106 | 8910 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00118 | 990 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Water | 7732-18-5 | 40 | 0.00213 | 1791 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00127 | 1069 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.0016 | 1343 | ||||
SCAL16486a | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Hydrochloric Acid | PVS | Acidizing | Listed Below |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-03-26 | 1 | Sand | 5,541,110 | 8,515 | 8,838 |
2018-03-26 | 2 | Sand | 5,541,110 | 8,437 | 8,937 |
2018-03-26 | 3 | Sand | 5,541,110 | 8,512 | 8,684 |
2018-03-27 | 4 | Sand | 5,541,110 | 8,436 | 8,765 |
2018-03-27 | 5 | Sand | 5,541,110 | 8,510 | 8,685 |
2018-03-27 | 6 | Sand | 5,541,110 | 8,633 | 9,066 |
2018-03-27 | 7 | Sand | 5,541,110 | 8,583 | 8,880 |
2018-03-27 | 8 | Sand | 5,541,110 | 8,262 | 8,965 |
2018-03-28 | 9 | Sand | 5,541,110 | 7,958 | 9,202 |
2018-03-28 | 10 | Sand | 5,541,110 | 8,391 | 8,911 |
2018-03-28 | 11 | Sand | 5,541,110 | 8,538 | 8,910 |
2018-03-28 | 12 | Sand | 5,541,110 | 8,290 | 8,730 |
2018-03-29 | 13 | Sand | 5,541,110 | 7,818 | 8,640 |
2018-03-29 | 14 | Sand | 5,541,110 | 7,962 | 8,736 |
2018-03-30 | 15 | Sand | 5,541,110 | 8,185 | 9,018 |
2018-03-30 | 16 | Sand | 5,541,110 | 8,352 | 9,038 |
2018-03-30 | 17 | Sand | 5,541,110 | 8,394 | 8,895 |
2018-03-30 | 18 | Sand | 5,541,110 | 7,940 | 9,021 |
2018-03-31 | 19 | Sand | 5,541,110 | 8,244 | 8,611 |
2018-03-31 | 20 | Sand | 5,541,110 | 7,890 | 8,210 |
2018-03-31 | 21 | Sand | 5,541,110 | 7,840 | 8,059 |
2018-03-31 | 22 | Sand | 5,541,110 | 7,832 | 8,249 |
2018-04-01 | 23 | Sand | 5,541,110 | 8,043 | 8,297 |
2018-04-01 | 24 | Sand | 5,541,110 | 7,772 | 8,172 |
2018-04-01 | 25 | Sand | 5,541,110 | 7,494 | 8,337 |
2018-04-01 | 26 | Sand | 5,541,110 | 7,543 | 8,522 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 1,363,919.91 | 262 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,166,063.67 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | Drill Cuttings | 73.93 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil | 1.87 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,710.39 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 13,404.09 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil & Gas Related Spills | 1.87 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 180.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 4,301.58 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2668472 | Primary Facility | 2017-12-06 | Routine/Complete Inspection | No Violations Noted | Arrived at 8:45. Weather: sunny, cold. CCI crew onsite changing out the flow arm on the Savage 1H. The 1H and South 1H, wells previously in production, were shut-in. The 4 new conductors are in place. Liner and mats are also in place. Left at 9:10. No violations were observed. |
2682013 | Primary Facility | 2018-01-11 | Drilling/Alteration | No Violations Noted | Arrived at 9:39. Precision 569 drilling the Savage South Unit 2H circulation prior to setting production casing at 14454'. This is the first of 4 new wells planned for this location. Already onsite are the Savage 1H and Savage South Unit 1H.
