Well Details

Well ID: 37-115-21089
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: New Milford Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 145736
Farm/Lease Name: ZEFFER 1H
License Status:
Spud Date:
Permit Date: 2012-12-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.814644
Longitude: -75.766336

For data sources see[1][2][3]

Well History

Date Event
2012-12-20 New Permit Application
2013-05-10 Performed Spud Operation
2013-07-01 New Permit Application
2014-03-10 Drilling Completion
2014-05-31 Perforation
2014-06-09 Performed Stimulation
2015-01-12 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-09 2014-06-15 6,608 10,810,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6486 Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00277764 3165.55
AI-600 Weatherford Acid Inhibitor Ethylene Glycol 107-21-1 60 0.00141097 1608.02
N,N-Dimethylformamide 68-12-2 40 0.000940649 1072.02
Ethoxylated Nonylphenol 68412-54-4 10 0.000235162 268.004
Cinnamaldehyde 104-55-2 10 0.000235162 268.004
2-Butoxyethanol 111-76-2 7 0.000164614 187.603
Triethyl Phosphate 78-40-0 7 0.000164614 187.603
Isopropyl Alchol 67-63-0 7 0.000164614 187.603
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.000305711 348.405
15% HCl Reagent Acid HCL 7647-01-0 15 0.141097 160802
K Bac -1020 WST Biocide Polyethylene glycol 25322-68-3 60 0.00657943 7498.28
2,2-Diobrom-3nirilopropionamide 10222-01-2 20 0.00219314 2499.43
FRA-405 Clearwater Friction Reducer Alcohols, C-12-16, Ethoxylated 68551-12-2 7 0.00465162 5301.25
Petroleum Distillates 64742-47-8 40 0.0265807 30292.9
Sodium Chloride 7647-14-5 10 0.00664517 7573.21
Ammonium Chloride 12125-02-9 7 0.00465162 5301.25
Sand Keane Sand Crystalline Silica, Quartz 14808-60-7 100 12.9458 14,753,800.0
Water SWN Water / Produced Water H2O + Disolved Salts 7732-18-5 100 86.0245 98,038,400.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-06-09 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 SOUTHWESTERN ENERGY PROD CO 0.00 0 0.00 0 0.00 0
2014 SOUTHWESTERN ENERGY PROD CO 1,348,190.00 146 0.00 0 0.00 0
2015 SWN PROD CO LLC 3,294,617.00 365 0.00 0 0.00 0
2016 SWN PROD CO LLC 2,740,563.00 366 0.00 0 0.00 0
2017 SWN PROD CO LLC 1,381,596.00 364 0.00 0 0.00 0
2018 SWN PROD CO LLC 1,220,658.00 365 0.00 0 0.00 0
2019 SWN PROD CO LLC 1,406,668.00 361 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 SOUTHWESTERN ENERGY PROD CO Drill Cuttings 877.47 Tons LANDFILL 101247
2014 SOUTHWESTERN ENERGY PROD CO Fracing Fluid Waste 3,909.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SOUTHWESTERN ENERGY PROD CO Fracturing Fluid Waste 81.03 Tons LANDFILL THR029
2014 SOUTHWESTERN ENERGY PROD CO Drill Cuttings 845.93 Tons LANDFILL 101247
2014 SOUTHWESTERN ENERGY PROD CO Produced Fluid 3,992.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWN PROD CO LLC Produced Fluid 1,214.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Other Oil & Gas Wastes 25.20 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Fracturing Fluid Waste 22.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 463.60 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Other Oil & Gas Wastes 33.40 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Drilling Fluid Waste 154.80 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 300.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 22.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 292.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 46.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 113.40 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Other Oil & Gas Wastes 89.73 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 130.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 3,961.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 205.33 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Other Oil & Gas Wastes 818.31 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Synthetic Liner Materials 17.00 Tons LANDFILL 100933

