X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20819

Well Details

Well ID: 37-115-20819
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Middletown Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 147917
Farm/Lease Name: CAMP COMFORT 07 185 01 1H
License Status:
Spud Date:
Permit Date: 2012-01-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.838108
Longitude: -76.112592

For data sources see[1][2][3]

Well History

Date Event
2012-01-12 New Permit Application
2012-01-31 Performed Spud Operation
2012-03-25 Drilling Completion
2012-06-04 Perforation
2012-06-04 Performed Stimulation
2013-05-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-05-28 2012-05-28 5,962 4,447,590

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRAC SAND Trican Well Service Frac Proppant Quartz 14808-60-7 100.00 16.15
Hydrochloric Acid 3.5 Trican Well Service Acid Spearhead Water 7732-18-5 96.50 0.38
Hydrochloric acid 7647-01-0 3.50 0.01
GFR-1 Trican Well Service Friction Reducer NON-HAZARDOUS 100.00 0.07
AI-7NR Trican Well Service Acid Inhibitor Propargyl alcohol 107-19-7 1.00 0.00001000
GBO-1 Trican Well Service Breaker Sodium perborate tetrahydrate 10486-00-7 100.00 0.00017000
LSI-21 Trican Well Service Scale Inhibitor NON-HAZARDOUS 100.00 0.05
Fresh Water Trican Well Service Carrier/Base Fluid - 100.00 47.71
WG-111L Trican Well Service Gelling Agent polysaccharide blend 60.00 0.00228000
Distillates, petroleum, hydrotreated light 64742-47-8 60.00 0.00228000
BIOCLEAR 5000 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10.00 0.00558000
Polyethylene glycol 25322-68-3 70.00 0.03
FEAC-20 Trican Well Service Iron Control Acetic acid 64-19-7 50.00 0.00116000
Citric acid 77-92-9 30.00 0.00070000
Recycled Produced Water Trican Well Service Carrier/Base Fluid - 100.00 38.27
Hydrochloric Acid 7.5 Trican Well Service Acid Spearhead Water 7732-18-5 92.50 0.04
Hydrochloric acid 7647-01-0 7.49 0.00348000

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-06-04 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 651,808.90 140 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 1,608,398.40 359 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 1,243,155.70 346 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 887,189.30 347 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 818,742.00 278 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 807,339.20 365 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 558,921.50 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 442,811.10 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 REPSOL OIL & GAS USA LLC Produced Fluid 80.06 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 REPSOL OIL & GAS USA LLC Produced Fluid 680.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 REPSOL OIL & GAS USA LLC Produced Fluid 405.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 REPSOL OIL & GAS USA LLC Produced Fluid 2,062.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 835.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 7,437.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 470.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 44.10 Tons LANDFILL 100361
2013 REPSOL OIL & GAS USA LLC Produced Fluid 1,422.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 3.68 Tons LANDFILL 100361
2014 REPSOL OIL & GAS USA LLC Produced Fluid 518.92 Bbl REUSE OTHER THAN ROAD SPREADING
2015 REPSOL OIL & GAS USA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 190.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Produced Fluid 100.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 2.81 Tons LANDFILL NY # 02S17
2016 REPSOL OIL & GAS USA LLC Produced Fluid 1,216.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 53.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 2.81 Tons LANDFILL NY # 02S17
