If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21194 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.655544,"lon":-75.960386,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149374 | |
Farm/Lease Name: STONE UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-03-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.655544 | |
Longitude: -75.960386 |
Date | Event |
---|---|
2013-03-25 | New Permit Application |
2013-04-02 | Performed Spud Operation |
2013-05-07 | Drilling Completion |
2013-07-17 | Perforation |
2013-07-21 | Performed Stimulation |
2014-03-17 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-22 | 2013-07-25 | 7,581 | 4,439,060 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.08 | 0 |
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.03 | 0 | |
BA-40L | Halliburton | Buffering Agent | Potassium Carbonate | 584-08-7 | 60 | 0.001 | 0 | |
Bactron K-139 | Champion Technologies | Biocide | Glutaraldehyde | 111-30-8 | 5 | 0.002 | 0 | |
Ethanol | 64-17-5 | 5 | 0.002 | 0 | ||||
Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.004 | 0 | ||||
Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10 | 0.001 | 0 | |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-07-21 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 894,566.00 | 118 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 1,414,745.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 827,198.42 | 348 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 455,491.14 | 273 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 594,931.94 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 335,566.22 | 293 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 179,932.17 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 640.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 864.46 Tons | LANDFILL | 100933 |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 722.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 577.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 187.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 106.54 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 11.08 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 134.94 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 345.89 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 37.85 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 4.40 Tons | LANDFILL | 301358 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2164535 | Primary Facility | 2013-05-06 | Drilling/Alteration | No Violations Noted | 20 set at 80 |
2219339 | Primary Facility | 2013-11-06 | Routine/Complete Inspection | No Violations Noted | Well drilled/fract and flowing |
2318004 | Primary Facility | 2014-10-28 | Drilling/Alteration | No Violations Noted | |
2441780 | Primary Facility | 2016-01-19 | Routine/Complete Inspection | No Violations Noted | Inspection of the Stone Unit Pad for current or potential E&S issues due to a recent drilling permit application for the #3H well. The site is less than 5 acres. The site is stable, vegetation coverage around the pad and access is stable, and no erosion issues were observed. The PCMS controls appear to be installed according to the 2010 E&S and restoration plans. They basically consist of a drainage channel around the pad that drains on both sides to a sediment basin and appear to be functioning properly. The access road is in good condition and the PCSMs (drainage channel and culverts, and etc) are in place according to the plans referenced above with no apparent problems. |
2485157 | Primary Facility | 2016-05-11 | Routine/Complete Inspection | No Violations Noted | |
2491271 | Primary Facility | 2016-06-02 | Follow-up Inspection | No Violations Noted | I conducted an inspection of the site accompanied by Scott Kuchta, DEP O&G WQS. A coiled tubing unit is on the location. Shortly after our arrival at 10:30, wet met with Gilbert Blevins, site company man, consultant of Chief. Mr. Blevins stated the following information. "We just finished drilling out frac plugs on the 3H well. We started to drill out the plugs yesterday. There were (12) frac plugs drilled out. The plugs were drilled out at a rate of (15) barrels an hour, (3) barrels in 3.25 hours. The Rain for Rent frac tanks contain water from the frac plug drill out process and water used during the frac. The frac job was completed last week. All of the wells are currently shut in."
Chief submitted a stimulation notification to the Department on 5-18-16. The notification indicated stimulation of the Stone Unit 3H would commence on 5/24/16 at 6:00 AM. According to our records, there are (8) wells drilled on the pad. The 2H, 1V, 5H and 4H wells were in production. The 6H, 7H and 8H have been |
For data sources see[9]