If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20937 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.780703,"lon":-75.847156,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Bridgewater Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148266 | |
Farm/Lease Name: E BUNNELL 10 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-06-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.780703 | |
Longitude: -75.847156 |
Date | Event |
---|---|
2012-06-07 | New Permit Application |
2012-06-09 | Performed Spud Operation |
2012-08-01 | Drilling Completion |
2012-10-02 | Perforation |
2012-10-02 | Performed Stimulation |
2013-05-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-09-18 | 2012-09-18 | 6,580 | 8,781,066 | |
2 | 2012-09-07 | 2012-09-07 | 6,580 | 515,844 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MaxPerm 20 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00554800 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Calcium chloride | 10043-52-4 | 5.00 | 0.00075100 | ||
Ethylene glycol | 107-21-1 | 30.00 | 0.00450800 | |||||
Sand, White, 40/70 | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 10.66 | ||
Clay Master-5C | Baker Hughes | Clay Control | 1,2-Ethanediaminium, N, N'-bis[2-[bis(2-hydroxyethyl)methylammonio]ethyl]-N,N'bis(2-hydroxyethyl)-N,N'-dimethyl-,tetrachlorid e |
138879-94-4 | 60.00 | 0.00035500 | ||
Alpha 1427 | Baker Hughes | Biocide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.00 | 0.00109600 | ||
Ethanol | 64-17-5 | 5.00 | 0.00109600 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00219200 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00657500 | |||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acidizing | Water | 7732-18-5 | 85.00 | 0.49 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | |||||
Ferrotrol 300L | Baker Hughes | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00075800 | ||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Sand, White, 100 mesh | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 0.60 | ||
CI-14 | Baker Hughes | Corrosion Inhibitor | Polyoxyalkylenes | 30.00 | 0.00026100 | |||
Olefin | 5.00 | 0.00004400 | ||||||
Propargyl alcohol | 107-19-7 | 5.00 | 0.00004400 | |||||
Fatty Acids | 10.00 | 0.00008700 | ||||||
Water | Operator | Carrier | Water | 7732-18-5 | 100.00 | 88.00 | ||
2 | Iron Acid 10M (12.6-18.0) | Superior Well Services | Acid Blend | Hydrochloric acid | 7647-01-0 | 15.80 | 0.13 | |
Proprietary | 1.20 | 0.01 | ||||||
Water | 7732-18-5 | 84.10 | 0.70 | |||||
WFR-3B | Superior Well Services | Friction Reducer | Ethoxylated C12-16 alcohols | 68551-12-2 | 15.00 | 0.01 | ||
Microparticle | 1.00 | 0.00101200 | ||||||
Water | 7732-18-5 | 40.00 | 0.04 | |||||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.04 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.05 | |||||
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00506100 | |||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
EB-4L | Superior Well Services | Gel Breakers | Cellulase enzyme | |||||
Water | 7732-18-5 | |||||||
Demulsifier Base | ||||||||
Ethylene glycol | 107-21-1 | 25.00 | 0.00024700 | |||||
Proprietary | ||||||||
Saturated sucrose | 57-50-1 | |||||||
LSG-100 | Superior Well Services | Gelling Agents | Distillates, petroleum, hydrotreated light | 64742-47-8 | 60.00 | 0.05 | ||
Ethoxylated propoxylated C12-14 alcohols | 68439-51-0 | 2.00 | 0.00193300 | |||||
Guar gum | 9000-30-0 | 50.00 | 0.04 | |||||
Quartz | 14808-60-7 | 2.00 | 0.00193300 | |||||
OB-2 | Superior Well Services | Gel Breakers | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.01 | ||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 20.00 | 0.00272200 | |||||
Silica, amorphous | 7631-86-9 | 10.00 | 0.00136100 | |||||
PA Specific 100 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Alumina | 1344-28-1 | 1.10 | 0.00601900 | ||
Ferric oxide | 1309-37-1 | 0.10 | 0.00054700 | |||||
Titanium dioxide | 13463-67-7 | 0.10 | 0.00054700 | |||||
Quartz | 14808-60-7 | 99.90 | 0.54 | |||||
Water | Carrier/Base Fluid | 100.00 | 90.27 | |||||
PA Specific 40/70 mesh Sand | Superior Well Services | Sand - Bulk - Pennsylvania | Titanium dioxide | 13463-67-7 | 0.10 | 0.00768800 | ||
Alumina | 1344-28-1 | 1.10 | 0.08 | |||||
Quartz | 14808-60-7 | 99.90 | 7.68 | |||||
Ferric oxide | 1309-37-1 | 0.10 | 0.00768800 | |||||
KR-153SL | Superior Well Services | Biocide | Water | 7732-18-5 | 80.00 | 0.02 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00734200 | |||||
Super TSC LT | Superior Well Services | Paraffin & Scale Additive | Water | 7732-18-5 | 60.00 | 0.07 | ||
Proprietary | 50.00 | 0.06 | ||||||
Proprietary | 15.00 | 0.01 | ||||||
Acid Inhibitor 2 (AI-2) | Superior Well Services | Acid Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 20.00 | 0.00028300 | ||
Poly(oxy-1,2-ethanediyl), alpha-(nonylphenyl)-omega-hydroxy-
, |
68412-54-4 | 13.00 | 0.00018400 | |||||
Water | 7732-18-5 | 40.00 | 0.00056600 | |||||
Glycol Ethers | 20.00 | 0.00028300 | ||||||
Tar bases, quinoline derivatives, benzyl chloride-quaternized |
72480-70-7 | 10.00 | 0.00014200 | |||||
Isopropanol | 67-63-0 | 15.00 | 0.00021200 | |||||
PH-15L | Superior Well Services | pH Control Additive | Water | 7732-18-5 | 65.00 | 0.00759800 | ||
Sodium hydroxide | 1310-73-2 | 30.00 | 0.00350700 | |||||
