If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21339 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.660206,"lon":-75.755383,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lenox Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 145740 | |
Farm/Lease Name: SPENCER UNIT 4H | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2013-07-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.660206 | |
Longitude: -75.755383 |
Date | Event |
---|---|
2013-07-30 | New Permit Application |
2013-09-07 | Performed Spud Operation |
2013-09-18 | Drilling Completion |
2014-06-05 | Drilling Completion |
2014-07-27 | Perforation |
2014-07-27 | Performed Stimulation |
2015-01-12 | DEVIATED |
2015-01-13 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-07-27 | 2014-07-31 | 7,632 | 8,193,070 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.02 | 0 |
Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.05 | 0 | |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 | |
MCS-2510T | MULTI-CHEM | Scale Inhibitor | ETHYLENE GLYCOL | 107-21-1 | 60 | 0.004 | 0 | |
MCB-8614 | MULTI-CHEM | BIOCIDE | GLUTARALDEHYDE | 111-30-8 | 30 | 0.02 | 0 | |
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE | 68424-85-1 | 5 | 0.003 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-07-27 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 3,867.46 | 13 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 329,558.41 | 353 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 238,974.51 | 333 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 212,762.65 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 770.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 216.44 Tons | LANDFILL | 100933 |
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 957.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 693.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 873.89 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 13,091.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 1,200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 853.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 1,591.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 55.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 23,117.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 9.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 3,793.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 8,082.03 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 240.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 4,588.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 3,720.72 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 3,823.45 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2215681 | Primary Facility | 2013-09-16 | Drilling/Alteration | No Violations Noted | |
2284315 | Primary Facility | 2014-05-20 | Drilling/Alteration | No Violations Noted | orion 15 - Currently at 1002'. moved in on May 12th, started drilling 5/13. 13 3/8 set at 555'. 95/8 dry sy 1505' |
2284379 | Primary Facility | 2014-05-07 | Routine/Complete Inspection | No Violations Noted | Well drilled. No visible bubbling. Crews onsite laying liner and boards |
2326478 | Primary Facility | 2014-12-03 | Routine/Complete Inspection | No Violations Noted | The site had adequate vegetation and was stabilized. The last E&S inspection took place on 11/28/2014. E&S plans were on site and adequate. |
2336757 | Primary Facility | 2015-01-14 | Routine/Complete Inspection | No Violations Noted | On 1/14/15, the Department was on site at the Chief Spencer Well Pad to conduct an inspection. The well permits that have been issued for this site are the Spencer 1H (115-21336), 2H (115-21337), 3H (115-21338), 4H (115-21339), 5H (115-21433), 6H (115-21568), and the 7H (115-21569). Well site stability is good. E & S inspections up-to-date. A crew is on-site conducting flow back operations of the 4H, the only well drilled on this site. The purpose of the flow back operation is to conduct production logging. There are no plans to place this well into production in the near future. A tank farm and flare stack are in place and are being utilized as part of this operation. Containment looks good. No violations noted. |
2337705 | Primary Facility | 2015-01-16 | Follow-up Inspection | No Violations Noted | An Integrated Production Services coil tubing unit is on the location. Flowback procedures are still in progress for the Spencer Unit 4H well. While in the process of surveying secondary containment, the equipment and frac tanks associated with the flowback procedures and the ground surface of the Pad, the Department observed (2) light towers and a heating unit staged on containment systems which are not completely secure. Frac Sand was also observed on the pad surface near the flare stack and on the fill slope of the pad. We inquired with the company man the reason as to why the frac sand was on the pad surface and fill slope. He stated that the sand was used during hydraulic fracturing operations for the Spencer Unit 4H well and remnants of the sand were left at the site. The Department had suspected the possibility a slug of fluid mixed with the sand may have escaped out of the top of the flare stack during natural gas flaring of the well during flowback operations. The company man informed us that this did not occur. |
2437327 | Primary Facility | 2015-11-24 | Routine/Complete Inspection | No Violations Noted | Inspection in conjunction with Hickory Ridge Pipeline NOT inspection. No issues observed. |
2467887 | Primary Facility | 2016-03-22 | Routine/Complete Inspection | No Violations Noted | |
2500347 | Primary Facility | 2016-07-11 | Routine/Complete Inspection | No Violations Noted | |
2542836 | Primary Facility | 2016-11-18 | Routine/Complete Inspection | No Violations Noted | 11/18/16, the Department conducted an inspection of the Chief Spencer Well Pad located in Lenox Township, Susquehanna County. The inspection was in response to a complaint that gas well venting was occurring on this pad. The Department arrived on site and found no active activity occurring on this pad beyond steady state operations. Of the seven wells that have been permitted for this site, only 2 wells have been drilled on this pad, the 3H (115-21338) and the 4H (115-21339). The 3H has only had the Surface and Intermediate casings installed, with inactive status granted on 5/9/16. The 4H has been drilled, stimulated, flowed back, and appears ready to be placed into production, with all associated production equipment installed on-site and tied in. The 4H appeared to be shut in during this inspection. Both wells have their annuluses vented to a single poly tank, with no obvious venting occurring on the pad. As the first photograph shows, an enclosed, fenced in area next to the pad on the well connect |
2736459 | Primary Facility | 2018-05-31 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted. |
2766492 | Primary Facility | 2018-08-20 | Routine/Complete Inspection | No Violations Noted | This inspection was conducted to confirm Chief's assessment that the project meets the minimum requirements for permit termination. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved. |
For data sources see[9]