If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20540 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.896008,"lon":-75.989417,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Forest Lake Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145333 | |
Farm/Lease Name: BAKER NORTH 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-04-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.896008 | |
Longitude: -75.989417 |
Date | Event |
---|---|
2011-04-29 | New Permit Application |
2011-05-24 | Performed Spud Operation |
2011-08-26 | Drilling Completion |
2012-08-17 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CARRIZO (MARCELLUS) LLC | 1,173,285.00 | 285 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 401,284.00 | 227 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 6,505.09 | 6 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 1,783.20 | 2 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 360,435.97 | 204 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 254,643.59 | 281 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 215,466.44 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 136,623.10 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 540.00 Tons | LANDFILL | NY STATE #32S11 |
2011 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 426.12 Tons | LANDFILL | THR029 |
2012 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 12,952.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 215.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2013 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 171.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 21.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 930.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 86.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 930.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 83.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 37.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 15.18 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 364.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 172.48 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 0.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 129.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 41.81 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 352.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 53.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 162.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 15.53 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | BKV OPR LLC | Produced Fluid | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | BKV OPR LLC | Produced Fluid | 45.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 248.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 15.00 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Produced Fluid | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | BKV OPR LLC | Produced Fluid | 271.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2000362 | Primary Facility | 2011-08-19 | Drilling/Alteration | No Violations Noted | Nabors Rig MO5. Currently drilling to KOP (5560'). Walked site with Co. Man. Discussed keeping cuttings on containment and in tubs when mixing solids on back of pad. Observed a small amount of cuttings off containment. Operator cleaned up immediately. Inspected cellars...no bubbling obsderved. 20" set at 35'. 13 3/8" set at 708', 9 5/8" set at 1802'. |
2007337 | Primary Facility | 2011-09-29 | Routine/Complete Inspection | No Violations Noted | |
2077188 | Primary Facility | 2012-06-08 | Routine/Complete Inspection | No Violations Noted | Well is online. Gauge on productions shows 1500 lbs. Well tag is on well. There is miscellaneous trash and debris in the cellar. Operator is remove standing liquid and trash and debris from the cellar. please notify DEP upon completion. |
2354596 | Primary Facility | 2015-03-24 | Routine/Complete Inspection | No Violations Noted | |
2424240 | Primary Facility | 2015-11-12 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:45 p.m., the cellar was empty, the (9x5) vent pipe was open and venting to a tank, there was 1344psi on the production casing and 0psi on the production line. I took a walk around the location and everything looked OK. |
2451848 | Primary Facility | 2016-01-21 | Routine/Complete Inspection | No Violations Noted | The Department was on site to inspect the Baker North well pad (ESX10-115-0080). The wells associated with the pad are as follows:
115-20536 115-20538 115-20539 115-20540 There was active forestry going on near the site, however the site was stable and well vegetated with no apparent erosional issues. There were no violations. If there are any issues please feel free to contact me. |
2509591 | Primary Facility | 2016-07-28 | Routine/Complete Inspection | No Violations Noted | The Department was on site to inspect the Baker North well pad (ESX10-115-0080). The wells associated with the pad are as follows:
115-20536 115-20538 115-20539 115-20540 The site was stable and well vegetated with no apparent erosional issues. There were no violations. If there are any issues please feel free to contact me. |
2517579 | Primary Facility | 2016-09-08 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:40p.m., the cellar had water at the bottom with no bubbling was noticed; the (9x5) vent pipe was open and venting into a tank. There was 551psi on the production casing and 458psi on the production line. I took a walk around the location and noticed what appeared to grease in a water puddle. I contacted Jesse Bonnice of Carrizo to suggest it be cleaned up.
I left the site at 13:15p.m. |
2528718 | Primary Facility | 2016-10-03 | Site Restoration | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Baker North well pad (ESX10-115-0080). The wells associated with the pad are as follows:
115-20536 115-20538 115-20539 115-20540 The site was stable and the vegetation was primarily perennial grasses. The vegetation met or exceeded the 70 percent vegetative standard. There were no stability problems to report, and the site was well constructed. There were a few third party trails intercepting the well site, however there were no erosional issues associated with these trails. I recommend APPROVAL of this Notice of Termination for the Baker North Well Pad. There were no violations. If there are any issues please feel free to contact me. |
2606533 | Primary Facility | 2017-06-21 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 9:55a.m.
The cellar was about three quarters full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 521psi on the production casing and 453psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 10:35a.m. |
2622526 | Primary Facility | 2017-08-04 | Routine/Complete Inspection | No Violations Noted | I inspected the Baker North Well site on July 20, 2017. The site was stable at the time of inspection. The access road leading in had no washing or erosional issues and the pad surface was solid with no excessive ponding or mud issues. The vegetation was well established and healthy looking.
There were no violations noted. |
2715670 | Primary Facility | 2018-04-04 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was cement between the (20x13) and (13x9) annuli and there was no gas detected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2817674 | Primary Facility | 2018-12-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 12/3/18. The production tanks for this site are located on the Baker pad. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[7]