If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20227 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.711647,"lon":-75.886864,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 146558 | |
Farm/Lease Name: TEEL UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-10-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.711647 | |
Longitude: -75.886864 |
Date | Event |
---|---|
2009-10-02 | New Permit Application |
2009-12-10 | Performed Spud Operation |
2010-01-15 | Drilling Completion |
2010-03-15 | Perforation |
2010-03-15 | Performed Stimulation |
2012-12-07 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-03-15 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHIEF OIL & GAS LLC | 1,264,432.00 | 195 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 815,402.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 527,950.61 | 355 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 459,859.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 557,288.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 354,169.67 | 361 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 294,732.43 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 268,138.41 | 342 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 208,010.12 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 163,633.55 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 130.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 293.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,809.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 512.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 3,556.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 132.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 161.10 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 453.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 207.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 175.05 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 55.88 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 12.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 63.16 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 31.15 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1845595 | Primary Facility | 2009-10-26 | Routine/Complete Inspection | No Violations Noted | |
1845597 | Primary Facility | 2009-10-26 | Routine/Complete Inspection | No Violations Noted | |
1845636 | Primary Facility | 2009-11-04 | Routine/Complete Inspection | No Violations Noted | |
1852129 | Primary Facility | 2009-12-16 | Drilling/Alteration | No Violations Noted | I arrived on Site at 14:00 on 12/16/09. I met with the Tool Pusher on location who indicated the Company Man was offsite at that time. Drill Rig on site was Patterson 251. At the time of inspection, drilling depth was at 1974¿. Hole was being drilled on air. I completed a site inspection and was accompanied by the Toolpusher. I indicated to the Toolpusher that the plastic lining underneath the equipment should be rolled up to contain any potential spilled fluids. At the time of inspection, the plastic lining I observed was laying flat on the ground. |
1852640 | Primary Facility | 2009-11-18 | Routine/Complete Inspection | No Violations Noted | |
1855897 | Primary Facility | 2010-01-07 | Drilling/Alteration | No Violations Noted | I arrived on Site at 9:00 on 1/07/10. I met with the Tool Pusher on location who indicated the Company Man was offsite at that time. Drill Rig on site was Patterson 251. At the time of inspection, drilling depth was at TD of 9924¿. The Tool Pusher indicated that they were making runs in and out of the hole to clean it out prior to setting production casing. The reserve pit had approximately 8¿ of freeboard and the liner appeared to be in good condition. Plastic was down around the substructure to contain any spills of fluid. I indicated to the Tool Pusher that secondary containment should be installed around the mud storage tank. |
1871628 | Primary Facility | 2010-03-20 | Drilling/Alteration | Violation(s) Noted | |
1873578 | Primary Facility | 2010-03-23 | Follow-up Inspection | Violation(s) Noted | |
1881331 | Primary Facility | 2010-04-30 | Follow-up Inspection | Violation(s) & Outstanding Violations | previously cited for cutting blown beyond reserve pit. cuttings have not been cleaned up which is continuing violation of 25Pa section 78.54. Observed tear in reserve pit liner approx. 8" above fluid level. This is violation of 78.56 a(2). No company man on site at time of inspection. |
1899612 | Primary Facility | 2010-07-21 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | During an inspection completed on 4/30/10, I observed a large tear in the liner of the pit and cuttings that were blown beyond the limits of the pit. Since then, the cuttings that were blown beyond the pit have been scraped off the adjacent slope and place within the reserve pit. The cuttings have been place directly over the area of the pit where the tear was observed. According the to the Operator, the tear in the liner was repaired. In order to determine that the pit has been repaired, the cuttings in this area must be scraped off the sidewall of the pit so that a complete inspection of the repaired liner can be performed. Please arrange to have this work completed and the liner exposed. Notify DEP at the time the soil is to be removed and the liner exposed. |
1912239 | Primary Facility | 2010-08-16 | Follow-up Inspection | No Violations Noted | At time of instpection M. R. Dirt reclaiming pit. Cuttings and liner were removed and disposed of oof site. Pit is approx. 1/2 complete. Well has well tag. Well is online. Site ID sign is present. No violations were observed. Previous vilolations cited have been corrected. |
2685266 | Primary Facility | 2018-01-19 | Routine/Complete Inspection | No Violations Noted | There was no activity occurring at the site during the inspection. The entrance gate was unsecured. There were no violations noted. If you have any questions, please contact me. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1871628 | 583685 | 03/20/2010 | 2010-03-20 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | violation=overspray of cuttings beyond reserve pit |
1873578 | 584216 | 03/23/2010 | 2010-03-23 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | Failure to manage residual waste 6018.301 |
1873578 | 584217 | 03/23/2010 | 2010-03-23 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | Potential pollution to waters of the Commonwealth 402 |
1873578 | 584218 | 03/23/2010 | 2010-03-23 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | Failure to contain a pollutional substance in a lined pit or tank 78.56a |
1881331 | 586250 | 04/30/2010 | 2010-04-30 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | tear in liner observed 8" from fluid level. |
1881331 | 586251 | 04/30/2010 | 2010-04-30 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | continuing violation. cuttings blown beyond reserve pit were no cleaned up. previously cited for violation. |
For data sources see[8]