{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.980797,"lon":-76.077547,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Apolacon Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 149734 | |
Farm/Lease Name: KROPP 07 017 02 C 2H | |
License Status: Active | |
Spud Date: 2013-11-15 | |
Permit Date: 2013-07-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.980797 | |
Longitude: -76.077547 |
Date | Event |
---|---|
2013-07-22 | New Permit Application |
2013-09-05 | Performed Spud Operation |
2013-11-28 | Drilling Completion |
2014-04-20 | Perforation |
2014-05-01 | Performed Stage 1 of Stimulation |
2014-05-02 | Perforation |
2014-05-02 | Performed Stage 2 of Stimulation |
2014-05-02 | Performed Stage 3 of Stimulation |
2014-05-03 | Perforation |
2014-05-03 | Performed Stage 4 of Stimulation |
2014-05-03 | Performed Stage 5 of Stimulation |
2014-05-04 | Perforation |
2014-05-04 | Performed Stage 6 of Stimulation |
2014-05-05 | Perforation |
2014-05-05 | Performed Stage 7 of Stimulation |
2014-05-05 | Performed Stage 8 of Stimulation |
2014-05-06 | Perforation |
2014-05-06 | Performed Stage 10 of Stimulation |
2014-05-06 | Performed Stage 9 of Stimulation |
2014-05-07 | Performed Stage 11 of Stimulation |
2014-05-08 | Perforation |
2014-05-08 | Performed Stage 12 of Stimulation |
2014-05-09 | Perforation |
2014-05-09 | Performed Stage 13 of Stimulation |
2014-05-09 | Performed Stage 14 of Stimulation |
2014-05-09 | Performed Stage 15 of Stimulation |
2014-05-10 | Perforation |
2014-05-10 | Performed Stage 16 of Stimulation |
2014-05-10 | Performed Stage 17 of Stimulation |
2014-05-11 | Perforation |
2014-05-11 | Performed Stage 18 of Stimulation |
2014-05-12 | Performed Stage 19 of Stimulation |
2019-01-11 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-12 | 2014-05-12 | 6,327 | 5,157,580 | 39,000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | White 30/50 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 5.04836 | 2,766,360.0 |
Other Chemicals | Water | 7732-18-5 | 0 | 0 | 0 | |||
Anionic polyacrylamide copolymer | Proprietary | 0 | 0 | 0 | ||||
Sorbitol Tetraoleate | 61723-83-9 | 0 | 0 | 0 | ||||
Ammonium Acrylate | 10604-69-0 | 0 | 0 | 0 | ||||
Acrylamide | 79-06-1 | 0 | 0 | 0 | ||||
Acrylamide P/W acrylic acid ammonium salt | 26100-47-0 | 0 | 0 | 0 | ||||
Trade Secret | Proprietary | 0 | 0 | 0 | ||||
Polyethylene glycol monooleate | 9004-96-0 | 0 | 0 | 0 | ||||
Sorbitan monooleate | 1338-43-8 | 0 | 0 | 0 | ||||
Isopropanol | 67-63-0 | 0 | 0 | 0 | ||||
Nonionic Surfactant | Proprietary | 0 | 0 | 0 | ||||
Alkyloxypolyethylene oxyethanol | 84133-50-6 | 0 | 0 | 0 | ||||
7 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 7.5 | 0.020138 | 11035.1 | |
AI-7NR (Acid Inhibitor) | Trican | Acid Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00001700 | 9.34685 | |
100 Mesh, Bulk (over 20K lbs)* | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 7.34946 | 4,027,300.0 | |
FEAC-20 (Iron Control) | Trican | Iron Control | Citric acid | 77-92-9 | 30 | 0.001208 | 661.757 | |
Acetic acid | 64-19-7 | 45 | 0.001811 | 992.636 | ||||
LSI-21 (Scale Inhibitor) | Trican | Scale Inhibitor | Sodium Salt of Phosphate Ester | 68131-72-6 | 15 | 0.003822 | 2094.47 | |
Acrylic Polymer | 28205-96-1 | 15 | 0.003822 | 2094.47 | ||||
3 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 3.5 | 0.011727 | 6425.96 | |
Water | Customer | Carrier | Water | 7732-18-5 | 100 | 78.5479 | 43,042,100.0 | |
AQUCAR DB 5 (Water Treatment Microbiocide) | Trican | Biocide | Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.000132 | 72.4445 | |
Sodium Bromide | 7647-15-6 | 1.5 | 0.000397 | 217.334 | ||||
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.001322 | 724.445 | ||||
Polyethylene glycol | 25322-68-3 | 65.2 | 0.01724 | 9446.77 | ||||
FR-8 | Trican | Friction Reducer | Petroleum distillates, dewaxed heavy paraffinic | 64742-65-0 | 8 | 0.004824 | 2643.16 | |
Ammonium Chloride | 12125-02-9 | 1.5 | 0.000904 | 495.592 | ||||
Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 28 | 0.016882 | 9251.05 | ||||
Petroleum distillates, hydrotreated heavy paraffinic | 64742-54-7 | 8 | 0.004824 | 2643.16 | ||||
