If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-115-20848 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.659036,"lon":-75.689583,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Lenox Township | |
| Operator Name: SWN PROD CO LLC | |
| Well Pad ID: 144713 | |
| Farm/Lease Name: SHIVELY SORENSON 2H | |
| License Status: Plugged and Abandoned | |
| Spud Date: 2012-02-04 | |
| Permit Date: 2012-02-03 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.659036 | |
| Longitude: -75.689583 |
| Date | Event |
|---|---|
| 2012-02-03 | New Permit Application |
| 2012-02-05 | Performed Spud Operation |
| 2013-02-28 | New Permit Application |
| 2013-05-27 | Drilling Completion |
| 2014-03-09 | Perforation |
| 2014-03-09 | Performed Stage 1 of Stimulation |
| 2014-03-09 | Performed Stage 2 of Stimulation |
| 2014-03-10 | Perforation |
| 2014-03-10 | Performed Stage 3 of Stimulation |
| 2014-03-10 | Performed Stage 4 of Stimulation |
| 2014-03-10 | Performed Stage 5 of Stimulation |
| 2015-12-07 | Inactive Well Request Granted |
| 2016-11-03 | Begin Plugging |
| 2016-11-11 | Finished Plugging |
| 2017-04-27 | Deviated |
| 2017-04-27 | Fully Plugged |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-03-09 | 2014-03-10 | 7,491 | 1,885,880 | 0 |
| 2 | 2017-10-27 | 2017-11-03 | 6,292 | 8,430,580 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 88.1324 | 15,841,500.0 |
| Sand (Proppant), DAP-901, DAP-925, DWP-603, BioClear 2000, DWP-NE1, Hydrochloric Acid |
CWS | Propping Agent, Scale Inhibitor, Acid Corrosion Inhibitor, Friction Reducer, Biocide, Non-Emulsifier, Clean Perforations | 2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 40 | 0.01291 | 2321.02 | |
| Oxyalkylated polyamine | Proprietary | 5 | 0.00072 | 129.13 | ||||
| Paraffinic hydrocarbon solvent | 64742-47-8 | 30 | 0.01765 | 3171.94 | ||||
| Polyoxyalkylenes | Proprietary | 30 | 0.0002 | 35.92 | ||||
| Calcite | 471-34-1 | 1 | 0.01396 | 2509.42 | ||||
| Formaldehyde | 50-00-0 | 0.1 | 0.00002000 | 4.25 | ||||
| Organic phosphonate 1 | Proprietary | 30 | 0.00431 | 774.77 | ||||
| Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01291 | 2321.02 | ||||
| Apatite | 64476-38-6 | 0.1 | 0.00517 | 928.86 | ||||
| Amine salt | Proprietary | 5 | 0.00072 | 129.13 | ||||
| Modified thiourea polymer | 68527-49-1 | 30 | 0.0002 | 35.92 | ||||
| Ilmenite | 98072-94-7 | 0.1 | 0.0045 | 809.36 | ||||
| Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.01761 | 3164.53 | ||||
| Methanol | 67-56-1 | 60 | 0.01131 | 2033.3 | ||||
| Ammonium chloride | 12125-02-9 | 10 | 0.00186 | 334.5 | ||||
| Sodium chloride | 7647-14-5 | 1 | 0.00001000 | 1.2 | ||||
| Illite | 12173-60-3 | 1 | 0.01216 | 2185.27 | ||||
| Goethite | 1310-14-1 | 0.1 | 0.0065 | 1167.85 | ||||
| Sorbitan monooleate | 1338-43-8 | 5 | 0.00333 | 598.48 | ||||
| Propargyl Alcohol | 107-19-7 | 10 | 0.00007000 | 11.97 | ||||
| Isopropanol | 67-63-0 | 40 | 0.01761 | 3164.53 | ||||
| Olefin | Proprietary | 5 | 0.00003000 | 5.99 | ||||
| Hydrochloric acid | 7647-01-0 | 37 | 0.59828 | 107538 | ||||
| Acetic acid | 64-19-7 | 1 | 0.00014 | 25.83 | ||||
| Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.0898 | 1,993,360.0 | ||||
| Organic phosphonate 2 | Proprietary | 10 | 0.00144 | 258.26 | ||||
| Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.00333 | 598.48 | ||||
| Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.0022 | 395.57 | ||||
| Fatty acids | Proprietary | 30 | 0.0002 | 35.92 | ||||
| Poly(Acrylamide and Adam methyl Chloride) | 69418-26-4 | 40 | 0.02331 | 4189.35 | ||||
| Biotite | 1302-27-8 | 0.1 | 0.00517 | 928.86 | ||||
| 2 | HAI-150E | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
| FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
| Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 85.8743 | 70,226,500.0 | |
| SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| BE-9 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.12762 | 922152 | |
| SAND-PREMIUM WHITE-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| LP-65 MC | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0287678 | 23526 | ||||
| Hydrochloric acid | 7647-01-0 | 60 | 0.152383 | 124616 | ||||
| Diammonium phosphate | 7783-28-0 | 5 | 0.00116836 | 956 | ||||
| Non-hazardous food substance | Proprietary | 100 | 0.000310596 | 254 | ||||
| Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00401838 | 3287 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 12.9501 | 10,590,300.0 | ||||
