If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20936 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.780661,"lon":-75.847158,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Bridgewater Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148266 | |
Farm/Lease Name: E BUNNELL 6 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-06-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.780661 | |
Longitude: -75.847158 |
Date | Event |
---|---|
2012-06-07 | New Permit Application |
2012-06-09 | Performed Spud Operation |
2012-08-18 | Drilling Completion |
2012-10-04 | Perforation |
2012-10-04 | Performed Stimulation |
2013-05-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-09-27 | 2012-09-27 | 6,628 | 5,180,826 | |
2 | 2012-09-06 | 2012-09-06 | 6,628 | 1,402,884 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |
Alpha 1427 | Baker Hughes | Biocide | Glutaraldehyde | 111-30-8 | 0.30 | 0.00679900 | ||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 0.05 | 0.00113300 | |||||
Ethanol | 64-17-5 | 0.05 | 0.00113300 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 0.10 | 0.00226600 | |||||
GW-3LDF | Baker Hughes | Gelling Agent | Quartz | 14808-60-7 | 5.00 | 0.00040900 | ||
Isotridecanol, ethoxylated | 9043-30-5 | 5.00 | 0.00040900 | |||||
Guar gum | 9000-30-0 | 0.60 | 0.00490700 | |||||
Distillates, petroleum, hydrotreated light paraffinic | 64742-55-8 | 0.30 | 0.00245400 | |||||
1-Butoxy-2-propanol | 5131-66-8 | 0.05 | 0.00040900 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00245400 | |||||
Sand, White, 40/70 | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 10.88 | ||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acidizing | Water | 7732-18-5 | 0.85 | 0.50 | ||
Hydrochloric acid | 7647-01-0 | 0.15 | 0.08 | |||||
CI-14 | Baker Hughes | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 0.05 | 0.00004400 | ||
Olefin | 0.05 | 0.00004400 | ||||||
Polyoxyalkylenes | 30.00 | 0.00026500 | ||||||
Fatty Acids | 0.10 | 0.00008800 | ||||||
Ferrotrol 300L | Baker Hughes | Iron Control | ||||||
Water | Operator | Carrier | Water | 7732-18-5 | 1.00 | 87.68 | ||
Enzyme G-NE | Baker Hughes | Breaker | Hemicellulase Enzyme Concentrate | 9025-56-3 | 0.05 | 0.00006500 | ||
Water | 7732-18-5 | 0.95 | 0.00123800 | |||||
Ferrotrol 300L | Hughes | Iron Control | ||||||
Citric acid | 77-92-9 | 0.60 | 0.00076800 | |||||
Sand, White, 100 mesh | Baker Hughes | Proppant | Quartz | 14808-60-7 | 1.00 | 0.66 | ||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Ethylene glycol | 107-21-1 | 0.30 | 0.00452000 | ||
Calcium chloride | 10043-52-4 | 5.00 | 0.00075300 | |||||
Clay Master-5C | Baker Hughes | Clay Control | 1,2-Ethanediaminium, N, N'-bis[2-[bis(2-hydroxyethyl)methylammonio]ethyl]-N,N'bis(2-hydroxyethyl)-N,N'-dimethyl-,tetrachlorid e |
138879-94-4 | 0.60 | 0.00035900 | ||
2 | Super TSC LT | Superior Well Services | Paraffin & Scale Additive | Proprietary | 50.00 | 0.01 | ||
Proprietary | 15.00 | 0.00373800 | ||||||
0.00373800 | ||||||||
Water | 7732-18-5 | 60.00 | 0.01 | |||||
Proprietary | 15.00 | |||||||
Iron Acid 10M (12.6-18.0) | Superior Well Services | Acid Blend | Water | 7732-18-5 | 84.10 | 0.50 | ||
Hydrochloric acid | 7647-01-0 | 15.80 | 0.09 | |||||
Proprietary | 1.20 | 0.00720300 | ||||||
WFR-3B | Superior Well Services | Friction Reducer | 1,2-Propylene glycol | 57-55-6 | 40.00 | 0.04 | ||
Water | 7732-18-5 | 40.00 | 0.04 | |||||
Ethoxylated C12-16 alcohols | 68551-12-2 | 15.00 | 0.01 | |||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.05 | |||||
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00549000 | |||||
Microparticle | 1.00 | 0.00109800 | ||||||
KR-153SL | Superior Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00545900 | ||
Water | 7732-18-5 | 80.00 | 0.02 | |||||
PA Specific 40/70 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Alumina | 1344-28-1 | 1.10 | 0.12 | ||
Ferric oxide | 1309-37-1 | 0.10 | 0.01 | |||||
Quartz | 14808-60-7 | 99.90 | 10.91 | |||||
Titanium dioxide | 13463-67-7 | 0.10 | 0.01 | |||||
Acid Inhibitor 2 (AI-2) | Superior Well Services | Acid Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 20.00 | 0.00020200 | ||
Tar bases, quinoline derivatives, benzyl chloride-quaternized |
72480-70-7 | 10.00 | 0.00010100 | |||||
Poly(oxy-1,2-ethanediyl), alpha-(nonylphenyl)-omega-hydroxy-
, |
68412-54-4 | 13.00 | 0.00013100 | |||||
Water | 7732-18-5 | 40.00 | 0.00040300 | |||||
Isopropanol | 67-63-0 | 15.00 | 0.00015100 | |||||
Glycol Ethers | 20.00 | 0.00020200 | ||||||
PA Specific 100 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Alumina | 1344-28-1 | 1.10 | 0.00647400 | ||
Quartz | 14808-60-7 | 99.90 | 0.58 | |||||
Titanium dioxide | 13463-67-7 | 0.10 | 0.00058900 | |||||
Ferric oxide | 1309-37-1 | 0.10 | 0.00058900 | |||||
Water | Carrier/Base Fluid | 100.00 | 87.48 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-10-04 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 1,084,087.08 | 78 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 3,451,309.43 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,884,718.19 | 349 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,029,054.21 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,339,657.20 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 965,397.69 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 896,465.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 706,214.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 718.97 Tons | LANDFILL | NY STATE #32S11 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 95.11 Bbl | LANDFILL | NY STATE #32S11 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 3,190.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 26.46 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 10.88 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 6,644.74 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 83.46 Tons | LANDFILL | 101247 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 45.75 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 472.64 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 3,263.