If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20527 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.917217,"lon":-75.832761,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Franklin Township | |
Operator Name: SWN PROD CO LLC | |
Well Pad ID: 148544 | |
Farm/Lease Name: HOLLENBECK 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.917217 | |
Longitude: -75.832761 |
Date | Event |
---|---|
2011-03-02 | New Permit Application |
2011-03-11 | Performed Spud Operation |
2011-06-13 | Drilling Completion |
2011-12-09 | Perforation |
2011-12-09 | Performed Stimulation |
2012-04-30 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-12-15 | 2011-12-15 | 5,776 | 3,545,732 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | GBW-30 Breaker | Halliburton Energy Services | Breaker | Carbohydrates | 95.00 | 0.00159000 | ||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00025000 | |||||
BE-9M | Halliburton Energy Services | Biocide | ||||||
Methanol | 67-56-1 | 30.00 | 0.00317000 | |||||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00106000 | |||||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00367000 | ||
Water | Carrier/Base Fluid | Water | 100.00 | 86.73 | ||||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | Guar gum | 9000-30-0 | 100.00 | 0.00169000 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00168000 | ||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 13.07 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.12 | ||
Cla-Web | Halliburton Energy Services | Clay Control | Proprietary | 60.00 | 0.02 | |||
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-12-09 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 178,936.76 | 190 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 350,538.65 | 346 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 251,345.63 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | SWN PROD CO LLC | 176,234.87 | 361 | 0.00 | 0 | 0.00 | 0 |
2016 | SWN PROD CO LLC | 202,600.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | SWN PROD CO LLC | 55,769.00 | 167 | 0.00 | 0 | 0.00 | 0 |
2018 | SWN PROD CO LLC | 37,257.00 | 241 | 0.00 | 0 | 0.00 | 0 |
2019 | SWN PROD CO LLC | 5,495.00 | 335 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 235.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XPR RESOURCES LLC | Drill Cuttings | 853.00 Tons | LANDFILL | 31346244 |
2013 | XPR RESOURCES LLC | Produced Fluid | 822.78 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2013 | XPR RESOURCES LLC | Produced Fluid | 1,660.11 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XPR RESOURCES LLC | Produced Fluid | 1,001.69 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XPR RESOURCES LLC | Produced Fluid | 1,312.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XPR RESOURCES LLC | Produced Fluid | 612.91 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XPR RESOURCES LLC | Produced Fluid | 816.13 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC010 |
2013 | XPR RESOURCES LLC | Produced Fluid | 1,093.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2013 | XPR RESOURCES LLC | Produced Fluid | 201.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2014 | XPR RESOURCES LLC | Produced Fluid | 507.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XPR RESOURCES LLC | Produced Fluid | 2,919.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | XPR RESOURCES LLC | Produced Fluid | 252.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XPR RESOURCES LLC | Produced Fluid | 883.49 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SOUTHWESTERN ENERGY PROD CO | Produced Fluid | 3,154.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWN PROD CO LLC | Produced Fluid | 618.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | SWN PROD CO LLC | Produced Fluid | 1,855.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 13.75 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Produced Fluid | 662.25 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Produced Fluid | 137.50 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 40.00 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 50.36 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018 | SWN PROD CO LLC | Produced Fluid | 415.75 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018 | SWN PROD CO LLC | Produced Fluid | 716.50 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Produced Fluid | 1,128.25 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 194.40 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 57.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
2019 | SWN PROD CO LLC | Produced Fluid | 793.25 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 5.44 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 30.00 Bbl | REUSE (AT WELL PAD) | |
2019 | SWN PROD CO LLC | Produced Fluid | 451.50 Bbl | SURFACE IMPOUNDMENT | 826342 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1987230 | Primary Facility | 2011-07-07 | Follow-up Inspection | Pending | Drilling complete. Inspected cellar. Fluid in cellar above 13 3/8" casing & conductor. Observed bubbling on NE side of 9 5/8" casing. Can not see source of bubbling due to level of flud in cellar. Further investigation required. Gas well completions report ultimately reviewed 3/2/12. Related follow-up insp 5/10/12 found no viols. Integrity evaluation of gas well done 8/28-31/12 during GMI investigation found no viols. GMI closed 4/24/13 via non-impact determ ltr. |
1987345 | Primary Facility | 2011-07-07 | Routine/Complete Inspection | No Violations Noted | |
2005444 | Primary Facility | 2011-09-15 | Routine/Complete Inspection | No Violations Noted | |
2006738 | Primary Facility | 2011-09-22 | Routine/Complete Inspection | No Violations Noted | |
2007687 | Primary Facility | 2011-09-23 | Follow-up Inspection | No Violations Noted | |