No violations were observed at the time of my inspection. |
2686018 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | I met Ty Marine when I arrived on-site. Precision rig #569 on location, Savage South 3H well drilled to TD (13913') and rig is currently running casing in the hole. Steady rain was falling. Overall, containment was in good condition and functioning properly; however, on the east edge of the sitewide containment, I noted 3 locations where rainwater was overtopping the berm in a steady stream. Ty said he had just had a vac truck working in this area, and another was due shortly. I strongly recommended to Ty that he set up a trash pump or other full-time system to keep this area clear of rainwater. A trash pump was already nearby, and Ty had a tank in the vicinity as well to pump to. Ty was setting up the trash pump when I departed. Based on the concentration of water on the eastern side of the containment, it seems that the pad elevation tapers off in this area, creating a low spot with a high potential for a release; I strongly recommend that Chief either keep all of their primary containment above th |
2695796 | Primary Facility | 2018-02-20 | Routine/Complete Inspection | No Violations Noted | Arrived at 11:00. Weather: warm. Crew from Mr. dirt and Patrik's washing up rig mats at the time of my inspection. There are a total of six wells on this pad. There are two older wells are currently shut in and four new wells they have not been frac'ed yet. No violations were observed the time of inspection. |
2709087 | Primary Facility | 2018-03-23 | Drilling/Alteration | No Violations Noted | Stimulation activities being conducted at this time. No leaks noted during site walk around. Containment appears sound. No violations noted. |
2711945 | Primary Facility | 2018-03-29 | Incident- Response to Accident or Event | Violation(s) Noted | Stimulation activities are occurring at the Savage well pad at this time. On 3/28/18 a truck driver of a residual waste hauling truck incorrectly positioned valving on the manifold system for the residual water (brine) tank battery and inadvertently added fluid to an already full baker tank. This mistake resulted in the baker tank overflowing one barrel beyond (tank position less thank 3 feet from edge of containment) containment.
Clean-up operations were under way during the DEP's visit on 3/29/2018. A vacuum truck and mini excavator were in use to removal material from a 15x30 foot area. All excavated soil was being placed on containment. The material volume to be excavated has yet to be determined. No samples collected by the DEP. Samples to be collected by Woodward and Curran to determine the extent of the clean-up operations. Violations noted. Permit 113-20380 to be referred to the DEP Environmental Clean-ups program for further 78a.66 compliance. |
2752434 | Primary Facility | 2018-07-17 | Administrative/File Review | No Violations Noted | On July 13, 2018 DEP's Environmental Cleanup's and Brownfield (ECB) program approved the state wide health final report pertaining to this release. The violations cited during your March 29, 2018 report ( IR#2711945) or considered resolved. |
2799549 | Primary Facility | 2018-11-06 | Routine/Complete Inspection | No Violations Noted | Chief Oil & Gas submitted a Well Site Restoration Report (WSRR) for the Savage pad. The WSRR was received by the Department on 10/23/18.
Arrive onsite at 12:40; weather was ~50°F, calm, light rain. Some puddles on the pad surface were screened for conductivity and all measurements were below 100 µS/cm. There were 6 properly tagged Marcellus wells staged for production. All cellars were filled with water; no bubbling was observed. There were 6 GPUs and 6 produced water tanks onsite and in secondary containment. The water in secondary containment around the produced water tanks had a conductivity of 2.50 mS/cm. This water should be removed by vac truck and not be discharged to the ground or permitted to enter Waters of the Commonwealth. There was a compressor on the pad and in secondary containment. This containment appeared sound but could possibly be better maintained around the edges and corners. There was also what appeared to be ventilation ductwork along the pad (Photo #2). Some sections of compost fi |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2711945 | 812353 | 2018-03-28 | 2018-07-13 | CSL 402(b) | Environmental Health & Safety | |
2711945 | 812354 | 2018-03-28 | 2018-07-13 | 78.56(a) | Environmental Health & Safety | One barrel of brine water released beyond containment. Secondary containment failed to contain pollutants. |
2711945 | 812355 | 2018-03-28 | 2018-07-13 | SWMA 301 | Environmental Health & Safety | A failure to properly store brine water caused pollution to the ground surface. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
812353 | 362720 | NOV - Notice of Violation | 2018-07-13 | ||||
812354 | 362720 | NOV - Notice of Violation | 2018-07-13 | ||||
812355 | 362720 | NOV - Notice of Violation | 2018-07-13 |
For data sources see[9]