2016 REPSOL OIL & GAS USA LLC Produced Fluid 277.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 REPSOL OIL & GAS USA LLC Produced Fluid 166.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 8,339.19 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 2.24 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 11.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 61.76 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Produced Fluid 1,963.26 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Produced Fluid 269.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 REPSOL OIL & GAS USA LLC Produced Fluid 69.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 REPSOL OIL & GAS USA LLC Produced Fluid 894.29 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 386.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Produced Fluid 22.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 141.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 25.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Produced Fluid 572.46 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2049728 Primary Facility 2012-03-12 Drilling/Alteration No Violations Noted Precision Rig 209. Preparing to drill out intermediate. Surface casing set at 541 and cemented to surface with 45 bbl returns. Intermediate set at 931' and cemented with 20 bbl return to surface. Drilers log on site and up to date. No water reported and no significant shallow gas shows reported. Secondry containment in place. Discussed solids area with Co. man. Currently no containment where track hoe moveds from mixing tanks to loading tanks. Concern is dripping invert cuttings on ground during transfer.
2125341 Primary Facility 2012-12-18 Routine/Complete Inspection No Violations Noted WEll is currently online. Sand trap in place 2" dump line connected to frac tank on site. There is a 2" vent line coming off what appears to be 5 1/2' annulus. When cup hand over vent, slight pressure build occurs. Pressure gauge on well reads @600lbs. Request Operator to provide status of well including information regarding vent line on 5 1/2" annulus.
2136598 Primary Facility 2013-01-30 Routine/Complete Inspection No Violations Noted
2331583 Primary Facility 2014-12-19 Routine/Complete Inspection No Violations Noted The Department was on site at the Talisman Energy Camp Comfort Well Site (05-185) to conduct a routine complete inspection on December 19, 2014.
2361408 Primary Facility 2015-04-15 Routine/Complete Inspection No Violations Noted
2392809 Primary Facility 2015-07-09 Routine/Complete Inspection No Violations Noted Saxon Drilling Rig #172 is at the site currently in the process drilling the lateral section of the Camp Comfort 9H well at a depth of (1,226) feet. Compromised liner integrity was observed in the containment for the Camp Comfort 1H gas production unit and a generator is not stored on containment in the corner of the Well Pad nearest the access road.
2407909 Primary Facility 2015-09-15 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the Camp Comfort Well site. The wells associated with this site are:
2409683 Primary Facility 2015-09-15 Routine/Complete Inspection No Violations Noted Saxon Drilling Rig #172 has moved off the location relatively. The Camp Comfort 1H well is in production. The 4H, 5H, 6H, 7H 8H, 9H and 10H wells have been drilled to total depth. The most recent rilling resumption notice was submitted by Talisman to the Department on 8-27-15 for the Camp Comfort 4H well. The 2H and 3H wells have been plugged. While in the process of surveying the pad surface where the liner was staged, there were several small spots of dark staining indicative of oil based mud observed. The spots were located next to the top of the 5H well cellar, in the west corner of the pad past all of the wells and in between the production tanks containment and wells. During the inspection, Big West Oil Field Services used a skid steer to clean up the impacted areas mentioned above in the inspection report.
2446759 Primary Facility 2016-02-04 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:55 a.m., I was accompanied by Jon Sassi and Frank Hoehle of the department that was conducting a site inspection. We met with company men Dell Gunn and Kris Perritt. Halliburton was on site; they completed the second stage on the 6H and were running the wire line. They are working on the 4H, 5H, 6H, and 7H. They have 1 stage done on the 4H and 5H, and 2 stages done on the 6H and 7H. The 1H was temporarily plugged while fracturing is being done. We took a walk around the location and found some spots of water that tested high in conductivity on the containment. We let the company man know and he had a water truck vac the water up.

