| Well ID: 37-115-20552 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.680356,"lon":-75.667694,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Lenox Township | |
| Operator Name: SWN PROD CO LLC | |
| Well Pad ID: 149149 | |
| Farm/Lease Name: RANSOM STAS GAS UNIT 2H | |
| License Status: PLUGGED & ABANDONED | |
| Spud Date: | |
| Permit Date: 2011-04-15 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.680356 | |
| Longitude: -75.667694 |
| Date | Event |
|---|---|
| 2011-04-15 | New Permit Application |
| 2012-03-09 | Performed Spud Operation |
| 2012-03-10 | Drilling Completion |
| 2014-03-06 | New Permit Application |
| 2014-12-05 | Drilling Completion |
| 2015-02-10 | NEWLY DRILLED |
| 2016-05-25 | FULLY PLUGGED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2011 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2013 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2012 | SOUTHWESTERN ENERGY PROD CO | Drilling Fluid Waste | 128.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2015 | SWN PROD CO LLC | Produced Fluid | 118.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2143940 | Primary Facility | 2013-02-27 | Routine/Complete Inspection | No Violations Noted | |
| 2332450 | Primary Facility | 2014-12-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
| 2541982 | Primary Facility | 2016-12-06 | Site Restoration | No Violations Noted | This administrative inspection has been created to document the approval of SWN’s NOT application which was received by the Department on 9/9/2016. This permit had technically expired on 1/18/2016. A new ESCGP-2 permit was issued for this site on 11/17/2016, ESG29-115-16-0038. With this new permit covering the entire original site, I recommend that the NOT submitted for the original permit, ESX10-115-0079 be approved. Of note is the fact that 2 wells were drilled and subsequently P&A. The 2H was conductor only and had the Certificate of Plugging approved on 12/29/14. The 6H had been completely drilled and had the Certificate of Plugging approved on 10/3/16. SWN has sent out a seven day notice of intent to begin reclamation of the site under the new ESCGP-2. The pre-construction meeting is set for December 14, 2016 at 10:30 AM. Andy Breese will be the Construction Foreman for this project. |
For data sources see[7]