Well Details

Well ID: 37-115-20490
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: BKV OPR LLC
Well Pad ID: 145317
Farm/Lease Name: SHASKAS SOUTH 2H
License Status:
Spud Date:
Permit Date: 2010-12-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.817742
Longitude: -75.935294

For data sources see[1][2][3]

Well History

Date Event
2010-12-20 New Permit Application
2011-06-17 Performed Spud Operation
2011-11-22 Drilling Completion
2012-08-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-04-08 2012-04-08 6,228 5,150,460

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00466000
Calcium chloride 10043-52-4 5.00 0.00078000
Water Operator Carrier Water 7732-18-5 100.00 86.95
Ferrotrol 300L Baker Hughes Iron Control Citric acid 77-92-9 60.00 0.00168000
Hydrochloric Acid 5.1-7.5 Baker Hughes Acidizing Water 7732-18-5 92.50 0.65
Hydrochloric acid 7647-01-0 7.50 0.05
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
Baker Hughes Surfactant Thiourea polymer 68527-49-1
Salt 0.00316106
Sand, White, 100 mesh Baker Hughes Proppant Quartz 14808-60-7 100.00 0.83
InFlo 250W Baker Hughes Surfactant Methanol 67-56-1 30.00 0.00022000
2-Butoxyethanol 111-76-2 5.00 0.00004000
Surfactants 80.00 0.00059000
CI-14 Baker Hughes Corrosion Inhibitor Methanol 67-56-1 100.00 0.00065000
Propargyl alcohol 107-19-7 5.00 0.00003000
Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00003000
Fatty acids, tall-oil 61790-12-3 10.00 0.00006000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00019000
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Sand, White, 40/70 Baker Hughes Proppant Quartz 14808-60-7 100.00 4.74
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
Sodium chloride 7647-14-5 0.00000466
Potassium chloride 7447-40-7 0.00000777
Formalin 50-00-0
Polyacrylate 0.00310993
Poly (acrylamide-co-acrylic acid) 0.01
Hydrochloric acid 7647-01-0
Ethoxylated Alcohol 0.00126442
Sorbitan Monooleate 0.00316106
Water 7732-18-5 0.05
Sand, White, 30/50 Baker Hughes Proppant Quartz 14808-60-7 100.00 6.55
Hydrochloric Acid 10.1-15 Baker Hughes Acidizing Hydrochloric acid 7647-01-0 15.00 0.01
Water 7732-18-5 85.00 0.06
Alpha 1427 Baker Hughes Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.00 0.00113000
Ethanol 64-17-5 5.00 0.00113000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00225000
Glutaraldehyde 111-30-8 30.00 0.00675000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 1,031,362.00 248 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 911,827.00 361 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 764,290.31 317 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 366,561.61 175 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 661,212.74 326 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 649,628.88 349 0.00 0 0.00 0
2018 BKV OPR LLC 429,300.51 354 0.00 0 0.00 0
2019 BKV OPR LLC 509,396.52 357 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CARRIZO (MARCELLUS) LLC Drill Cuttings 429.66 Tons LANDFILL THR029
2012 CARRIZO (MARCELLUS) LLC Produced Fluid 16,631.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 469.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 1,331.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 109.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 9,165.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 9,165.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 86.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 654.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 444.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Basic Sediment 90.91 Bbl LANDFILL THR029
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 99.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 650.19 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 117.02 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 89.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 265.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 214.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 170.28 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 55.91 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 63.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 182.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 70.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 202.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 136.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 1,923.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 260.70 Bbl REUSE (AT WELL PAD)
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 348.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 26.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 BKV OPR LLC Produced Fluid 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 692.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 104.43 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 147.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Produced Fluid 454.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1987222 Primary Facility 2011-07-06 Drilling/Alteration No Violations Noted Falcon rig 14. BOP needs to be moved 50' from rig/well. Have drilled Shaskas 1H to 3300'. Will drill this well to about 3500 - 4000'. Drilers log on site and up to date. Noted leaking fuel line near compressors. Had Operator fix leaking hose. Was on containment. No violations observed.
2018685 Primary Facility 2011-11-09 Drilling/Alteration Violation(s) Noted Nabors Rig M61 on site. Currently drilling on SOBM. Estimated KOP 5740'. Walked site with Company Man. On back of location is a manifold for oil-base mud tanks. The manifold is on containment. There is evidence of a leak. Containment covered with SOBM, and some mud spilled on pad beyond containment. Violation 78.54 General Requirements cited. Operator to clean up spilled mud and report to DEP when complete.
2073376 Primary Facility 2012-04-27 Routine/Complete Inspection No Violations Noted Specifics associated with this inspection can be referenced in the Shaskas South 5H inspection report. Permit number is 115-20652.
2101128 Primary Facility 2012-07-06 Routine/Partial Inspection No Violations Noted
2157260 Primary Facility 2013-04-16 Routine/Partial Inspection No Violations Noted
2363015 Primary Facility 2015-04-07 Routine/Complete Inspection No Violations Noted The Department, represented by Frank Hoehle and Scott Kuchta, was on site at the Shaskas well pad to conduct a routine complete inspection. The wells associated with this site are as follows:
2365499 Primary Facility 2015-04-29 Routine/Complete Inspection No Violations Noted
2375445 Primary Facility 2015-05-26 Incident- Response to Accident or Event No Violations Noted The Department arrived on-site at 13:00 in response to a release of an unknown volume of production fluid and the discovery of dead vegetation associated with the release. Carrizo has recently been visiting the site on a regular basis due to an erosion problem observed during an inspection conducted by the Department on 4/7/2015. The Department issued a Notice of Violation to Carrizo on 4/22/2015 due to failure of the cut slope. As the Department arrived, Carrizo was in the process of commencing repairs to the cut slope. Gary Byron, consultant of Carrizo, notified the Department via e-mail on 5/22/15 of Carrizo’s observance of an area of dead vegetation off the Southeast end of the pad. The dead vegetation pathway was back tracked to an area where (4) production fluid tanks were stored on secondary containment. Compromised liner integrity was discovered in the containment staging the production fluid tanks. Carrizo believes a small release of had occurred following storm events on 5/17/15 and 5/18/15. The release appears to exceed (42) gallons.
2422337 Primary Facility 2015-10-28 Routine/Complete Inspection Outstanding Violations - No Viols Req'd The Department, represented by Frank Hoehle, was on site at the Shaskas well pad to conduct a routine complete inspection. The wells associated with this site are as follows:
2464779 Primary Facility 2016-03-15 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:35 a.m., the cellar had water at the bottom with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was about 660psi on the production casing and about 620psi on the production line. I took a walk around the location and everything looked OK.