We left the site at 12:15 p.m.

2447323 Primary Facility 2016-01-20 Incident- Response to Accident or Event No Violations Noted The Department was on site to conduct an inspection in response to two small spills at the Camp Comfort Well site. The wells associated with this site are:

115-21980, 115-21981, 115-21982, 115-21983, 115-21984, 115-21985, 115-21986, 115-20819, 115-20820, 115-20821, 115-20822, 115-20823, 115-20824.

The first spill was on 1/16/16 at 1600hrs. A power steering hose on a water truck on site broke, resulting in a 1/2 gallon release of power steering fluid to containment. It was vacuumed up immediately. Company man Billy Watts reported spill.

The second spill occurred on 1/20/2016 at approximately 0840hrs. A hydraulic hose on a man lift broke, releasing approximately 1 gallon of hydraulic fluid. The fluid and soil was immediately scooped up into a 5 gallon bucket. Golder and Associates removed soil. Company man Billy Watts reported spill.

There was adequate vegetation throughout the site, and there were no erosional issues apparent at this time.

There are no violations.

If there are any questions ple

2449792 Primary Facility 2016-02-04 Routine/Complete Inspection No Violations Noted Halliburton is the Talisman subcontractor at the site in the process of conducting hydraulic fracturing operations. Conductivity readings were in the range of (10-14) milliSiemens/cm³ on containment in between a gas buster and an OPSCO USA trailer. Billy Watts of Talisman informed us of a friction reducer (FR) spill of (1) gallon in volume on containment which occurred at 9:30 AM on 2/4/16. The friction reducer spilled to containment was immediately recovered and placed back into the blender tank in preparation to be used for frac operations. Kris Perritt of Talisman informed us of a diesel fuel of one-half gallon on the road leading to this well pad, Beaumont Road. The area where the diesel fuel spilled has been remediated. The impacted area where the fuel was spilled at N-41.84285°; W-076.11749°, is marked off with (2) shovels. Impacted material has been placed in a small plastic garbage container staged on plastic sheeting.
2451985 Primary Facility 2016-02-12 Incident- Response to Accident or Event No Violations Noted Sheridan Anderson of Talisman Energy USA contacted The DEP Scranton District Office at 8:24 AM on 2/12/16 to report a spill of (17) barrels of production fluid to secondary containment in the south section of the pad. Mr. Anderson stated that the spill occurred at 5:30 AM on 2/12/16 and has been cleaned up. Halliburton is the Talisman subcontractor on-site in the process of conducting hydraulic fracturing operations. The spill occurred due to a valve left open on a frac tank while Talisman was circulating water in frac tanks and the manifold for the tanks to prevent the water from freezing. An estimated (17) barrels of Production Fluid overflowed the frac tank onto the tank battery secondary containment liner. A tear potentially created by a forklift was discovered in the New Pig liner where the fluid was spilled as a heater hose was moved. The impact to the pad surface beneath the liner is unknown at this point. The hole in the liner has been patched.
2454268 Primary Facility 2016-02-18 Follow-up Inspection No Violations Noted I conducted an inspection of the site accompanied by Frank Hoehle, DEP O&G WQS and Eric Rooney, Professional Geologist. We met with Sheridan Anderson, site company man and Jarrod Hughes, Project Scientist of Woodard and Curran. Hydraulic fracturing operations are in progress. Halliburton is on the 13th stage of the Camp Comfort 7H well, with a (22) stages to be completed according to Mr. Anderson. I used a Hanna Soil Test and Electrical Conductivity & Temperature meter and Oakton Multi-Parameter Tester 35 to field screen water in the sump on the pad surface, near the sump on the pad surface and in water on containment behind the frac tanks in the tank battery. I recorded (12) milliSiemens/cm³ conductivity in the sump containing water, (8.8) milliSiemens/cm³ conductivity on the pad surface in the trench near the sump and (2.2) milliSiemens/cm³ conductivity on the pad surface near the end of the trench, east of the sump and (11) milliSiemens/cm³ on containment.
2461885 Primary Facility 2016-02-26 Follow-up Inspection No Violations Noted I conducted an inspection of the site accompanied by David Schoonover, DEP OGI and Cydney Faul-Halsor, Licensed Professional Geologist in the Environmental Cleanup and Brownfields Program of PADEP Northeast Regional Office in Wilkes-Barre, PA. We met with Jarrod Hughes, Project Scientist of Woodard and Curran, Gordon Bennett, Talisman site safety supervisor and Dell Gunn, Talisman site company man. Frac operations are in progress. Sump #1 was filled with water. It is apparent that production fluid continues to seep into the trench and flow into this sump. Conductivity in water in the sump was (8) milliSiemens/cm³; (3) milliSiemens/cm³ on the pad surface in the trench next to the sump and (1.3) milliSiemens/cm³ at the end of the trench, east of the sump. Barium in the 2/13/16 and 2/16/16 sample results exceeded the PA statewide health standards. Aluminum, Chloride, Manganese and Iron exceeded the EPA secondary maximum contaminant level. Strontium exceeds the EPA drinking water standards.
2462696 Primary Facility 2016-03-04 Incident- Response to Accident or Event No Violations Noted The Department was on site to conduct an inspection in response to two small spills at the Camp Comfort Well Site (ESX11-115-0056) The wells associated with this site are:

115-21980, 115-21981, 115-21982, 115-21983, 115-21984, 115-21985, 115-21986, 115-20819, 115-20820, 115-20821, 115-20822, 115-20823, 115-20824.

Dell Gunn, company man for Talisman called in a small spill on March 4, 2016 to report a spill on the site. The spill occurred at around 0945 hrs. during fracking of the 10H well. When going to flush, the pressure spiked and the safety/pressure relief valve opened briefly, allowing approximately 5 to 10 gallons of an 80%fresh water - 20%flowback water to fall on containment. There was a vac truck on standby on site, and the spill was vac'd up immediately by Midosa. The Department inspected the site and all of the released water was cleaned up.

There was adequate vegetation throughout the site, and there were no erosional issues apparent at this time.

There are no violations.

2467823 Primary Facility 2016-03-16 Follow-up Inspection No Violations Noted The Department noted blue fluid in the metal crate where the TIW valves were housed. The Department requested the operator respond appropriately to remove the fluid. The Company Man explained that they would deploy sorbent pads to remove the fluid. An associate on site explained that they believed the fluid to be paint.
2475138 Primary Facility 2016-04-04 Follow-up Inspection No Violations Noted The Department was on site to conduct an inspection at the Camp Comfort Well Site (ESX11-115-0056) The wells associated with this site are:

115-21980, 115-21981, 115-21982, 115-21983, 115-21984, 115-21985, 115-21986, 115-20819, 115-20820, 115-20821, 115-20822, 115-20823, 115-20824.

