If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20621 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.710114,"lon":-75.654231,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lenox Township | |
Operator Name: SWN PROD CO LLC | |
Well Pad ID: 145602 | |
Farm/Lease Name: NORTH PRICE GAS UNIT 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-08-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.710114 | |
Longitude: -75.654231 |
Date | Event |
---|---|
2011-08-18 | New Permit Application |
2011-08-27 | Performed Spud Operation |
2011-10-07 | Drilling Completion |
2012-06-28 | Perforation |
2012-06-28 | Performed Stimulation |
2013-05-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-06-25 | 2012-06-25 | 7,265 | 5,607,294 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AI-250 | Clearwater International | Acid Inhibitor | Isopropanol | 67-63-0 | 40.00 | 0.00075000 | |
Ethoxylated Nonylphenol | 13.00 | 0.00024000 | ||||||
Propargyl alcohol | 107-19-7 | 40.00 | 0.00075000 | |||||
2-Butoxyethanol | 111-76-2 | 40.00 | 0.00075000 | |||||
Southwestern Energy | Sand | Quartz | 14808-60-7 | 100.00 | 7.91 | |||
H2O + Disolved Salts | 100.00 | 91.20 | ||||||
Southwestern Energy | Water/Produced Water | |||||||
FRA-405 | Clearwater International | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 27.50 | 0.02 | ||
Sodium chloride | 7647-14-5 | 7.50 | 0.00643000 | |||||
Ethoxylated C12-16 alcohols | 68551-12-2 | 5.00 | 0.00429000 | |||||
Ammonium chloride | 12125-02-9 | 5.00 | 0.00429000 | |||||
Biocide EC 6116A | Nalco | Acid | Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00119000 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00712000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.11 | |||||
SI-112 | Clearwater International | Scale Inhibitor | Ethylene glycol | 107-21-1 | 40.00 | 0.00426000 | ||
Biocide EC 6116A | Nalco | Biocide |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-06-28 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SOUTHWESTERN ENERGY PROD CO | 757,134.00 | 180 | 0.00 | 0 | 0.00 | 0 |
2013 | SOUTHWESTERN ENERGY PROD CO | 911,292.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2014 | SOUTHWESTERN ENERGY PROD CO | 758,329.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2015 | SWN PROD CO LLC | 631,877.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | SWN PROD CO LLC | 574,845.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SWN PROD CO LLC | 456,843.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SWN PROD CO LLC | 365,329.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SWN PROD CO LLC | 324,039.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SOUTHWESTERN ENERGY PROD CO | Fracturing Fluid Waste | 17.82 Tons | LANDFILL | 101247 |
2013 | SOUTHWESTERN ENERGY PROD CO | Fracing Fluid Waste | 36.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SOUTHWESTERN ENERGY PROD CO | Produced Fluid | 512.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SOUTHWESTERN ENERGY PROD CO | Produced Fluid | 21.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWN PROD CO LLC | Produced Fluid | 476.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWN PROD CO LLC | Produced Fluid | 299.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 8.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Produced Fluid | 1,163.99 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Produced Fluid | 574.68 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Produced Fluid | 146.67 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018 | SWN PROD CO LLC | Produced Fluid | 150.01 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 20.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 36.67 Bbl | REUSE (AT WELL PAD) | |
2019 | SWN PROD CO LLC | Produced Fluid | 186.68 Bbl | SURFACE IMPOUNDMENT | 826342 |
2019 | SWN PROD CO LLC | Produced Fluid | 445.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 42.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2005190 | Primary Facility | 2011-09-15 | Drilling/Alteration | No Violations Noted | DeSoto Rig 10. Rigging up to drill out 9 5/8". 20 " set at 55'. 13 3/8" set at 627', 9 5/8" set at 1667. Have secondary containment in place and will berm once all equipment is staged. Spudding in sometime tomorrow. Existing casing strings set previously by small Falcon Rig. |
2009299 | Primary Facility | 2011-10-05 | Drilling/Alteration | No Violations Noted | Rig Desoto 10. DEP on site at 10:30. Walked site with Co. Man. Secondary containment in place. Checked cellar - no gas leaks observed. Drilling on SOBM. Discussed with Company Man to keep drillers log up to date and keep pollution pans empty. Cement reports show good returns on both surface and intermediate strings. Current drilling depth 11370'. |
2661362 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | Arrived on location to perform routine inspection of wells and validate status to update Departments system. 3 wells on location (115-20673 - N Price 5H; 115-20671 - S Price 7H and 115-20621 N Price 6H). The cellars of the 5 & 7H were filled with gravel. The cellar of the 6H was filled with water with visible bubbling. The prod casing of the wells are as follows: 5H - 278.19psi; 7H - 285.78psi; 6H - 306.58psi. Equipment on location include: 3 treaters, 3 separators and 2 prod-tanks. No obvious concerns at time of inspection. Also validated status of permit # 115-20912 (South price 9H). Permit was issued however never materialized. Contacted Afton Sterling to submit OG23, however she stated it was already submitted 5//18/15. I validated that Dept recd 5/19/15 and will forward to file. |
For data sources see[9]