Sodium chloride | 7647-14-5 | 5.00 | 0.00058400 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-10-02 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 1,181,785.42 | 78 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 4,068,002.53 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 2,118,858.24 | 351 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,054,127.15 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,323,504.10 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 1,032,566.47 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 907,502.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 762,331.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 853.58 Tons | LANDFILL | NY STATE #32S11 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 692.21 Bbl | LANDFILL | NY STATE #32S11 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 2,750.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 36.27 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 4,975.96 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 3.41 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 45.75 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 363.31 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 4,325.87 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 873.03 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 3,521.32 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,578.16 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 778.95 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 34.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 788.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 29.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 359.53 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 184.55 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 187.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 183.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 104.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 170.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 91.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 305.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2085134 | Primary Facility | 2012-07-18 | Drilling/Alteration | No Violations Noted | Patterson 538. Co. man David Blood. Walked site with Co. Man. Secondary containment in place and in good condition. Drillers log on site and up to date. 20" set at 122' (kb), 13 3/8" set at 536' (kb), and 9 5/8" set at 1708' (kb). Proposed TD = 12855'. Currently drilling ahead at 3090'. No violations observed at time of inspection. |
2124219 | Primary Facility | 2012-10-03 | Incident- Response to Accident or Event | No Violations Noted | |
2125852 | Primary Facility | 2012-11-26 | Incident- Response to Accident or Event | No Violations Noted | Cabot consultant noted a stained area around the production tanks. At this time the consultant took soil conductivity readings which were noted to be “suspect.” Production tanks were rigged down and moved. The production tanks are now situated on liner. On 11/23/12 the stained area was excavated and samples were collected. The excavation measured an approximate 34’X25’X3.5”. A total of 30 cubic yards of material were removed. The waste disposal will be handled by Diaz and it will be taken to Tunnel Hill Landfill in Ohio. Cabot employees suspect the issue occurred due to hoses that were rigged on the top of the production tanks to offload the fluid. Possible that the lines were not being cleared sufficiently, and fluid left in the lines had been dripping over time in the area causing the stain.Mr. Webster stated that Cabot Oil & Gas removed the hoses from the top of the tank and will now have the truck drivers attach the hose upon arrival and remove the hose at departure to prevent future occurrences. Violations attached to (115-20935) |
2304149 | Primary Facility | 2014-08-28 | Routine/Partial Inspection | No Violations Noted | |
2367427 | Primary Facility | 2015-05-06 | Routine/Complete Inspection | No Violations Noted | |
2438827 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:00 p.m., the cellar was full of water and ice with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 714psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 13:30 p.m. |
2440728 | Primary Facility | 2015-09-08 | Routine/Complete Inspection | No Violations Noted | Inspection in conjunction with the notice of termination inspection of the Vandermark Pipeline. No issued observed at the time of the inspection. |
2489063 | Primary Facility | 2016-05-26 | Site Restoration | No Violations Noted | Inspection of the Bunnell E P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices are in place according to approved plans and appear to be functioning properly. However, it appears all temporary erosion and sedimentation BMPs have not been removed from the site - a triple filter sock sediment trap remains on the east side of the pad. There are also areas that are not meeting the permanent stabilization requirements and are a cause for concern regarding erosion: 1. The former access road from the well pad to the restored tank pad has little to no vegetation and is sloped enough to be a concern regarding erosion. 2. The south fill slope is sparsely vegetated in areas and has tracks with no vegetation from some type of heavy equipment running from the well pad surface to the bottom of the slope in several areas. The spa |
2541672 | Primary Facility | 2016-12-05 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:30p.m., the cellar had water at the bottom with no bubbling noticed. The (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 596psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.
I left the site at 14:05p.m. |
2557866 | Primary Facility | 2017-02-02 | Routine/Complete Inspection | No Violations Noted | The Department was on site in response to the receipt of a Restoration Report. At the time of the inspection, the Department noted that the E&S Inspection Log indicated that Jeff Look (TEC) conducted the most recent inspection on1/4/2016 and that it was a post precipitation inspection.
PCSM BMP's included a vegetated filter strip south of the well site. The site appears to be stable. |
2743318 | Primary Facility | 2018-06-18 | Routine/Complete Inspection | No Violations Noted | There was no activity occurring at the site during the inspection. There were no violations noted. If you have any questions, please contact me. |
For data sources see[9]