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2177123 Primary Facility 2013-05-21 Routine/Complete Inspection No Violations Noted The primary reason for my inspection was to view the Aerion Rental Sevices centrifuge system. This system, which was first encountered by the Department at the Range Unit 64 (Boman) Well Pad on 5-10-13, separates solid and liquid material from drill cuttings during air and mist drilling of the vertical section of the well. Solids are deposited into steel containers in preparation for landfill disposal and the remaining liquid goes into frac tanks labeled dirty water. The liquid material, which is essentially a fluid, is beneficially reused for dust control during air and mist drilling. This process involves the addition of chemicals consisting of calcium nitrate and a polymer as a slurry feed for flocculation. An alternative waste management practice (OG-71) authorization is required for this process. On May 31, 2013 SAIC forwarded to me via e-mail a revised OG-71 template for this site. The template contained MSD sheets for SEDIFLOC 7115, an anionic organic flocculant and synthetic organic polymer.
2467800 Primary Facility 2016-03-21 Routine/Complete Inspection No Violations Noted On 3/21/16, the Department conducted an inspection of the SWN RU 29 Zeffer Pad and the 2 impoundments. The small impoundment was inspected first. The new liner has been installed. Normal operations are now occurring. During the inspection 2 water trucks were observed off-loading to this impoundment. All equipment associated with the dewatering and solids removal of the small impoundment has been removed. As suggested by the Department, the soil has been removed and replaced from the area between the off-loading concrete pad and the small impoundment. The disturbed areas has been seeded and mulched. The small impoundment appears to be about 1/3 full and the large impoundment appears to be approximately 1/3 full. All of the slopes associated with the pad and impoundments were inspected and appeared stable and well vegetated. No violations noted.
2482675 Primary Facility 2016-05-10 Routine/Complete Inspection No Violations Noted
2509157 Primary Facility 2016-08-03 Routine/Complete Inspection No Violations Noted On 8/3/16, the Department conducted an inspection of the SWN Zeffer Well Pad and Impoundment’s 1 and 2. Also present during the inspection were Eric Rooney, Department Geologist and Mike Deming, SWN Senior Regulatory Analyst. Mr. Rooney was on-site evaluating SWN’s efforts in meeting their Work Plan submitted by CB&I consulting dated March 10, 2016, titled in part as “Additional Hydrogeologic Investigation Report for the Zeffer Impoundments.” At the time of the inspection, a small drill rig was on-site collecting core samples next to Monitoring Well # 8. This activity is being conducted to ensure that the monitoring well was constructed and installed properly based on the localized geology. A review of the large and small impoundment found that they were below the 2’ free board level required of waste water impoundments. The large impoundment had a free board level of about 4’, while the small impoundment was in the range of 5’. A review of the well pad found that there is good vegetative stability, a
2555318 Primary Facility 2017-01-25 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:05p.m., the cellar was full of gravel and there was no gas detected at the perimeter of the cellar. The vent pipe was open and set up with a Taylor plug to check for pressure and the valve going to the production tank was closed. There was 661psi on the production casing and 566psi on the production line. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 13:50p.m.

2646755 Primary Facility 2017-10-12 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. I took a walk around the location and there were no obvious concerns noticed.

2693651 Primary Facility 2018-02-09 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. No E&S issues noted. No violations noted.
2736057 Primary Facility 2018-05-23 Routine/Complete Inspection No Violations Noted The department arrived on sited at 1220 hrs to conduct a RTNC inspection of the Zeffer 29 Well Pad. The department was represented by Casey Baldwin (DEP-WQS) and myself.

Upon arrival at the pad, it was noted that the proper signage was displayed at the entrance to the pad's access road, and the appropriate paperwork was present in the mailbox. The access road appeared solid and stable, with no apparent erosion even after substantial rains during the past few days.

No E&S issues were observed, and all PCSM stormwater management BMPs were present and in good condition.

Mr. Baldwin and I departed the pad at 1320 hrs.

2751711 Primary Facility 2018-07-13 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2844414 Primary Facility 2019-02-22 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, the site is snow covered. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.
2852346 Primary Facility 2019-03-12 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of gravel and there was no gas detected at the perimeter of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 3/4/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]