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,820.08 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,977.14 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 4,014.31 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 605.79 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 74.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 652.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 314.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 185.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 230.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 228.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 108.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 196.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 89.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 170.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2119744 | Primary Facility | 2012-11-26 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | Arrived at the site at 10:00 in response to a release of approximately (20) gallons of production fluid that occurred on 11-21-12 at 4:30 AM. Mr. Webster reported the spill to the Department on 11/21/12 at 12:54 PM. According to the incident report, the result of the release was due to a hammer union coming apart on the line to the production tank associated with the E Bunnell 6H Well. Cabot was able to determine the quantity of the release based on the alarm and the amount of fluid that has been sent to the production fluid tank. G.L Parrish, Cabot and Resource Environmental Inc. arrived at 6AM on 11/21/12 to rig down the GPU. GDS began excavation at 2PM on 11/21/12 under the supervision of Resource. A total of (20) cubic yards of impacted material has been removed from the site. The impacted material was placed into (2) roll-off containers, each half full. |
2124217 | Primary Facility | 2012-10-03 | Incident- Response to Accident or Event | No Violations Noted | |
2125850 | Primary Facility | 2012-11-26 | Incident- Response to Accident or Event | No Violations Noted | Cabot consultant noted a stained area around the production tanks. At this time the consultant took soil conductivity readings which were noted to be “suspect.” Production tanks were rigged down and moved. The production tanks are now situated on liner. On 11/23/12 the stained area was excavated and samples were collected. The excavation measured an approximate 34’X25’X3.5”. A total of 30 cubic yards of material were removed. The waste disposal will be handled by Diaz and it will be taken to Tunnel Hill Landfill in Ohio. Cabot employees suspect the issue occurred due to hoses that were rigged on the top of the production tanks to offload the fluid. Possible that the lines were not being cleared sufficiently, and fluid left in the lines had been dripping over time in the area causing the stain.Mr. Webster stated that Cabot Oil & Gas removed the hoses from the top of the tank and will now have the truck drivers attach the hose upon arrival and remove the hose at departure to prevent future occurrences. Violations attached to (115-20935) |
2304148 | Primary Facility | 2014-08-28 | Routine/Partial Inspection | No Violations Noted | |
2367428 | Primary Facility | 2015-05-06 | Routine/Complete Inspection | No Violations Noted | |
2438826 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:00 p.m., the cellar was full of water and ice with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 739psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 13:30 p.m. |
2440731 | Primary Facility | 2015-09-08 | Routine/Complete Inspection | No Violations Noted | Inspection in conjunction with the notice of termination inspection of the Vandermark Pipeline. No issued observed at the time of the inspection. |
2489060 | Primary Facility | 2016-05-26 | Site Restoration | No Violations Noted | Inspection of the Bunnell E P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices are in place according to approved plans and appear to be functioning properly. However, it appears all temporary erosion and sedimentation BMPs have not been removed from the site - a triple filter sock sediment trap remains on the east side of the pad. There are also areas that are not meeting the permanent stabilization requirements and are a cause for concern regarding erosion: 1. The former access road from the well pad to the restored tank pad has little to no vegetation and is sloped enough to be a concern regarding erosion. 2. The south fill slope is sparsely vegetated in areas and has tracks with no vegetation from some type of heavy equipment running from the well pad surface to the bottom of the slope in several areas. The spa |
2541671 | Primary Facility | 2016-12-05 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:30p.m., the cellar was about half full of water with no bubbling noticed. The (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 609psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 14:05p.m. |
2557863 | Primary Facility | 2017-02-02 | Routine/Complete Inspection | No Violations Noted | The Department was on site in response to the receipt of a Restoration Report. At the time of the inspection, the Department noted that the E&S Inspection Log indicated that Jeff Look (TEC) conducted the most recent inspection on1/4/2016 and that it was a post precipitation inspection.
PCSM BMP's included a vegetated filter strip south of the well site. The site appears to be stable. |
2743314 | Primary Facility | 2018-06-18 | Routine/Complete Inspection | No Violations Noted | There was no activity occurring at the site during the inspection. There were no violations noted. If you have any questions, please contact me. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2119744 | 654812 | 11/26/2012 | 2012-11-26 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
2119744 | 654813 | 11/26/2012 | 2012-11-26 | 78.57 - Failure to post pit approval number | Administrative | Failure to collect the brine and other fluids produced during the operation and service of the well in a tank, pit or a series of pits or tanks, or other device approved by the Department for subsequent disposal or reuse. |
2119744 | 654815 | 11/26/2012 | 2012-11-26 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[9]