If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-115-20568 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.918453,"lon":-75.80245,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Franklin Township | |
| Operator Name: SWN PROD CO LLC | |
| Well Pad ID: 150025 | |
| Farm/Lease Name: HERMAN 1H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2011-05-16 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.918453 | |
| Longitude: -75.802450 |
| Date | Event |
|---|---|
| 2011-05-16 | New Permit Application |
| 2011-06-27 | Performed Spud Operation |
| 2011-11-10 | Drilling Completion |
| 2012-02-13 | Perforation |
| 2012-02-21 | Performed Stimulation |
| 2016-05-12 | DEVIATED |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2012-02-21 | 2012-02-21 | 6,193 | 3,364,359 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | GBW-30 Breaker | Halliburton Energy Services | Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00023000 | |
| Carbohydrates | 95.00 | 0.00147000 | ||||||
| Cla-Web | Halliburton Energy Services | Clay Control | ||||||
| Proprietary | 60.00 | 0.02 | ||||||
| Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.13 | ||
| Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 14.56 | ||
| Water | Carrier/Base Fluid | Water | 100.00 | 85.24 | ||||
| FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
| LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00411000 | ||
| WG-36 Gelling Agent | Halliburton Energy Services | Gel | Guar gum | 9000-30-0 | 100.00 | 0.00174000 | ||
| BE-9M | Halliburton Energy Services | Biocide | ||||||
| Methanol | 67-56-1 | 30.00 | 0.00287000 | |||||
| Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00096000 | |||||
| SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00155000 |
For data sources see[5]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2012-02-21 | 0 | 0 | 0 |
For data sources see[6]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2011 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XPR RESOURCES LLC | 194,824.12 | 199 | 0.00 | 0 | 0.00 | 0 |
| 2013 | XPR RESOURCES LLC | 431,772.75 | 347 | 0.00 | 0 | 0.00 | 0 |
| 2014 | XPR RESOURCES LLC | 257,058.64 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | SWN PROD CO LLC | 116,128.75 | 363 | 0.00 | 0 | 0.00 | 0 |
| 2016 | SWN PROD CO LLC | 157,950.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | SWN PROD CO LLC | 47,627.00 | 177 | 0.00 | 0 | 0.00 | 0 |
| 2018 | SWN PROD CO LLC | 20,538.00 | 229 | 0.00 | 0 | 0.00 | 0 |
| 2019 | SWN PROD CO LLC | 41,081.00 | 331 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | XPR RESOURCES LLC | Drill Cuttings | 1,735.12 Tons | LANDFILL | 8-0728-0004/013 |
| 2012 | XPR RESOURCES LLC | Produced Fluid | 1,878.75 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
| 2012 | XPR RESOURCES LLC | Produced Fluid | 278.89 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
| 2012 | XPR RESOURCES LLC | Fracing Fluid Waste | 2,617.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
| 2012 | XPR RESOURCES LLC | Fracing Fluid Waste | 5,440.91 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 399.74 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 318.56 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 886.06 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 405.19 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 710.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 207.19 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC010 |
| 2013 | XPR RESOURCES LLC | Produced Fluid | 104.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
| 2014 | XPR RESOURCES LLC | Produced Fluid | 114.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
| 2014 | XPR RESOURCES LLC | Produced Fluid | 1,494.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
| 2014 | XPR RESOURCES LLC | Produced Fluid | 74.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
| 2014 | XPR RESOURCES LLC | Produced Fluid | 810.99 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
| 2015 | SOUTHWESTERN ENERGY PROD CO | Produced Fluid | 1,618.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | SWN PROD CO LLC | Produced Fluid | 422.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
| 2016 | SWN PROD CO LLC | Other Oil & Gas Wastes | 36.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | SWN PROD CO LLC | Produced Fluid | 722.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2017 | SWN PROD CO LLC | Synthetic Liner Materials | 21.33 Tons | LANDFILL | 101247 |
| 2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 1,354.99 Bbl | REUSE (AT WELL PAD) | |
| 2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 368.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2017 | SWN PROD CO LLC | Waste Water Treatment Sludge | 265.76 Tons | REUSE (AT WELL PAD) | |
| 2017 | SWN PROD CO LLC | Produced Fluid | 1,894.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2017 | SWN PROD CO LLC | Produced Fluid | 110.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 16.67 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Produced Fluid | 189.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 513.34 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Produced Fluid | 763.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 187.48 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 301.33 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 1,387.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 989.99 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 76.67 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2019 | SWN PROD CO LLC | Synthetic Liner Materials | 6.00 Tons | LANDFILL | 100933 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 36.67 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2018724 | Primary Facility | 2011-11-08 | Drilling/Alteration | No Violations Noted | Patterson 332. Going to be cementing long string later this afternoon. TD = 10409'. Running casing in hole. Haliburton on site. Requested operator to use different catch pans under shakers. observed excess mud/cuttings on containment around pans. |
