If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-115-21274 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.797781,"lon":-75.786381,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Brooklyn Township | |
| Operator Name: CABOT OIL & GAS CORP | |
| Well Pad ID: | |
| Farm/Lease Name: HUSTON J 7 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2013-05-29 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.797781 | |
| Longitude: -75.786381 |
| Date | Event |
|---|---|
| 2013-05-29 | New Permit Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2180208 | Primary Facility | 2013-06-25 | Routine/Complete Inspection | No Violations Noted | The Department was on site at the Houston J Well Site for a routine inspection. Well permits that have been issued for this pad are the 1H (115-21272), 2H (115-21273), 7H (115-21274), and the 8H (115-21275). The access road is 50% complete. Still in the process of clearing and grubbing the well pad site. E&S BMP’s are being installed as work progresses. Current stabilization is adequate. This inspection does not qualify as a preoperational inspection. |
For data sources see[5]