I left the site at 12:15 p.m

2548723 Primary Facility 2016-12-22 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:35a.m., the cellar had ice at the bottom, the (9x5) vent pipe was open and venting into the production tank. There was 517psi on the production casing and 347psi on the production line. I took a walk around the location, there were twenty 500bbl tanks that were labeled fresh and on containment, the containment appeared to be in good condition. There were no obvious concerns noticed.

I left the site at 11:15a.m.

2623809 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted The Shaskas South site was dry at the time of inspection. There was a crew dismantling the remains of the ion exchange storage area previously located on site. The pad surface was solid and stable, with no mud on the access road or ruts onsite. The cut and fill slopes were very well vegetated and stable and there were no erosional issues at the time of inspection. There was no bubbling observed in the well cellars during the inspection.

There were no violations observed.

2636995 Primary Facility 2017-09-18 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. I took a walk around the location and there were no obvious concerns noticed.

2661544 Primary Facility 2017-11-13 Routine/Complete Inspection No Violations Noted I inspected the Shaskas South well pad for a Routine Complete inspection on November 13, 2017. The access road was not muddy and the pad surface was solid with some puddling due to recent rains. The cut and fill slopes were stable, solid and well vegetated at the time of inspection and there were no apparent erosional issues. There were no violations noted.
2677488 Primary Facility 2017-12-07 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:53. The weather conditions were partly cloudy skies and breezy with temps in the mid 30's. I initially met Roy Birdwell, Superintendent of Hart Maintenance and Construction. Mr. Birdwell informed me of the following activities in progress. "We are in the process of welding pipe that will be run from the production fluid tanks containment to near the wells and evaporator unit. A compressor will be installed to increase pressure from (300) to (600) psi for all wells here. Frac will start soon on a nearby pad. The pressure is (600) psi at the wellheads on that pad. I am welding pieces of pipeline, which will be tied to the GPU's. A (6) inch suction line will go to the compressor. I have been working here over a week now and the evaporator has not run. I did not see any trucks haul water out of the frac tanks. The unit may be hauled out soon."

I met with Jordan Brand of Carrizo, Meter Technician, midway through the inspection. Mr. Brand stated the following. "The Evaporator has not b

2744159 Primary Facility 2018-06-21 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water .5' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2767919 Primary Facility 2018-08-27 Routine/Complete Inspection No Violations Noted I inspected the Shaskas well site following a report by BKV detailing a slip on the cut slope, noticed during an after-rain inspection. The cut slope had previously experienced a slide however that repaired area was solid and stable. The new slip area occurred during the torrential rainfall which swept the region. The slip was not large and was scheduled to be repaired as soon as possible. No waters were impacted and the edge of the pad was not touched.

The rest of the cut and fill slopes were well vegetated and there was no evidence of erosional issues noted.

The access road was solid and stable as was the pad surface.

The wells were properly labeled.

There were no violations noted.

2839513 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 4.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2018685 624541 11/09/2011 2011-11-09 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety Sassi inspected- No viols on 4/27/12

For data sources see[8]