| 2084681 | Primary Facility | 2012-07-19 | Incident- Response to Accident or Event | Violation(s) Noted | Arrived at the site at 12:35 AM in response to a flowback fluid spill that occurred at the site on 7-18-12 at 10PM. Scott Aharonian, EHS advisor of WPX reported the spill to the Department at 9:45 on 7-19-12. The estimated volume of the spill was determined to be (20) gallons. Mr. Aharonian informed me that the spill occurred during a hose disconnection as a vacuum truck was in preparation to transport the flowback fluid out of a frac tank to a permitted disposal facility. The flowback fluid spill impacted the surface of the ground on the Well Pad. The frac tank in relevance to the spill was one of the last tanks at the site being emptied. Stony Mt. Acres was on-site in the process of excavating the impacted area and loading the material into a Diaz operated dump truck. The material will be transported via rail to Tunnel Hill Reclamation in Ohio. The dimensions of the excavation area of the impacted material was determined to be 20’X25”X6’. |
| 2093169 | Primary Facility | 2012-08-17 | Routine/Complete Inspection | No Violations Noted | Operator has requested to backfill the cellar around base of well. Proper well tag is in place on well head. The cellar appears clean. At time of inspection there appeared to be no issues of concern. No violations observed. |
| 2157390 | Primary Facility | 2013-04-09 | Incident- Response to Accident or Event | No Violations Noted | |
| 2362998 | Primary Facility | 2015-04-20 | Routine/Complete Inspection | No Violations Noted | |
| 2431031 | Primary Facility | 2015-12-08 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:45 p.m., the cellar was full of gravel, the vent pipe was open and set up with a Taylor plug and a 0psi to 5000psi pressure gauge that had about 25psi on it, there was no gas detected at the perimeter of the cellar, there was 429psi on the production casing and 389psi on the production line. I took a walk around the location and everything looked OK. |
| 2508866 | Primary Facility | 2016-05-24 | Routine/Complete Inspection | No Violations Noted | Inspection of the Herman Unit 17 well pad in conjunction with the Snake Creek Gathering Pipeline notice of termination inspection. There were no issues observed on the well pad at the time of the inspection. |
| 2520247 | Primary Facility | 2016-09-01 | Routine/Partial Inspection | No Violations Noted | |
| 2526676 | Primary Facility | 2016-10-07 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:00p.m., the cellar was full of gravel and there was no gas detected at the perimeter of the cellar. The vent pipe was open and set up with a Taylor plug to check for pressure and a 5000psi pressure gauge with about 25psi on it. There was 188psi on the production casing and 169psi on the production line. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 13:35p.m. |
| 2570368 | Primary Facility | 2017-03-09 | Routine/Complete Inspection | No Violations Noted | I traveled to the Herman Well Site to conduct a Routine Complete Inspection. The inspection log indicated that Mike Demming conducted a weekly/post weather inspection on 3/8/17. Mr. Deming and Lucas Schwarztrauber(Measurement Technician -SWN) were present during the inspection. |
| 2618602 | Primary Facility | 2017-07-24 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:00a.m.
The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge and a 5000psi pressure gauge with 0psi on it. There was 306psi on the production casing and 266psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:45a.m. |
| 2637396 | Primary Facility | 2017-08-14 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection. Currently the 1H, 3G, and 5H wells are present. |
| 2724103 | Primary Facility | 2018-04-27 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
| 2741122 | Primary Facility | 2018-06-13 | Routine/Complete Inspection | No Violations Noted | I Inspected the Herman pad. The wells associated with this pad are the 115-20568, 115-20570, 115-20572, 115-22097, 115-22098. The wells were labeled.
The pad surface and access road were both solid and stable. The cut and fill slopes were well vegetated and had no erosional issues noted. There were no violations noted. |
| 2825709 | Primary Facility | 2019-01-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of gravel and I was unable to check for gas at the perimeter of the cellar because the gravel was frozen. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
| 2845270 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | I performed a site inspection of the Herman well pad on February 27, 2019. The weather was snowing lightly and in the mid 20s. I was previously at a water supply complaint in the vicinity. There was a water hauler truck broken down on the small access road. No leaks were observed.
The access road and pad surface were frozen hard, as were all slopes. The vegetation from the previous growing season was abundant on all areas. Woody vegetation was establishing itself in some areas as well. There were stone piles and a skid steer loader onsite but not active. There were no areas of leaks or drips observed. The wells were all well labeled. There were no erosional issues noted. There were no violations noted |
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 2084681 | 644426 | 07/19/2012 | 2012-07-19 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
| 2084681 | 644427 | 07/19/2012 | 2012-07-19 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative | Failure to immediately notify DEP of a pollutional incident. |
| 2084681 | 644428 | 07/19/2012 | 2012-07-19 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | |
| 2084681 | 644429 | 07/19/2012 | 2012-07-19 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[9]