Well Details

Well ID: 37-115-20527
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Franklin Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 148544
Farm/Lease Name: HOLLENBECK 2H
License Status:
Spud Date:
Permit Date: 2011-03-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.917217
Longitude: -75.832761

For data sources see[1][2][3]

Well History

Date Event
2011-03-02 New Permit Application
2011-03-11 Performed Spud Operation
2011-06-13 Drilling Completion
2011-12-09 Perforation
2011-12-09 Performed Stimulation
2012-04-30 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-12-15 2011-12-15 5,776 3,545,732

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBW-30 Breaker Halliburton Energy Services Breaker Carbohydrates 95.00 0.00159000
Hemicellulase enzyme 9012-54-8 15.00 0.00025000
BE-9M Halliburton Energy Services Biocide
Methanol 67-56-1 30.00 0.00317000
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00106000
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00367000
Water Carrier/Base Fluid Water 100.00 86.73
WG-36 Gelling Agent Halliburton Energy Services Gel Guar gum 9000-30-0 100.00 0.00169000
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00168000
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 13.07
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.12
Cla-Web Halliburton Energy Services Clay Control Proprietary 60.00 0.02

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-12-09 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 178,936.76 190 0.00 0 0.00 0
2013 XPR RESOURCES LLC 350,538.65 346 0.00 0 0.00 0
2014 XPR RESOURCES LLC 251,345.63 364 0.00 0 0.00 0
2015 SWN PROD CO LLC 176,234.87 361 0.00 0 0.00 0
2016 SWN PROD CO LLC 202,600.00 365 0.00 0 0.00 0
2017 SWN PROD CO LLC 55,769.00 167 0.00 0 0.00 0
2018 SWN PROD CO LLC 37,257.00 241 0.00 0 0.00 0
2019 SWN PROD CO LLC 5,495.00 335 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Drilling Fluid Waste 235.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 XPR RESOURCES LLC Drill Cuttings 853.00 Tons LANDFILL 31346244
2013 XPR RESOURCES LLC Produced Fluid 822.78 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013 XPR RESOURCES LLC Produced Fluid 1,660.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XPR RESOURCES LLC Produced Fluid 1,001.69 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XPR RESOURCES LLC Produced Fluid 1,312.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 XPR RESOURCES LLC Produced Fluid 612.91 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 XPR RESOURCES LLC Produced Fluid 816.13 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC010
2013 XPR RESOURCES LLC Produced Fluid 1,093.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2013 XPR RESOURCES LLC Produced Fluid 201.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2014 XPR RESOURCES LLC Produced Fluid 507.32 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XPR RESOURCES LLC Produced Fluid 2,919.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 XPR RESOURCES LLC Produced Fluid 252.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XPR RESOURCES LLC Produced Fluid 883.49 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SOUTHWESTERN ENERGY PROD CO Produced Fluid 3,154.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 618.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 SWN PROD CO LLC Produced Fluid 1,855.50 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Other Oil & Gas Wastes 13.75 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 662.25 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 137.50 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 40.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 50.36 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 415.75 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 716.50 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 1,128.25 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 194.40 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 57.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 793.25 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Other Oil & Gas Wastes 5.44 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 30.00 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Produced Fluid 451.50 Bbl SURFACE IMPOUNDMENT 826342

