37-115-20864

Well Details

Well ID: 37-115-20864
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Franklin Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 150661
Farm/Lease Name: HDK EAST 1 7H
License Status:
Spud Date:
Permit Date: 2012-02-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.877419
Longitude: -75.820614

For data sources see[1][2][3]

Well History

Date Event
2012-02-08 New Permit Application
2012-02-23 Performed Spud Operation
2012-04-06 Drilling Completion
2012-05-19 Perforation
2012-05-19 Performed Stimulation
2013-05-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-05-15 2012-05-15 6,406 3,304,075

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00388000
BE-9M Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00472000
Methanol 67-56-1 30.00 0.01
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
GBW-30 Breaker Halliburton Energy Services Breaker
Carbohydrates 95.00 0.00151000
Hemicellulase enzyme 9012-54-8 15.00 0.00024000
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 13.93
WG-36 Gelling Agent Halliburton Energy Services Gel Guar gum 9000-30-0 100.00 0.00170000
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00159000
Water Carrier/Base Fluid Water 100.00 85.86
Cla-Web Halliburton Energy Services Clay Control
Proprietary 60.00 0.02
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.13

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-05-19 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 XPR RESOURCES LLC 208,443.29 59 0.00 0 0.00 0
2013 XPR RESOURCES LLC 1,119,990.78 355 0.00 0 0.00 0
2014 XPR RESOURCES LLC 843,849.48 365 0.00 0 0.00 0
2015 SWN PROD CO LLC 623,796.43 364 0.00 0 0.00 0
2016 SWN PROD CO LLC 572,411.00 366 0.00 0 0.00 0
2017 SWN PROD CO LLC 268,608.00 289 0.00 0 0.00 0
2018 SWN PROD CO LLC 294,088.00 332 0.00 0 0.00 0
2019 SWN PROD CO LLC 202,895.00 352 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XPR RESOURCES LLC Drilling Fluid Waste 602.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2012 XPR RESOURCES LLC Drilling Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XPR RESOURCES LLC Produced Fluid 111.89 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 XPR RESOURCES LLC Drill Cuttings 1,323.17 Tons LANDFILL 100933
2013 XPR RESOURCES LLC Produced Fluid 348.85 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013 XPR RESOURCES LLC Produced Fluid 345.12 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XPR RESOURCES LLC Produced Fluid 391.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XPR RESOURCES LLC Produced Fluid 565.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 XPR RESOURCES LLC Produced Fluid 402.16 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 XPR RESOURCES LLC Produced Fluid 598.96 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC010
2013 XPR RESOURCES LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 XPR RESOURCES LLC Produced Fluid 1,435.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 XPR RESOURCES LLC Produced Fluid 280.22 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 SOUTHWESTERN ENERGY PROD CO Produced Fluid 1,376.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 64.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 SWN PROD CO LLC Produced Fluid 394.33 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Other Oil & Gas Wastes 65.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Produced Fluid 1,569.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 201.67 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 222.50 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 88.72 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 224.00 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 392.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Synthetic Liner Materials 6.00 Tons LANDFILL 100933
2018 SWN PROD CO LLC Produced Fluid 537.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 655.82 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Waste Water Treatment Sludge 3.36 Tons LANDFILL 301358
2019 SWN PROD CO LLC Produced Fluid 539.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Other Oil & Gas Wastes 65.87 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 181.00 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Produced Fluid 55.00 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2053629 Primary Facility 2012-03-22 Drilling/Alteration No Violations Noted Patterson 332. Drilled vertical to 6548' and logged hole. TOH then will kick off. Running gyro then will confirm KOP with gyro. Walked site. Secondary containment in place. should pump out water from storage tane area on bakc of pad. Open-top tank used for solidifying cuttings is very full. Need to keep freeboard below 2'. Will be installing auger system to solidy cuttings during lateral. Had 50' sks top job on 9 5/8". Fell back approx 50' due to air bubble during cement job. No bubbling observed.
2355745 Primary Facility 2015-03-27 Routine/Complete Inspection No Violations Noted
2363635 Primary Facility 2015-04-22 Routine/Complete Inspection No Violations Noted
2429913 Primary Facility 2015-12-04 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:40 a.m., the cellar was full of gravel, the vent pipe was open and set up with a Taylor plug, there was no gas detected at the perimeter of the cellar, there was 339psi on the production casing and 279psi on the production line. I took a walk around the location and everything looked OK.
2508820 Primary Facility 2016-04-21 Routine/Complete Inspection No Violations Noted Inspection of the HDK West well pad in conjunction with the HDK to Mitchell pipeline notice of termination inspection. There were no issues observed on the well pad at the time of the inspection.
2525584 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:25p.m., the cellar was full of gravel and there was no gas detected at the perimeter of the cellar. The vent pipe was open and set up with a Taylor plug to check for pressure, there was 241psi on the production casing and 182psi on the production line. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 14:00p.m.

2575836 Primary Facility 2017-03-23 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete Inspection. The E&S Inspection Log indicated that KSG conducted the most recent inspection on 3/9/17. The site is mostly snow covered.
2617560 Primary Facility 2017-07-20 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:05p.m.

The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge. There was 849psi on the production casing and 845psi on the production line. The well was not producing at time of inspection, the main valve going to the GPU was closed. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:45p.m.

2722108 Primary Facility 2018-04-23 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2823574 Primary Facility 2019-01-08 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was shut in at the GPU. The cellar was full of gravel and I was unable to check for gas at the perimeter of the cellar because the gravel was frozen. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]