| Inorganic salt | Proprietary | 30 | 0.0287678 | 23526 | ||||
| Ammonium chloride | 12125-02-9 | 30 | 0.00701016 | 5733 | ||||
| Acrylamide acrylate copolymer | Proprietary | 30 | 0.0287678 | 23526 | ||||
| Organic phosphonate | Proprietary | 60 | 0.0140203 | 11466 |
For data sources see[5]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2014-03-09 | 1 | SAND | 1,920,912 | 7,673 | 6,992 |
| 2014-03-09 | 2 | SAND | 1,920,912 | 7,582 | 7,052 |
| 2014-03-10 | 3 | SAND | 1,920,912 | 7,571 | 7,469 |
| 2014-03-10 | 4 | SAND | 1,920,912 | 7,657 | 7,295 |
| 2014-03-10 | 5 | SAND | 1,920,912 | 7,787 | 7,639 |
For data sources see[6]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2011 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2013 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | SOUTHWESTERN ENERGY PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2012 | SOUTHWESTERN ENERGY PROD CO | Drill Cuttings | 1,378.00 Tons | LANDFILL | NY STATE #32S11 |
| 2012 | SOUTHWESTERN ENERGY PROD CO | Drilling Fluid Waste | 242.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
| 2012 | SOUTHWESTERN ENERGY PROD CO | Drill Cuttings | 1,104.00 Tons | LANDFILL | THR029 |
| 2013 | SOUTHWESTERN ENERGY PROD CO | Drill Cuttings | 470.98 Tons | LANDFILL | 101247 |
| 2013 | SOUTHWESTERN ENERGY PROD CO | Produced Fluid | 4,432.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2014 | SOUTHWESTERN ENERGY PROD CO | Fracing Fluid Waste | 7,429.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2014 | SOUTHWESTERN ENERGY PROD CO | Fracturing Fluid Waste | 56.72 Tons | LANDFILL | THR029 |
| 2015 | SWN PROD CO LLC | Produced Fluid | 157.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | SWN PROD CO LLC | Synthetic Liner Materials | 7.00 Tons | LANDFILL | 101247 |
| 2016 | SWN PROD CO LLC | Drilling Fluid Waste | 1,194.48 Bbl | LANDFILL | THR029 |
| 2016 | SWN PROD CO LLC | Fracturing Fluid Waste | 1,357.00 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[8]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2047068 | Primary Facility | 2012-02-28 | Drilling/Alteration | No Violations Noted | Falcon 23. Drilling ahead at 750'. Secondary containment in place. Will be setting 13 3/8" at 935'. Will drill out and set 9 5/8" at 1600'. Will drill down to KOP then mobilize to next location. Asked Operator to notify DEP when mobilize to next location. |
| 2378830 | Primary Facility | 2015-06-08 | Routine/Complete Inspection | No Violations Noted | |
| 2485153 | Primary Facility | 2016-05-16 | Routine/Complete Inspection | No Violations Noted | |
| 2525647 | Primary Facility | 2016-10-04 | Routine/Complete Inspection | No Violations Noted | |
| 2530528 | Primary Facility | 2016-10-19 | Routine/Complete Inspection | No Violations Noted | Pre-plugging inspection of SWN’s Shively Sorenson well in Lenox Twp. Susquehanna County conducted October 19, 2016 at 10:45 am. Operator has sent Notice of Intent and plugging prognosis for review. At the time of inspection; I met with SWN on location. The 2H has a production tree in place, shut-in, not tied into pipeline. Analog pressure gauge at the tree top (tubing) and wing valve (prod. csg.) both show approx. 3300 PSI, verified with SWN well tender’s crystal gauge at taylor plug valves. The Crystal Gauge broke when the well tender went to check the pressure on the backside of the production casing (“9 x 5”) annulus, so he opened up the valve on the otherside of the 9 5/8” casinghead up to a fluid-filled gauge; 0 PSI on the backside of production casing. I asked him for SWN to contact me if there is any pressure on the annulus after verifying with a different crystal gauge later in the day. The cellar was empty. The 9 5/8” csg’s annulus had water on the cement top; no bubbling or gas verified with Altair |
| 2534422 | Primary Facility | 2016-11-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspection of SWN’s Shively Sorenson 2H in Lenox Twp. Susquehanna County conducted November 3rd, 2016 at 1 pm. CWS workover rig was staged on the pad for P&A operations. At the time of inspection; slickline was rigged up on the well with tools stuck in the hole. Well kill fluid being pumped. Once tools are recovered the rig will continue P&A procedure; pull tubing, set CIBP and set balanced cmt plug in days to follow. I plan to return after the rig pulls production casing and sets balanced cement plugs back from the stub-openhole and in openhole – back across 9 5/8” shoe. No major concerns at this time. |
