If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20339 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.782239,"lon":-75.925294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Jessup Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147914 | |
Farm/Lease Name: C ROZELL 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.782239 | |
Longitude: -75.925294 |
Date | Event |
---|---|
2010-03-31 | New Permit Application |
2010-06-01 | Performed Spud Operation |
2010-06-28 | Drilling Completion |
2010-08-13 | Perforation |
2010-09-30 | Performed Stimulation |
2011-01-21 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-09-30 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 1,328,022.31 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 844,917.34 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 553,225.81 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 590,204.94 | 357 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 273,831.85 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 421,804.37 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 317,363.19 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 552,790.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 344,013.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.40 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 199.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 60.30 Tons | LANDFILL | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 17.10 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 98.10 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 119.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.30 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 6,257.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 98.10 Tons | LANDFILL | 8-4630-00010/00 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 524.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 107.57 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 8.07 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 32.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 144.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 250.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 1,489.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 161.00 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 20.81 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 17.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 141.32 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.67 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 3.78 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.28 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.92 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 29.68 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 859.37 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 248.45 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 199.26 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 748.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 204.63 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 98.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 121.04 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 147.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 58.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 136.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 144.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 185.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1895974 | Primary Facility | 2010-06-23 | Drilling/Alteration | No Violations Noted | Patterson 252 BOP was tested to 5000 psi. Held 30 minutes.Current depth driling @ 7174' Fresh water at 74'. Varies gas recorded on log. Cts 13-3/8" w/ 110sx 11.5ppg standard lead, 540sx tail 15.4ppg FB= 6' Noted that Longer shakers shutes were needed company man said he will get on it.. |
1962353 | Primary Facility | 2011-03-31 | Routine/Complete Inspection | Violation(s) Noted | No activity on site. Well (2H and 3H) are online. Rathole has not been filled in on 3H. Cellar of 2H should be pumped out- has residual waste in cellar. At rear of location observed trash scattered on ground. Drilling mud observed on ground sruface near plastic. |
2366604 | Primary Facility | 2015-05-04 | Routine/Complete Inspection | No Violations Noted | |
2450141 | Primary Facility | 2016-02-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:20 p.m., the cellar was about half full of water with no bubbling noticed, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 553psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 13:50 p.m. |
2543566 | Primary Facility | 2016-12-06 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 14:40p.m., the cellar was about a quarter full of water with no bubbling noticed. The (20x13) vent pipe was open and venting into a small plastic tank, the (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 560psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 15:05p.m. |
2629773 | Primary Facility | 2017-08-28 | Routine/Complete Inspection | No Violations Noted | At time of inspection, the well was in production.
I took a walk around the location and there were no obvious concerns noticed. |
2731719 | Primary Facility | 2018-05-15 | Routine/Complete Inspection | No Violations Noted | I conducted a RTNC inspection of the Rozell pad. The wells associated with this pad are the 115-20339 and 115-20340. The wells were properly labeled.
The access road and pad surface were firm and stable. The cut and fill slopes were gentle and well vegetated with no erosional issues noted. There were no violations noted. |
2741066 | Primary Facility | 2018-06-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2836170 | Primary Facility | 2019-02-06 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of ice and I was unable to check for gas. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1962353 | 607912 | 03/31/2011 | 2011-03-31 | 78.65(1)* - Rat hole not filled | Environmental Health & Safety | |
1962353 | 607913 | 03/31/2011 | 2011-03-31 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[8]