If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20704 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.845256,"lon":-75.909928,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Bridgewater Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147898 | |
Farm/Lease Name: C FRYSTAK 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.845256 | |
Longitude: -75.909928 |
Date | Event |
---|---|
2011-10-19 | New Permit Application |
2011-11-01 | Performed Spud Operation |
2012-01-08 | Drilling Completion |
2012-02-01 | Perforation |
2012-02-01 | Performed Stimulation |
2012-08-17 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-03-03 | 2012-03-03 | 6,447 | 4,595,262 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KR-153SL | Superior Well Services | Biocide | Diethylene glycol | 111-46-6 | 3.50 | 0.00093000 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00532000 | |||||
Ethylene glycol | 107-21-1 | 1.00 | 0.00027000 | |||||
Polyethylene glycol | 25322-68-3 | 50.00 | 0.01 | |||||
15 HCl | Superior Well Services | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
Water | Carrier/Base Fluid | 100.00 | 88.33 | |||||
WFR-3B | Superior Well Services | Friction Reducer | Ethoxylated alcohol blend | 15.00 | 0.00992000 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.03 | |||||
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00331000 | |||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.00992000 | |||||
Sand (Proppant) | Proppant | 11.47 | ||||||
AI-2 | Superior Well Services | Corrosion Inhibitor | 2-Butoxyethanol | 111-76-2 | 30.00 | 0.00029000 | ||
Isopropanol | 67-63-0 | 30.00 | 0.00029000 | |||||
Propargyl alcohol | 107-19-7 | 30.00 | 0.00029000 | |||||
Proprietary Component | 7.00 | 0.00007000 | ||||||
Super TSC | Superior Well Services | Scale Control | Anionic copolymer | 15.00 | 0.00384000 | |||
Anionic polymer | 15.00 | 0.00384000 | ||||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15.00 | 0.00384000 | |||||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.01 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-02-01 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 417,154.31 | 94 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 985,641.06 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 523,460.28 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 364,059.16 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 534,130.46 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 405,724.16 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 472,874.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 369,968.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 815.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.83 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.66 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 560.48 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.42 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 20.79 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1.30 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 2,832.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 20.29 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 6.76 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 436.47 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 7,596.61 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 47.38 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 378.96 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 295.24 Bbl | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 3,268.55 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,532.48 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 95.56 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 29.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 1,304.84 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 39.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 810.12 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 5.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.04 Tons | LANDFILL | 101247 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 326.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 659.69 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 188.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 8.18 Bbl | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 691.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 118.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 173.07 Bbl | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 795.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 828.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 1,219.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 14.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2142923 | Primary Facility | 2012-11-07 | Drilling/Alteration | No Violations Noted | DEP on site 9:15. H&P 371. Diaz spud rig on site drilling conductors. Conductors 5,3,2 are set. Currently drilling lateral. TIH at time of inspection. Walked site. Several tears observed in secondary containment. Noted them to Company Man. Plastic repair contractor on site already reparing other sections. Company man also indicated they will be restoring secondary containment around new cellars. Will be moving to #5 next. No violations observed at this time. |
2369292 | Primary Facility | 2015-05-13 | Routine/Complete Inspection | No Violations Noted | |
2435957 | Primary Facility | 2015-12-28 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:00 a.m., the cellar was full of water with no bubbling observed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 767psi on the production casing. I took a walk around the location and everything looked OK. |
2438952 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | No Violations Noted | Inspection of the well pad in conjunction with the Corporate Pipeline notice of termination inspection. No issues observed on the well pad. |
2496238 | Primary Facility | 2016-06-24 | Site Restoration | No Violations Noted | Inspection of the Frystak C P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices were in place according to approved plans and appear to be functioning properly. Based on the site inspection, I recommend this notice of termination be APPROVED. |
2534021 | Primary Facility | 2016-11-01 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:40p.m., the cellar had water at the bottom with no bubbling noticed. The (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank. There was 615psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 14:15p.m. |
2560664 | Primary Facility | 2017-01-27 | Incident- Response to Accident or Event | No Violations Noted | |
2568326 | Primary Facility | 2017-02-23 | Routine/Complete Inspection | No Violations Noted | The Department was on site at the C Frystak Well Site to conduct a Routine Complete Inspection. I reviewed the E&S Inspection Log which read that Mike Brilla (TEC) conducted the most recent inspection on 11-29-16 and it was a PCSM Inspection. The site has been restored. |
2621663 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:45a.m.
The cellar was full of water with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. All the annulus vent pipes were connected to one pipe going into the same tank. There was 552psi on the production casing and 475psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:30p.m. |
2732567 | Primary Facility | 2018-05-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 3' below grade in the cellar and there was no bubbling noticed, there was no gas detected in the remainder of the cellar. The (13x9) and (9x5) annuli vent pipes were connected together and venting to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2827631 | Primary Facility | 2019-01-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of ice. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]