If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21329 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.931147,"lon":-75.867247,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Liberty Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: CARRAR 1 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-07-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.931147 | |
Longitude: -75.867247 |
Date | Event |
---|---|
2013-07-01 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2585577 | Primary Facility | 2017-04-13 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection. At the time of my inspection, I noted that the E&S Inspection Checklist Site Inspection Log indicated that the most recent inspection occurred on 4/11/17 and no attention was needed. |
2585580 | Primary Facility | 2017-04-13 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection. At the time of my inspection, I noted that the E&S Inspection Checklist Site Inspection Log indicated that the most recent inspection occurred on 4/11/17 and no attention was needed. |
For data sources see[5]