Well ID: 37-115-20427 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.671611,"lon":-75.855472,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149338 | |
Farm/Lease Name: SQUIER UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.671611 | |
Longitude: -75.855472 |
Date | Event |
---|---|
2010-08-13 | New Permit Application |
2010-09-19 | Performed Spud Operation |
2010-10-08 | Drilling Completion |
2012-06-01 | Perforation |
2012-06-01 | Performed Stimulation |
2013-05-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-31 | 2011-05-31 | 7,580 | 990,234 | |
2 | 2012-05-18 | 2012-05-18 | 7,580 | 3,392,046 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unislik ST 50 | Universal Well Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.09 | ||
Biocide EC 6116A | Universal Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | ||||
Dibromoacetonitrile | 3252-43-5 | 0.02 | ||||||
Polyethylene glycol | 25322-68-3 | |||||||
Sand (Proppant) | Universal Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 14.81 | ||
Water | Base Fluid | Water | 100.00 | 85.00 | ||||
ScaleHib 100 | Universal Well Services | Scale Inhibitor | Ethylene glycol | 107-21-1 | 0.04 | |||
FE OXCLEAR | Universal Well Services | Oxygen Scavenger | Ammonium bisulfite | 10192-30-0 | 0.01 | |||
2 | Unislik ST 50 | Universal Well Services | Friction Reducer | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.09 | ||||||
Fresh Water | Base Fluid | Fresh Water | 100.00 | 76.97 | ||||
Biocide - Bactron K 139 | Champion Technologies | Biocide | Ethanol | 64-17-5 | ||||
benzyl-C12-16 alkyldimethyl,chlorides | ||||||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | |||||||
Glutaraldehyde | 111-30-8 | 0.03 | ||||||
Water | Base Fluid | Water | 100.00 | 84.39 | ||||
Hydrochloric Acid 15 | Universal Well Services | Acid | Hydrochloric acid | 7647-01-0 | 0.62 | |||
Hydrochloric acid | 7647-01-0 | 0.61 | ||||||
Water | 7732-18-5 | |||||||
Hydrochloric Acid 15 | Frac Tech Services (FTS) | Acid | ||||||
Scale Inhibitor - Gyptron T-390 | Champion Technologies | Scale Inhibitor | ||||||
Methanol | 67-56-1 | 0.00900000 | ||||||
FE OXCLEAR | Universal Well Services | Oxygen Scavenger | Ammonium bisulfite | 10192-30-0 | 0.01 | |||
FRW-600 | Frac Tech Services (FTS) | Friction Reducer | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.06 | ||||||
Sand (Proppant) | Universal Well Services | Propping Agent | ||||||
Sand (Proppant) | Frac Tech Services (FTS) | Propping Agent | ||||||
Quartz | 14808-60-7 | 99.90 | 14.82 | |||||
Quartz | 14808-60-7 | 99.90 | 22.30 | |||||
Biocide EC 6116A | Universal Well Services | Biocide | Polyethylene glycol | 25322-68-3 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | |||||||
Dibromoacetonitrile | 3252-43-5 | 0.02 | ||||||
ScaleHib 100 | Universal Well Services | Scale Inhibitor | Ethylene glycol | 107-21-1 | 0.04 | |||
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-06-01 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 168,831.00 | 46 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 1,671,967.81 | 272 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 1,475,084.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 785,349.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 441,265.26 | 319 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 520,230.30 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 529,376.23 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 529,254.31 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 403,389.51 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 4,068.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 1,270.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 4,359.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 536.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 73.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 46.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 158.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 103.51 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 17.51 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 5.74 Tons | LANDFILL | 301358 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1912907 | Primary Facility | 2010-09-14 | Routine/Complete Inspection | No Violations Noted | No activity on site. conductor set and cellar cemented. Drillers log left in mailbox by Ziegenfuss. Reported 1" stream H20 at 90' and 1 3/4" stream at 115'. Mousehole drilled. Both pipes have metal plates welded over them. Planning on moving in big rig later in week. |
