X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20245

Well Details

Well ID: 37-115-20245
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148623
Farm/Lease Name: JO BLAISURE 2
License Status: Active
Spud Date: 2010-05-19
Permit Date: 2009-12-14
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.782783
Longitude: -75.965450

For data sources see[1][2][3]

Well History

Date Event
2009-12-14 New Permit Application
2010-05-19 Performed Spud Operation
2010-07-10 Drilling Completion
2011-01-09 Perforation
2011-05-24 Performed Stage 1 of Stimulation
2011-05-25 Performed Stage 2 of Stimulation
2016-07-28 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-05-24 2011-05-24 6,823 580,860

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ferrotrol 300L BJ Services Company Iron Control Product Citric acid 77-92-9 70.00 0.00102000
Scaletrol 720 BJ Services Company Scale Inhibitor Ethylene glycol 107-21-1 35.00 0.00354000
Diethylene glycol 111-46-6 5.00 0.00051000
CI-14 BJ Services Company Corrosion Inhibitor Propargyl alcohol 5.00 0.00005000
Methanol 67-56-1 68.00 0.00069000
FRW-18 BJ Services Company Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Alpha 1427 BJ Services Company Antibacterial Agent Glutaraldehyde 111-30-8 30.00 0.00660000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00220000
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 7.00 0.00154000
Ethanol 64-17-5 5.00 0.00110000
Clay Master-5C BJ Services Company Clay Stabilization No hazardous ingredients 0.00067000
15 HCl BJ Services Company Acid Package Hydrochloric acid 7647-01-0 15.00 0.10
Sand (Proppant) Proppant 100.00 14.16
Water Carrier/Base Fluid 100.00 85.69

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-05-24 1 Ottawa White 13,267 5,006 0
2011-05-25 2 Ottawa White 13,267 4,842 4,842

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 14,226.31 92 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 46,175.69 365 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 29,726.21 363 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 26,203.65 262 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 16,322.84 363 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 25,623.54 364 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 18,197.95 354 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,186.00 276 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 6,055.00 326 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Basic Sediment 1.85 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 117.70 Tons LANDFILL THR029
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 154.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Drill Cuttings 46.80 Tons LANDFILL 101247
2010 CABOT OIL & GAS CORP Drill Cuttings 13.20 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 76.10 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 93.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 358.80 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drill Cuttings 76.10 Tons LANDFILL 8-4630-00010/00
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 562.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 4.03 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Basic Sediment 4.89 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Produced Fluid 795.02 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 1.78 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 92.81 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 161.24 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Drill Cuttings 0.75 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 54.57 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1,949.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drill Cuttings 24.00 Tons LANDFILL 100945
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Fracturing Fluid Waste 2.65 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 3.74 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2012 CABOT OIL & GAS CORP Basic Sediment 2.66 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 5.04 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 5.17 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 1,071.59 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 231.81 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 181.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 651.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 56.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 169.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 185.44 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.28 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 150.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 103.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 121.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 10.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 126.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1895958 Primary Facility 2010-06-23 Drilling/Alteration No Violations Noted Patterson 538 company man Ronnie Jones. Drilling on Fluid the whole hole. All the equipment on plastic. Drillers log current report formations.20" set @ 120' 13-3/8" set @ 550' cemented with 105sx 11.5 lb/gal class A, Tail 410 sx. 15.4lb/gal returns of 30 BBLs current depth of drilling 843' .
2054284 Primary Facility 2012-03-22 Routine/Complete Inspection No Violations Noted
2366119 Primary Facility 2015-05-01 Routine/Complete Inspection No Violations Noted
2467350 Primary Facility 2016-03-23 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:15 a.m., the cellar was about half full of water with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 344psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 12:25 a.m.

2517052 Primary Facility 2016-08-31 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination (NOT) for the Joseph Blaisure Pad 1 well site (Erosion and sediment permit 58-09-802). The wells associated with this site are as follows:

115-20239 115-20245 115-20400 115-20399 115-20401


The site was well vegetated with the correct perennial grasses, over the 70 percent perennial vegetative threshold and the earthwork was performed to specifications. There were no erosion or sedimentation issues with this site.

There were no violations

I recommend approval of the NOT for this site.

If there are any questions please feel free to contact me at (570) 346-5539

2548704 Primary Facility 2016-12-22 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:30p.m., the cellar was about a quarter full of ice. The (13x9) vent pipe was open and venting into the production tank, the (9x5) vent pipe was open and venting into the production tank. There was 562psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 13:15p.m.

2636148 Primary Facility 2017-09-14 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. All the annuli vent pipes were connected together and venting into the same tank. I took a walk around the location and there were no obvious concerns noticed.

2728171 Primary Facility 2018-05-08 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection for the Jo Blaisure pad. The wells associated with this pad are as follows: 115-20239, 115-20245, 115-20399, 115-20400, 115-20401. The wells were all properly labeled.

The access road and pad surface were solid and stable with no erosional issues.

The cut and fill slopes were stable and well vegetated and were greening up nicely. There did not appear to be any erosional issues.

There were no violations noted.

2743790 Primary Facility 2018-06-20 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 1.5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank at 100% LEL and 100% methane. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2838586 Primary Facility 2019-02-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was ice 2' below grade in the cellar and I was unable to check for gas. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References