If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20399 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.782947,"lon":-75.965419,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Jessup Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148623 | |
Farm/Lease Name: JOSEPH BLAISURE 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.782947 | |
Longitude: -75.965419 |
Date | Event |
---|---|
2010-07-27 | New Permit Application |
2010-08-15 | Performed Spud Operation |
2010-11-04 | Drilling Completion |
2011-01-21 | Perforation |
2011-01-21 | Performed Stimulation |
2011-11-09 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-24 | 2011-05-24 | 6,666 | 3,152,772 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-14 | BJ Services Company | Corrosion Inhibitor | Propargyl alcohol | 5.00 | 0.00004000 | ||
Methanol | 67-56-1 | 68.00 | 0.00059000 | |||||
Scaletrol 720 | BJ Services Company | Scale Inhibitor | Diethylene glycol | 111-46-6 | 5.00 | 0.00052000 | ||
Ethylene glycol | 107-21-1 | 35.00 | 0.00364000 | |||||
Water | Carrier/Base Fluid | 100.00 | 88.41 | |||||
15 HCl | BJ Services Company | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
Alpha 1427 | BJ Services Company | Antibacterial Agent | Ethanol | 64-17-5 | 5.00 | 0.00114000 | ||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00228000 | |||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00160000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00685000 | |||||
Ferrotrol 300L | BJ Services Company | Iron Control Product | Citric acid | 77-92-9 | 70.00 | 0.00088000 | ||
Sand (Proppant) | Proppant | 100.00 | 11.45 | |||||
Clay Master-5C | BJ Services Company | Clay Stabilization | No hazardous ingredients | 0.00057000 | ||||
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-01-21 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 406,893.86 | 139 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 781,021.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 523,388.66 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 514,277.02 | 341 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 306,833.18 | 363 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 415,762.08 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 323,054.60 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 241,090.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 283,183.00 | 353 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.22 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 151.80 Tons | LANDFILL | THR029 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 199.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 60.30 Tons | LANDFILL | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 17.10 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 98.10 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 119.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 462.70 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 98.10 Tons | LANDFILL | 8-4630-00010/00 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 562.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 172.56 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 3.78 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 2.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 1,863.78 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 92.06 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.78 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 159.94 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 15.22 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.75 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 60.11 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 6,913.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 21.20 Tons | LANDFILL | 100945 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 11.60 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 8.74 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.33 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 8.05 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.49 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,323.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 323.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 295.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 947.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 254.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 219.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 269.96 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 1.65 Tons | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 182.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 144.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 269.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 38.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 471.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1924171 | Primary Facility | 2010-10-28 | Drilling/Alteration | No Violations Noted | Patterson 538. TD proposed=8800'. Halliburton was cement contractor. Had 60 bbls return to pit on 7" casing which is set at 7222'. Still have bubbling on 9 5/8" x 13 3/8" annulus. Annulus currently vented. Gauge placed on vent before squeeze jo was 160lbs. Have not gauged since squeeze. While on site, asked Co. Man to update site id sign. |
1926568 | Primary Facility | 2010-11-05 | Follow-up Inspection | Viol(s) Noted & Immediately Corrected | Follow up on spill reported on 11/3/10. Hose failure on discharge line on cetrifugal pump. Spilled 135 bbls drilling mud onto plastic. Spill occurred at 18:30 on the 3rd. Hands and vac trucks used to clean up spill. Violation cited of general requirements - failure to control fluids. Appears that mud was contained on plastic. I informed Operator that DEP will do follow up inspection when plastic is removed from site when drilling complete. It was strongly suggested to Operator to use factory hoses from solids control company on discharge side of pumps. |
2054288 | Primary Facility | 2012-03-22 | Routine/Complete Inspection | No Violations Noted | |
2366115 | Primary Facility | 2015-05-01 | Routine/Complete Inspection | No Violations Noted | |
2467356 | Primary Facility | 2016-03-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:15 a.m., the cellar was full of water with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x7) vent pipe was open and venting to a tank, the (7x4) vent pipe was open and venting to a tank, there was 606psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 12:25 a.m. |
2517054 | Primary Facility | 2016-08-31 | Site Restoration | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Joseph Blaisure Pad 1 well site (Erosion and sediment permit 58-09-802). The wells associated with this site are as follows:
115-20399
The site was well vegetated with the correct perennial grasses, over the 70 percent perennial vegetative threshold and the earthwork was performed to specifications. There were no erosion or sedimentation issues with this site. There were no violations I recommend approval of the NOT for this site. If there are any questions please feel free to contact me at (570) 346-5539 |
2548707 | Primary Facility | 2016-12-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:30p.m., the cellar was full of ice. The (13x9) vent pipe was open and venting into the production tank, the (9x7) vent pipe was open and venting into the production tank, the (7x4½) vent pipe was open and venting into the production tank. There was 576psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 13:15p.m. |
2636144 | Primary Facility | 2017-09-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. All the annuli vent pipes were connected together and venting into the same tank. I took a walk around the location and there were no obvious concerns noticed. |
2728173 | Primary Facility | 2018-05-08 | Routine/Complete Inspection | No Violations Noted | I performed a RTNC inspection for the Jo Blaisure pad. The wells associated with this pad are as follows: 115-20239, 115-20245, 115-20399, 115-20400, 115-20401. The wells were all properly labeled.
The access road and pad surface were solid and stable with no erosional issues. The cut and fill slopes were stable and well vegetated and were greening up nicely. There did not appear to be any erosional issues. There were no violations noted. |
2743794 | Primary Facility | 2018-06-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 1.5' below grade in the cellar and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank at 100% LEL and 100% methane. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2838580 | Primary Facility | 2019-02-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of ice and I was unable to check for gas. The (13x9), (9x7) and (7x4) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1926568 | 599032 | 11/05/2010 | 2010-11-05 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety |
For data sources see[9]