The Department arrived on site at the Camp Comfort location at approximately 1400 hours. While on site for around 20 minutes, the Department did not make contact with any personnel. There was nobody in the foreman's trailer, nor were any personnel observed near the wells. The site was quiet and it is assumed there was flowback going on at this time. With the onset of rain, the Department vacated the site.

There was adequate vegetation throughout the site, and there were no erosional issues apparent at this time.

There are no violations.

If there are any questions please feel free to contact me.

2479937 Primary Facility 2016-04-27 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:00 a.m., a crew was still conducting flow back on the wells that were recently fracked. The containment and the tanks were still on site. The cellar was empty and there was cement between the (20x13) annulus and the (13x9) annulus, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and 100% methane, there was about 1100psi on the production casing, I took a walk around the location and everything looked OK.

I left the site at 10:55 a.m.

2501105 Primary Facility 2016-07-05 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete Inspection at the Camp Comfort Well Site (ESX11-115-0056). The wells associated with this site are:

115-21980, 115-21981, 115-21982, 115-21983, 115-21984, 115-21985, 115-21986, 115-20819, 115-20820, 115-20821, 115-20822, 115-20823, 115-20824.

   Jonathan Sassi and Frank Hoehle were on site to inspect the Camp Comfort well site.  The site had some ongoing monitoring and excavation work open due to a release earlier this year. (Photo 1)   When checked with a Hanna EC and Soil Probe HI98331, the areas around the excavations showed conductivity as follows:  at 41.83790 76.11297 there were readings of 1.7millisiemens (mS), and 1mS.  The soil in this area was slightly damp.  Downgradient of the previous spill area the soil was dry, with readings (in the vicinity of GPS location 41.83767  76.11309) as follows:  0.4mS, 0.46mS, 0.8mS and 0.64mS.  The containment for the frac tank for spill sump was dry, with orange staining.  (Photo 2)  The vegetation around
2548998 Primary Facility 2016-12-28 Incident- Response to Accident or Event No Violations Noted The Department was on site to conduct an inspection in response to a release (complaint number 324228) at the Camp Comfort Well Site (ESX11-115-0056). The wells associated with this site are:

115-21980, 115-21981, 115-21982, 115-21983, 115-21984, 115-21985, 115-21986, 115-20819, 115-20820, 115-20821, 115-20822, 115-20823, 115-20824.

Jack Bolyard (Talisman rep) notified Bob Bisignani (NERO-ER) of a spill which occurred at 10:00 PM on 12/25/2016. The spill was referred to the Scranton office through Alice Adams on 12/27/2016 at 11:30AM. 420 gallons (10 bbls.) of production fluid was released to containment on 12/25/2016 at around 6:30AM. The water in the containment froze and will be removed when the ice melts. Jon Sassi contacted Jack Bolyard from Talisman and Frank Hoehle inspected the site on 12/28/2016

The ground during the 12/28/2016 was mostly frozen, but a few readings with a Hanna EC soil conductivity meter were able to be performed. These readings were all taken around the perimeter of the pr

2554783 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m., the cellar was empty. There was cement between the (20x13) and (13x9) annuli’s, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and 100% methane. There was 497psi on the production casing and 373psi on the production line. There was a 500bbl tank on site and on containment; the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 14:05p.m.

2641691 Primary Facility 2017-09-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was no gas detected at the (20x13) and (13x9) annuli. The (9x5) annulus was venting into the atmosphere with gas detected at 100% LEL and 100% methane. There was a 500bbl tank on containment, the containment had some patches but appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2733962 Primary Facility 2018-05-23 Routine/Complete Inspection No Violations Noted I performed a RTNC AT the Camp Comfort well site. The wells associated with this site are as follows: 115-20819, 115-20820, 115-20821, 115-21980, 115-21981, 115-21982, 115-21983, 115-21984, 115-21985, 115-21986. The wells were all properly labeled.

The access road and pad surface were wet but solid due to recent rains.

The cut slope and fill slope were both vegetated where rock was not so abundant it prohibited growth. The vegetation on the fill slope was comprised of woody plants (raspberries), providing an excellent soil holding medium. The site was stable overall and there were no erosional issues noted during the inspection.

There were no violations observed.

2747370 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty and there was cement between the (20x13) and (13x9) annuli. The (9x5) annulus was venting to the atmosphere with gas detected at 100% LEL and 100% methane. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2848550 Primary Facility 2019-03-05 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty with cement between the (20x13) and (13x9) annuli and there was no gas detected. The (9x5) annulus was venting to the atmosphere. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References

BESbswy