If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20516 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.862706,"lon":-75.964403,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Forest Lake Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148592 | |
Farm/Lease Name: J HAWLEY 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.862706 | |
Longitude: -75.964403 |
Date | Event |
---|---|
2011-03-02 | New Permit Application |
2011-09-09 | Performed Spud Operation |
2011-10-03 | Drilling Completion |
2011-11-22 | Perforation |
2011-11-22 | Performed Stimulation |
2012-06-22 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-12-07 | 2011-12-07 | 6,399 | 3,808,896 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFR-3B | Superior Well Services | Friction Reducer | Ethoxylated alcohol blend | 15.00 | 0.01 | ||
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00360000 | |||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.03 | |||||
Sand (Proppant) | Proppant | 10.58 | ||||||
Water | Carrier/Base Fluid | 100.00 | 89.21 | |||||
AI-2 | Superior Well Services | Corrosion Inhibitor | 2-Butoxyethanol | 111-76-2 | 30.00 | 0.00030000 | ||
Propargyl alcohol | 107-19-7 | 30.00 | 0.00030000 | |||||
Proprietary Component | 7.00 | 0.00007000 | ||||||
Isopropanol | 67-63-0 | 30.00 | 0.00030000 | |||||
Super TSC | Superior Well Services | Scale Control | Anionic polymer | 15.00 | 0.00396000 | |||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.01 | |||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15.00 | 0.00396000 | |||||
Anionic copolymer | 15.00 | 0.00396000 | ||||||
KR-153SL | Superior Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 50.00 | 0.01 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00565000 | |||||
Ethylene glycol | 107-21-1 | 1.00 | 0.00028000 | |||||
Diethylene glycol | 111-46-6 | 3.50 | 0.00099000 | |||||
15 HCl | Superior Well Services | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-11-22 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 614,070.18 | 343 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 584,107.49 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 398,552.83 | 346 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 297,066.29 | 358 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 382,942.23 | 350 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 335,114.71 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 256,837.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 243,995.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,035.74 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.46 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 67.64 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,324.09 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.42 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 2.76 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 21.71 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 3,713.08 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 13.53 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 54.02 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 16,782.12 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 8.17 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.85 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 95.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,132.79 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 890.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 485.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 416.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 239.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 153.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 165.09 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 77.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 62.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 5.51 Bbl | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 694.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 11.10 Bbl | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 267.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 203.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 485.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 1.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2005255 | Primary Facility | 2011-09-20 | Drilling/Alteration | No Violations Noted | Patterson 538. Drilling to 1526' on air. Should be running casing and cementing in the next 24 hrs. Secondary containment in place and in good condition. 13 3/8" set with 26 bbls cement returns reported. Current drillng depth 883'. |
2237204 | Primary Facility | 2014-01-17 | Drilling/Alteration | Pending | fire reported in production unit washed out npple on fw gas cntrl riser (picture available, damage done to adjacent unit, Operator in process of check for any contaminant release. NERO EC&B granted Act 2 ROL 5/15/14, closed. |
2335263 | Primary Facility | 2015-01-09 | Routine/Complete Inspection | No Violations Noted | The Department was on site at the Hawley J, Pad 1. to perform a Routine Complete Inspection. The wells on this site are the 2H, 3H, 4H, 5H, 6H and 7H. The Numbers, respectively, are 115-20516, 20515, 20560, 20518, 20561, and 20463. The site's last E&S inspection was on 1-7-2015. The site was adequately vegetated and stable. There were no violations. |
2377236 | Primary Facility | 2015-06-04 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the J. Hawley well pad (ESX10-115-0061) on June 4, 2015. The wells associated with this pad are as follows: |
2407818 | Primary Facility | 2015-09-17 | Routine/Complete Inspection | No Violations Noted | |
2505633 | Primary Facility | 2016-07-28 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 8:55a.m., the cellar was about half full of water with no bubbling noticed, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank, there was 566psi on the production casing. There was a crew doing remedial work on the lower side of the location, I took a walk around the location and everything looked OK.
I left the site at 9:50a.m. |
2549834 | Primary Facility | 2017-01-05 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls for the at the J. Hawley well pad (ESX10-115-0061) on June 4, 2015. The wells associated with this pad are as follows:
5H 115-20518 6H 115-20561 7H 115-20463 2H 115-20516 3H 115-20515 4H 115-20560 The site was in production, and not under any major construction. and the site was very well vegetated (>70%) and graded well. There were no erosion and sedimentation issues on site and the access road was holding up well.
If there are any questions please feel free to contact me at (570)346-5539 |
2600894 | Primary Facility | 2017-06-01 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 14:05p.m.
The cellar was full of water with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 523psi on the production casing and 476psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:45p.m. |
2648767 | Primary Facility | 2017-10-18 | Routine/Complete Inspection | No Violations Noted | I inspected the J. Hawley pad for Notice of Termination on October 3, 2017. The site was well constructed and had no apparent erosional problems. The vegetation was at or exceeding 70%.
There were no violations noted. I recommend APPROVAL of this NOT. |
2706400 | Primary Facility | 2018-03-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water and ice .5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2710096 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | I inspected the J. Hawley well pad on March 26, 2018. It was sunny and about 38 degrees out. The access road was solid and the pad surface was partly snow covered yet stable. The cut and fill slopes were not steep and were well vegetated. The wells associated with the site are as follows:
115-20515 115-20516 115-20518 115-20560 115-20561 115-20563 There were no apparent erosional issues. There were no violations noted. |
2808810 | Primary Facility | 2018-11-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of water and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]