If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20199 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.693978,"lon":-75.964042,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149507 | |
Farm/Lease Name: W CARLSON 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-08-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.693978 | |
Longitude: -75.964042 |
Date | Event |
---|---|
2009-08-13 | New Permit Application |
2009-12-23 | Performed Spud Operation |
2010-02-09 | Drilling Completion |
2010-06-11 | Perforation |
2010-06-11 | Performed Stimulation |
2010-11-15 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-06-11 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 7,540.62 | 155 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 253,121.65 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 175,119.81 | 354 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 163,461.64 | 349 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 49,910.47 | 286 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 125,972.37 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 103,610.53 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 101,928.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 91,824.00 | 339 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.96 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 7.00 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD085690592 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 235.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 14,935.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0027057 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 71.40 Tons | LANDFILL | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 20.20 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 116.20 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.50 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 9,051.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 116.20 Tons | LANDFILL | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,790.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 178.55 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,210.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 58.03 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 2.33 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 544.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 945.05 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 317.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.64 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 239.92 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 48.00 Tons | LANDFILL | 100945 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 7.65 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 7.90 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 18.36 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 2,904.41 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 424.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 901.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 972.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 246.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 284.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 101.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 4.57 Tons | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 349.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 273.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 376.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 222.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 348.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 45.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1855974 | Primary Facility | 2010-01-07 | Drilling/Alteration | No Violations Noted | At time of inspection, drill rig on site was Patterson 154. Depth of drilling was at 532' on water. Plans are to cement surface casing on next day. Surface casing proposed to be set to 1500' and cemented to surface. The reserve pit was lined and had approximately 15' of freeboard. Secondary containment was in place around the substructure and other equiment as needed. |
1884586 | Primary Facility | 2010-01-15 | Routine/Complete Inspection | No Violations Noted | |
1990431 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | |
2007871 | Primary Facility | 2011-09-02 | Follow-up Inspection | No Violations Noted | |
2035810 | Primary Facility | 2011-12-22 | Incident- Response to Accident or Event | No Violations Noted | |
2690922 | Primary Facility | 2018-02-05 | Administrative/File Review | No Violations Noted | Well Site Restoration Report required as per 78a.65 has been approved. No violations noted. If you have any questions, please contact me. |
For data sources see[8]