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1987230 Primary Facility 2011-07-07 Follow-up Inspection Pending Drilling complete. Inspected cellar. Fluid in cellar above 13 3/8" casing & conductor. Observed bubbling on NE side of 9 5/8" casing. Can not see source of bubbling due to level of flud in cellar. Further investigation required. Gas well completions report ultimately reviewed 3/2/12. Related follow-up insp 5/10/12 found no viols. Integrity evaluation of gas well done 8/28-31/12 during GMI investigation found no viols. GMI closed 4/24/13 via non-impact determ ltr.
1987345 Primary Facility 2011-07-07 Routine/Complete Inspection No Violations Noted
2005444 Primary Facility 2011-09-15 Routine/Complete Inspection No Violations Noted
2006738 Primary Facility 2011-09-22 Routine/Complete Inspection No Violations Noted
2007687 Primary Facility 2011-09-23 Follow-up Inspection No Violations Noted
2053499 Primary Facility 2012-03-20 Routine/Complete Inspection No Violations Noted Inspected condition and status of well. Well has been completed and fracced. No bubbling observed in the cellar at the time of the inspection. There is a Mercer service rig stacked on site and a small crew of workers on site. No violations observed.
2066951 Primary Facility 2012-05-10 Drilling/Alteration No Violations Noted At time of inspection Service Rig on site over 1H preparing wells for production. Inspected cellar. Constant bubbling observed between 9 5/8 and 13 3/8" casing strings. Audible gas leakingout of vent on 9 x 5" was heard while on site. Water level in cellar was just below 13 3/8" casing top. Pipeline crews working nearby.
2098532 Primary Facility 2012-08-27 Follow-up Inspection No Violations Noted On site at 9 am. Followup on 72 hour shut in on 9 5/8 x 13 3/8" annulus. Installed 30 lb gauge on annulus on Friday 8/24/12 at 10 am. At time of inspection, gauge was pinned at 30 +lbs. At 9:40, ERM and WPX arrived on site. At 10 am, Kevin Costellor (DEP) on site. Locks were removed from valves and 30 lb gauge removed and replace with 2000 lb gauge. This gauge indicated a pressure build of slightly more than 20 lbs. DEP requested Operator get a smaller gauge (100 lb) to obtain a more accurate reading. At 11 am - 100 lb gauge on site. Pressure build with this gauge showed 34 lbs. ERM collected isotube and isotopic bag samples from needle valve on vent line. Due to the fact that 30 lb gauge was too small for initial SIT, DEP requested Operator re-do shut in with 100 lb gauge. TomorrowDEP will return to site with flow meter to obtain flow reading, and commence second 72 hr shut in. DEP offsite 12 pm.
2098553 Primary Facility 2012-08-28 Follow-up Inspection No Violations Noted On site 9 am. On site to take flow readings and start 72 hour shut in of 9 5/8 x 13 3/8" annulus. WPX on site. Kevin Costello (DEP) and Ryan Klemish (DEP) on site at 10:30. Used a Magna Helic flow meter to gauge flow. At 10:37 started flow using 0-8" water gauge. At 10:42 stopped and recalibrated gauge to zero. At 10:43 resumed flwo for two minutes - not seeing any flow. At 10:45 changed to different flow meter. Installed 0 - 50" water meter and resumed flow test from 10:46 to 10:56. Reading was +/- .1 inch which = about 52.8 cu/ft over 24 hours. with 1/8" orifice. At 10:58 shut in annulus for 72 hour shut in with 100 lb gauge. Will return to site on Friday Sept. 31 to check gauge and end shut in test. DEP offsite at 11:30.
2099644 Primary Facility 2012-08-31 Follow-up Inspection No Violations Noted On site at 10:30. WPX on site 10:30. ERM on site 10:45. At time of arrival - crew on site blowing down wells (fluid) to holding tanks - Wells 1,3,4. Swabbed 1H on Wednesday (Parker Energy Services). Crew finished blowing down wells @ 10:45 am and mobilized offsite. At 11:00 am - opened Hollenbech 2H 9 5/8" x 13 3/8" annulus. Reading on 100 lb gauge = 34 lbs after 72 hrs. ERM collected two (2) isotube samples. WPX opened vent and are keeping open at this time. DEP offsite at 11:30 am.
2278320 Primary Facility 2014-06-12 Site Restoration Pending Well Site Restoration Report (8000-PM-OOGM0075) submitted with missing information.
2363005 Primary Facility 2015-04-20 Routine/Complete Inspection No Violations Noted
2433866 Primary Facility 2015-12-14 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:50 a.m., the cellar was about a quarter full of water with no bubbling observed, the vent pipe was open and set up with a Taylor plug, there was 410psi on the production casing and 377psi on the production line. I took a walk around the location and everything looked OK.
2508879 Primary Facility 2016-05-24 Routine/Complete Inspection No Violations Noted Inspection of the Hollenbeck well pad in conjunction with the Snake Creek Gathering Pipeline notice of termination inspection. There were no issues observed on the well pad at the time of the inspection.
2528985 Primary Facility 2016-10-18 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:35p.m., the cellar was about a quarter full of water with no bubbling noticed. The vent pipe was open and set up with a Taylor plug to check for pressure, the valve on the vent line going to the tank was closed. There was 297psi on the production casing and 252psi on the production line. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 14:15p.m.

2619620 Primary Facility 2017-07-25 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 14:55p.m.

The cellar was about half full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 403psi on the production casing and 349psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 15:35p.m.

2726969 Primary Facility 2018-04-27 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 2' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2825819 Primary Facility 2019-01-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was shut in at the GPU by a pneumatic valve. There was ice 2' below grade in the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2845378 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted I performed a site inspection of the Hollenbeck well pad on February 27, 2019. The weather was light snow and temperature in the mid 20s.

The well pad was compact and fenced in along the roadside. There was no activity on site during the inspection. The access driveway and well pad surface was frozen hard.

The slopes surrounding the site were all very well covered with last years vegetation in abundance. There were no noted areas of slope failure or slumping.

All wells were properly labeled.

There were no erosional issues noted.

There were no violations noted at the time of inspections.