If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.831592,"lon":-75.928536,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Jessup Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145337 | |
Farm/Lease Name: BONNICE 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.831592 | |
Longitude: -75.928536 |
Date | Event |
---|---|
2010-12-20 | New Permit Application |
2011-05-06 | New Permit Application |
2011-05-09 | Performed Spud Operation |
2011-07-24 | Drilling Completion |
2012-04-30 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CARRIZO (MARCELLUS) LLC | 185,673.00 | 45 | 0.00 | 0 | 0.00 | 0 |
2012 | CARRIZO (MARCELLUS) LLC | 1,341,331.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 923,791.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 673,831.94 | 275 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 290,844.43 | 136 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 673,514.78 | 288 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 738,934.82 | 341 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 576,470.91 | 354 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 619,746.32 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 406.00 Tons | LANDFILL | NY STATE #32S11 |
2011 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 11,658.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CARRIZO (MARCELLUS) LLC | Fracturing Fluid Waste | 5.89 Tons | LANDFILL | THR029 |
2012 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 12,109.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 769.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 720.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 173.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 703.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 23,800.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 27,020.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Basic Sediment | 60.03 Bbl | LANDFILL | THR029 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 534.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 407.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 325.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 487.89 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,189.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 303.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 59.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 217.03 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 446.96 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 100.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 222.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 306.63 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 553.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,893.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 82.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 317.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 371.10 Bbl | REUSE (AT WELL PAD) | |
2018 | BKV OPR LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 401.66 Bbl | REUSE (AT WELL PAD) | |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,823.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 105.63 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 665.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Produced Fluid | 2,071.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1987233 | Primary Facility | 2011-07-07 | Drilling/Alteration | No Violations Noted | HWD Rig #2. BOP charts posted and look ok. Drillers log on site and up to date. Checked cellar - no bubbling. Site lined with plastic and wood mats. 20" set at 35.5'. 13 3/8" set at 745' with a basket at 80'. 9 5/8" set at 1627'. Cement reports show good returns on both casing strings. Will follow up on purpose of basket in water string. |
2365646 | Primary Facility | 2015-04-29 | Routine/Complete Inspection | No Violations Noted | |
2465391 | Primary Facility | 2016-03-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:55 a.m., the cellar was full of water with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was 893psi on the production casing and 0psi on the production line. I took a walk around the location and everything looked OK.
I left the site at 11:40 a.m. |
2528704 | Primary Facility | 2016-10-13 | Site Restoration | No Violations Noted | The Department was on site to conduct a Notice of Termination for the Bonnice well pad and impoundment. The wells associated with this site are as follows:
115-20487 115-20488 115-21488
There were no violations. If there are any issues please feel free to contact me. |
2548717 | Primary Facility | 2016-12-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 9:15a.m., the cellar was about three quarters full of water and ice with no bubbling noticed, the vent pipe was open and venting into the production tank. There was a 5000psi pressure gauge on the production casing with about 800psi on it, and there was a 5000psi pressure gauge on the production line with about 500psi on it. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 9:55a.m. |
2636373 | Primary Facility | 2017-09-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. I took a walk around the location and there were no obvious concerns noticed. |
2744014 | Primary Facility | 2018-06-21 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 1.5' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2840252 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water and ice 1.5' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[7]