1914993 | Primary Facility | 2010-09-21 | Drilling/Alteration | No Violations Noted | Patterson 251. Drilling 12 1/4" hole to 1800' and then setting 9 5/8". Drillers log on site and up to date. Secondary containment in good condition. No pit- using closed loop system. No violations observed. |
1918668 | Primary Facility | 2010-10-07 | Drilling/Alteration | No Violations Noted | Pat. Rig 251. Drling depth @ TD = 10646', Setting 5 1/2" at 10613'. Haliburton on site to do cement job. Will bring cement back up into surface string. Have Ziegenfuss coming on site tomorrow to spud 2H well. |
1973714 | Primary Facility | 2011-05-13 | Routine/Complete Inspection | Violation(s) Noted | |
2016187 | Primary Facility | 2011-11-02 | Drilling/Alteration | No Violations Noted | Complete Fluid Control on site. Performing clean out run. Drilling out ice-plugs. Only well on site that has been fracced so far. Secondary containment in place. No violations observed. |
2035225 | Primary Facility | 2012-01-17 | Routine/Complete Inspection | No Violations Noted | |
2062242 | Primary Facility | 2012-04-17 | Incident- Response to Accident or Event | Pending | |
2316775 | Primary Facility | 2014-10-16 | Complaint Inspection | Pending | The Department (Andrea Mullen, Eric Rooney, Jon Sassi, and I) met with Jon Hafer (Chief Oil & Gas) on site at the Squier Unit Well Site to collect soil samples in response to a nearby water quality complaint. The Department collected the below referenced samples to be analyzed with the SAC 961 with the addition of sulfates, lead, calcium, bromide dry weight, and lithium : |
2549606 | Primary Facility | 2016-01-04 | Routine/Partial Inspection | No Violations Noted | |
2729092 | Primary Facility | 2018-04-17 | Follow-up Inspection | No Violations Noted | The Department was on site to meet with representatives of Chief Oil & Gas to conduct a Follow Up Inspection to the Department's 4/17/2012 inspection which was conducted in response to a self-reported and assumed vandalism incident causing the release of an approximate 500 bbl. of what was reported to be freshwater to the pad's surface. During the inspection conductivity screening revealed elevated readings in the perimeter ditch (Collection Ditch #1) and sediment trap below the location of the release. Additionally, dead amphibians were found within the confines of said sediment trap. A copy of the sample collected during the 4/17/2012 inspection is attached for your reference.
During this inspection, Eric Rooney (DEP-PG) and I met with Mike Walor (Woodard and Curran-Scientist) and Kellon Balum (Chief). At this time, Mr. Walor began to use an auger and a shovel to reach a depth of approximately 28" so that samples collected would be from the base of the sediment trap. The material was soft and water |
2741763 | Primary Facility | 2018-06-15 | Administrative/File Review | No Violations Noted | On 5/16/2018 the Department received an email from Richard Adams regarding the sample results from the 4/17/2018 sampling event at the Squier A Well Site. Chief Oil & Gas submitted a Field Sampling Plan to the Department on October 4, 2017 detailing their plan. Strontium and chloride were non-detect in any of the four samples (excluding background samples). Specific conductance was measured between 118-572 in the four samples associated with the sediment trap. Barium was detected below the MSC for soils at all sample points. At this time, the Department acknowledges the sample results and will resolve the pending inspection dated 4/17/2012. |
2822312 | Primary Facility | 2018-12-26 | Routine/Complete Inspection | No Violations Noted | I arrived on site at 1450 to perform a site restoration inspection.
After performing an administrative review of the plan and a site inspection, I do not agree that site conditions meet the requirements for the termination of this permit. Namely, the site did not meet 70 percent vegetative cover stabilization requirements for permit termination, and the footprint restored pad did not match the site plan. No violations were noted. |
2822870 | Primary Facility | 2018-12-26 | Routine/Complete Inspection | No Violations Noted | I arrived on site at 1450 to perform a site restoration inspection.
After performing an administrative review of the plan and a site inspection, I do not agree that site conditions meet the requirements for the termination of this permit. Namely, the site did not meet the 70 percent perennial vegetative cover stabilization requirements for permit termination, and the footprint of the restored pad did not match the site plan. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1973714 | 611307 | 05/13/2011 | 2011-05-13 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1973714 | 611308 | 05/13/2011 | 2011-05-13 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative |