If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20489 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.817733,"lon":-75.93535,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Jessup Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145317 | |
Farm/Lease Name: SHASKAS SOUTH 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.817733 | |
Longitude: -75.935350 |
Date | Event |
---|---|
2010-12-20 | New Permit Application |
2011-06-16 | Performed Spud Operation |
2011-12-06 | Drilling Completion |
2012-08-17 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-03-27 | 2012-03-27 | 6,143 | 5,342,526 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 100 mesh | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 0.82 | |
CI-14 | Baker Hughes | Corrosion Inhibitor | Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00017000 | ||
Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00003000 | |||||
Methanol | 67-56-1 | 100.00 | 0.00058000 | |||||
Fatty acids, tall-oil | 61790-12-3 | 10.00 | 0.00006000 | |||||
Propargyl alcohol | 107-19-7 | 5.00 | 0.00003000 | |||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acidizing | Water | 7732-18-5 | 85.00 | 0.06 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.01 | |||||
Ingredients shown above are subject to 29 CFR 1910.1200(i) and appear on Material Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS. |
Polyacrylate | 0.00310906 | ||||||
Hydrochloric acid | 7647-01-0 | |||||||
Sorbitan Monooleate | 0.00386352 | |||||||
Ethoxylated Alcohol | 0.00154541 | |||||||
Poly (acrylamide-co-acrylic acid) | 0.02 | |||||||
Formalin | 50-00-0 | |||||||
Salt | 0.00386352 | |||||||
Water | 7732-18-5 | 0.06 | ||||||
Thiourea polymer | 68527-49-1 | |||||||
Sodium chloride | 7647-14-5 | 0.00000466 | ||||||
Potassium chloride | 7447-40-7 | 0.00000777 | ||||||
Hydrochloric Acid 5.1-7.5 | Baker Hughes | Acidizing | Hydrochloric acid | 7647-01-0 | 7.50 | 0.04 | ||
Water | 7732-18-5 | 92.50 | 0.56 | |||||
Alpha 1427 | Baker Hughes | Biocide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.00 | 0.00113000 | ||
Ethanol | 64-17-5 | 5.00 | 0.00113000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00676000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00225000 | |||||
Sand, White, 40/70 | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 4.68 | ||
InFlo 250W | Baker Hughes | Surfactant | Methanol | 67-56-1 | 30.00 | 0.00020000 | ||
Surfactants | 80.00 | 0.00053000 | ||||||
2-Butoxyethanol | 111-76-2 | 5.00 | 0.00003000 | |||||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Calcium chloride | 10043-52-4 | 5.00 | 0.00078000 | ||
Ethylene glycol | 107-21-1 | 30.00 | 0.00466000 | |||||
Ferrotrol 300L | Baker Hughes | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00150000 | ||
Ingredients shown above are subject to 29 CFR 1910.1200(i) and appear on Material Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS. |
Baker Hughes | Surfactant | ||||||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
Sand, White, 30/50 | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 6.52 | ||
Water | Operator | Carrier | Water | 7732-18-5 | 100.00 | 87.12 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CARRIZO (MARCELLUS) LLC | 904,420.00 | 251 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 905,545.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 838,098.56 | 342 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 606,510.16 | 258 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 640,314.43 | 339 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 553,122.86 | 339 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 283,595.73 | 342 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 436,804.47 | 357 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 45.22 Tons | LANDFILL | THR029 |
2011 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 100.00 Tons | LANDFILL | NY STATE #32S11 |
2012 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 18,187.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 745.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 437.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 109.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 86.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 9,165.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 9,165.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Basic Sediment | 90.91 Bbl | LANDFILL | THR029 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 192.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 432.92 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 228.52 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 809.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,454.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 198.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 70.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 65.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 161.73 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 304.47 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 182.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 105.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 63.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 203.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 84.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,453.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 243.55 Bbl | REUSE (AT WELL PAD) | |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 305.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 17.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | BKV OPR LLC | Produced Fluid | 42.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 128.55 Bbl | REUSE (AT WELL PAD) | |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 735.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 147.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Produced Fluid | 454.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2073373 | Primary Facility | 2012-04-27 | Routine/Complete Inspection | No Violations Noted | Specifics associated with this inspection can be referenced in the Shaskas South 5H inspection report. Permit number is 115-20652. |
2101038 | Primary Facility | 2012-07-06 | Routine/Partial Inspection | No Violations Noted | |
2157258 | Primary Facility | 2013-04-16 | Routine/Partial Inspection | No Violations Noted | |
2363024 | Primary Facility | 2015-04-07 | Routine/Complete Inspection | Violation(s) Noted | The Department, represented by Frank Hoehle and Scott Kuchta, was on site at the Shaskas well pad to conduct a routine complete inspection. The wells associated with this site are as follows: |
2365501 | Primary Facility | 2015-04-29 | Routine/Complete Inspection | No Violations Noted | |
2375442 | Primary Facility | 2015-05-26 | Incident- Response to Accident or Event | No Violations Noted | The Department arrived on-site at 13:00 in response to a release of an unknown volume of production fluid and the discovery of dead vegetation associated with the release. Carrizo has recently been visiting the site on a regular basis due to an erosion problem observed during an inspection conducted by the Department on 4/7/2015. The Department issued a Notice of Violation to Carrizo on 4/22/2015 due to failure of the cut slope. As the Department arrived, Carrizo was in the process of commencing repairs to the cut slope. Gary Byron, consultant of Carrizo, notified the Department via e-mail on 5/22/15 of Carrizo’s observance of an area of dead vegetation off the Southeast end of the pad. The dead vegetation pathway was back tracked to an area where (4) production fluid tanks were stored on secondary containment. Compromised liner integrity was discovered in the containment staging the production fluid tanks. Carrizo believes a small release of had occurred following storm events on 5/17/15 and 5/18/15. The release appears to exceed (42) gallons. |
2422335 | Primary Facility | 2015-10-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | The Department, represented by Frank Hoehle, was on site at the Shaskas well pad to conduct a routine complete inspection. The wells associated with this site are as follows: |
2464778 | Primary Facility | 2016-03-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:35 a.m., the cellar had water at the bottom with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was about 350psi on the production casing and about 640psi on the production line. I took a walk around the location and everything looked OK.
I left the site at 12:15 p.m |
2548720 | Primary Facility | 2016-12-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:35a.m., the cellar had ice at the bottom, the (9x5) vent pipe was open and venting into the production tank. There was 540psi on the production casing and 431psi on the production line. I took a walk around the location, there were twenty 500bbl tanks that were labeled fresh and on containment, the containment appeared to be in good condition. There were no obvious concerns noticed.
I left the site at 11:15a.m. |
2623770 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | The Shaskas South site was dry at the time of inspection. There was a crew dismantling the remains of the ion exchange storage area previously located on site. The pad surface was solid and stable, with no mud on the access road or ruts onsite. The cut and fill slopes were very well vegetated and stable and there were no erosional issues at the time of inspection. There was no bubbling observed in the well cellars during the inspection.
There were no violations observed. |
2636997 | Primary Facility | 2017-09-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. I took a walk around the location and there were no obvious concerns noticed. |
2661543 | Primary Facility | 2017-11-13 | Routine/Complete Inspection | No Violations Noted | I inspected the Shaskas South well pad for a Routine Complete inspection on November 13, 2017. The access road was not muddy and the pad surface was solid with some puddling due to recent rains. The cut and fill slopes were stable, solid and well vegetated at the time of inspection and there were no apparent erosional issues. There were no violations noted. |
2674909 | Primary Facility | 2017-12-07 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:53. The weather conditions were partly cloudy skies and breezy with temps in the mid 30's. I initially met Roy Birdwell, Superintendent of Hart Maintenance and Construction. Mr. Birdwell informed me of the following activities in progress. "We are in the process of welding pipe that will be run from the production fluid tanks containment to near the wells and evaporator unit. A compressor will be installed to increase pressure from (300) to (600) psi for all wells here. Frac will start soon on a nearby pad. The pressure is (600) psi at the wellheads on that pad. I am welding pieces of pipeline, which will be tied to the GPU's. A (6) inch suction line will go to the compressor. I have been working here over a week now and the evaporator has not run. I did not see any trucks haul water out of the frac tanks. The unit may be hauled out soon."
I met with Jordan Brand of Carrizo, Meter Technician, midway through the inspection. Mr. Brand stated the following. "The Evaporator has not b |
2744157 | Primary Facility | 2018-06-21 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 3' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2767917 | Primary Facility | 2018-08-27 | Routine/Complete Inspection | No Violations Noted | I inspected the Shaskas well site following a report by BKV detailing a slip on the cut slope, noticed during an after-rain inspection. The cut slope had previously experienced a slide however that repaired area was solid and stable. The new slip area occurred during the torrential rainfall which swept the region. The slip was not large and was scheduled to be repaired as soon as possible. No waters were impacted and the edge of the pad was not touched.
The rest of the cut and fill slopes were well vegetated and there was no evidence of erosional issues noted. The access road was solid and stable as was the pad surface. The wells were properly labeled. There were no violations noted. |
2839511 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water and ice 3' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2363024 | 720669 | 04/07/2015 | 2015-04-07 | 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. | Environmental Health & Safety | NERO EC&B Act 2 ROL granted 1/29/16. |
2363024 | 720670 | 04/07/2015 | 2015-04-07 | 102.11(a)1 -- Person failed to design, implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation to protect, maintain, reclaim and restore water quality and | Environmental Health & Safety | NERO EC&B Act 2 ROL granted 1/29/16. |
2363024 | 720671 | 04/07/2015 | 2015-04-07 | 102.22(b)1 - | Environmental Health & Safety | NERO EC&B Act 2 ROL granted 1/29/16. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
720669 | 322282 | NOV - Notice of Violation | Administrative Close Out | 2015-12-21 | |||
720669 | 333279 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2015-12-21 | 2015-12-21 | $20,449.00 | $20,449.00 |
720670 | 322282 | NOV - Notice of Violation | Administrative Close Out | 2015-12-21 | |||
720670 | 333279 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2015-12-21 | 2015-12-21 | $20,449.00 | $20,449.00 |
720671 | 322282 | NOV - Notice of Violation | Administrative Close Out | 2015-12-21 | |||
720671 | 333279 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2015-12-21 | 2015-12-21 | $20,449.00 | $20,449.00 |
For data sources see[8]