2053499 | Primary Facility | 2012-03-20 | Routine/Complete Inspection | No Violations Noted | Inspected condition and status of well. Well has been completed and fracced. No bubbling observed in the cellar at the time of the inspection. There is a Mercer service rig stacked on site and a small crew of workers on site. No violations observed. |
2066951 | Primary Facility | 2012-05-10 | Drilling/Alteration | No Violations Noted | At time of inspection Service Rig on site over 1H preparing wells for production. Inspected cellar. Constant bubbling observed between 9 5/8 and 13 3/8" casing strings. Audible gas leakingout of vent on 9 x 5" was heard while on site. Water level in cellar was just below 13 3/8" casing top. Pipeline crews working nearby. |
2098532 | Primary Facility | 2012-08-27 | Follow-up Inspection | No Violations Noted | On site at 9 am. Followup on 72 hour shut in on 9 5/8 x 13 3/8" annulus. Installed 30 lb gauge on annulus on Friday 8/24/12 at 10 am. At time of inspection, gauge was pinned at 30 +lbs. At 9:40, ERM and WPX arrived on site. At 10 am, Kevin Costellor (DEP) on site. Locks were removed from valves and 30 lb gauge removed and replace with 2000 lb gauge. This gauge indicated a pressure build of slightly more than 20 lbs. DEP requested Operator get a smaller gauge (100 lb) to obtain a more accurate reading. At 11 am - 100 lb gauge on site. Pressure build with this gauge showed 34 lbs. ERM collected isotube and isotopic bag samples from needle valve on vent line. Due to the fact that 30 lb gauge was too small for initial SIT, DEP requested Operator re-do shut in with 100 lb gauge. TomorrowDEP will return to site with flow meter to obtain flow reading, and commence second 72 hr shut in. DEP offsite 12 pm. |
2098553 | Primary Facility | 2012-08-28 | Follow-up Inspection | No Violations Noted | On site 9 am. On site to take flow readings and start 72 hour shut in of 9 5/8 x 13 3/8" annulus. WPX on site. Kevin Costello (DEP) and Ryan Klemish (DEP) on site at 10:30. Used a Magna Helic flow meter to gauge flow. At 10:37 started flow using 0-8" water gauge. At 10:42 stopped and recalibrated gauge to zero. At 10:43 resumed flwo for two minutes - not seeing any flow. At 10:45 changed to different flow meter. Installed 0 - 50" water meter and resumed flow test from 10:46 to 10:56. Reading was +/- .1 inch which = about 52.8 cu/ft over 24 hours. with 1/8" orifice. At 10:58 shut in annulus for 72 hour shut in with 100 lb gauge. Will return to site on Friday Sept. 31 to check gauge and end shut in test. DEP offsite at 11:30. |
2099644 | Primary Facility | 2012-08-31 | Follow-up Inspection | No Violations Noted | On site at 10:30. WPX on site 10:30. ERM on site 10:45. At time of arrival - crew on site blowing down wells (fluid) to holding tanks - Wells 1,3,4. Swabbed 1H on Wednesday (Parker Energy Services). Crew finished blowing down wells @ 10:45 am and mobilized offsite. At 11:00 am - opened Hollenbech 2H 9 5/8" x 13 3/8" annulus. Reading on 100 lb gauge = 34 lbs after 72 hrs. ERM collected two (2) isotube samples. WPX opened vent and are keeping open at this time. DEP offsite at 11:30 am. |
2278320 | Primary Facility | 2014-06-12 | Site Restoration | Pending | Well Site Restoration Report (8000-PM-OOGM0075) submitted with missing information. |
2363005 | Primary Facility | 2015-04-20 | Routine/Complete Inspection | No Violations Noted | |
2433866 | Primary Facility | 2015-12-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:50 a.m., the cellar was about a quarter full of water with no bubbling observed, the vent pipe was open and set up with a Taylor plug, there was 410psi on the production casing and 377psi on the production line. I took a walk around the location and everything looked OK. |
2508879 | Primary Facility | 2016-05-24 | Routine/Complete Inspection | No Violations Noted | Inspection of the Hollenbeck well pad in conjunction with the Snake Creek Gathering Pipeline notice of termination inspection. There were no issues observed on the well pad at the time of the inspection. |
2528985 | Primary Facility | 2016-10-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:35p.m., the cellar was about a quarter full of water with no bubbling noticed. The vent pipe was open and set up with a Taylor plug to check for pressure, the valve on the vent line going to the tank was closed. There was 297psi on the production casing and 252psi on the production line. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 14:15p.m. |
2619620 | Primary Facility | 2017-07-25 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 14:55p.m.
The cellar was about half full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 403psi on the production casing and 349psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 15:35p.m. |
2726969 | Primary Facility | 2018-04-27 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 2' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2825819 | Primary Facility | 2019-01-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was shut in at the GPU by a pneumatic valve. There was ice 2' below grade in the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2845378 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | I performed a site inspection of the Hollenbeck well pad on February 27, 2019. The weather was light snow and temperature in the mid 20s.
The well pad was compact and fenced in along the roadside. There was no activity on site during the inspection. The access driveway and well pad surface was frozen hard. The slopes surrounding the site were all very well covered with last years vegetation in abundance. There were no noted areas of slope failure or slumping. All wells were properly labeled. There were no erosional issues noted. There were no violations noted at the time of inspections. |
For data sources see[9]