| 2535459 | Primary Facility | 2016-11-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspection of SWN’s Shively Sorenson 2H in Lenox Twp. Susquehanna County conducted November 9rd, 2016 at 10:30 am. CWS workover rig was rigged up on the well for P&A operations. O-TEX Cementers were spotting in and rigging up. I met with the Companyman to discuss operations on the pad since my last visit 11/3. CIBP was set at 7202’, balanced cmt plug set on top; the rig tagged plug at 7015’. Stretch test indicated estimated TOC @ 3200’. 1st 5 ½” csg cut was made at 2952’, pulled 60K over w/ no success, made 2nd cut at 2492’ and pulled casing. We went over depths and volumes for remaining balanced cement plugs. O-TEX rigged up to circulate mud out the hole w/gel and cement. No Issues. |
| 2537569 | Primary Facility | 2016-11-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspection of SWN’s Shively Sorenson 2H in Lenox Twp. Susquehanna County conducted November 15, 2016 at 11:40 am to conduct inspection of adequacy of plugging after last week’s plugging operations. At the time of inspection, the casinghead on the 9 5/8” had marker cap welded flush with flange. In addition; Nipple/ ball valves have been removed from the side outlets welded closed, disallowing access to the wellbore before burial. Cap was welded approx. 1 day after mixing, pumping, and spotting production csg stub isolation plug and the 9 5/8” shoe plug, and approx. 2 hours after mixing, pumping, and spotting last (2) balance cement plugs inside the 9 5/8”. I contacted the operator in phone conversation from the pad to discuss the obvious problems with this practice. Operator plans to cut the abandonment cap to allow access to the wellbore in order to evaluate the adequacy of plugging to verify the job was successful. No violations cited at this moment. |
| 2539816 | Primary Facility | 2016-11-21 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspection of SWN’s Shively Sorenson 2H in Lenox Twp. Susquehanna County conducted November 21, 2016 at 10:55 am. At time of inspection; 2” pipe nipple tapped into well abandonment cap w/valve, 2”x 1/2” reducer coupling, needle valve. I opened the 2” valve and needle valve; needle valve was full of ice. Shut in the 2”, removed the needle valve, opened the 2”, pipe nipple had obstruction inside where it threaded onto the marker cap. I poked through obstruction in nipple with steel rod and took a field reading with an Altair 5x gas meter which yielded 6% LEL. I installed a 0-150PSI analog pressure gauge on the well; no buildup after ~10 min. I then opened the bleeder on my pressure gauge to a balloon; no inflation, indicating no measurable flow of gas at this time. Although there is not a measurable flow of gas to warrant a violation at this time I am recommending the operator let the well open to allow any residual gas that may have been trapped between surface plug and marker cap to escape and to make sure t |
| 2539821 | Primary Facility | 2016-11-29 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspection of SWN’s Shively Sorenson 2H in Lenox Twp. Susquehanna County conducted November 29, 2016 at 12:00 pm. At the time of inspection; the 2” valve and needle valve coming off the marker cap were open, having been vented since my last site visit 11/21 per my recommendation to the operator. I removed the needle valve and threaded ½” pex fitting w/hose attached to Altair 5x gas meter. A field reading with the gas meter yielded no gas detectable in any amount at this time. I gave the operator the go ahead to shut in and bury the well. No violations noted. |
| 2558463 | Primary Facility | 2017-02-01 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Routine inspection of a plugged well. The well was plugged ~3 months ago. The below-ground marker is now buried in the cellar with gravel. The location was snow covered and there were no obvious concerns noted on the surface. |
| 2852643 | Primary Facility | 2019-03-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A routine, post-plugging inspection of this plugged unconventional well was conducted March 8, 2019. At the time of inspection, the site is reclaimed and the plugged well is now cut and buried below grade. The location was snow-covered. I stood at the buried well location; there were no open holes, discharges, venting, staining, bubbling, or other obvious issues observed at this time. |
For data sources see[9]