White 40/70 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 8.33273 | 4,566,110.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-05-01 | 1 | White | 4,190,442 | 7,571 | 8,325 |
2014-05-02 | 2 | White | 4,190,442 | 7,570 | 8,653 |
2014-05-02 | 3 | White | 4,190,442 | 7,425 | 8,730 |
2014-05-03 | 4 | White | 4,190,442 | 7,498 | 8,796 |
2014-05-03 | 5 | White | 4,190,442 | 7,664 | 8,691 |
2014-05-04 | 6 | White | 4,190,442 | 7,783 | 8,744 |
2014-05-05 | 7 | White | 4,190,442 | 7,737 | 8,461 |
2014-05-05 | 8 | White | 4,190,442 | 7,475 | 8,315 |
2014-05-06 | 9 | White | 4,190,442 | 7,700 | 8,720 |
2014-05-06 | 10 | White | 4,190,442 | 7,246 | 8,927 |
2014-05-07 | 11 | White | 4,190,442 | 7,729 | 8,786 |
2014-05-08 | 12 | White | 4,190,442 | 8,027 | 8,834 |
2014-05-09 | 13 | White | 4,190,442 | 8,238 | 8,784 |
2014-05-09 | 14 | White | 4,190,442 | 6,952 | 8,069 |
2014-05-09 | 15 | White | 4,190,442 | 8,403 | 8,783 |
2014-05-10 | 16 | White | 4,190,442 | 7,292 | 8,460 |
2014-05-10 | 17 | White | 4,190,442 | 7,618 | 9,380 |
2014-05-11 | 18 | White | 4,190,442 | 7,024 | 8,120 |
2014-05-12 | 19 | White | 4,190,442 | 6,632 | 9,367 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | REPSOL OIL & GAS USA LLC | 167,246.10 | 22 | 0.00 | 0 | 0.00 | 0 |
2015 | REPSOL OIL & GAS USA LLC | 1,420,316.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2016 | REPSOL OIL & GAS USA LLC | 748,748.70 | 254 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 665,595.00 | 242 | 0.00 | 0 | 0.00 | 0 |
2018 | REPSOL OIL & GAS USA LLC | 423,074.40 | 292 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 23,710.80 | 263 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 1,145.69 Tons | LANDFILL | 8-0728-0004/013 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 206.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 267.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | REPSOL OIL & GAS USA LLC | Fracturing Fluid Waste | 37.67 Tons | LANDFILL | 100361 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 14,753.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 183.45 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 28.59 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 765.07 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,100.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,806.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 100.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,234.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 419.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 10.06 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Unused Fracturing Fluid Waste | 19.86 Tons | LANDFILL | 8-0728-0004/013 |
2017 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.05 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2017 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.05 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,675.09 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.31 Tons | LANDFILL | 8-0728-0004/013 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 164.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 15.03 Tons | LANDFILL | 8-0728-0004/013 |
2017 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.31 Tons | LANDFILL | 8-0728-0004/013 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 54.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 14.42 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 562.53 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Drilling Fluid Waste | 0.11 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 421.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 6.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 0.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 0.03 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 8.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 37.38 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.01 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 0.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.01 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2199167 | Primary Facility | 2013-08-28 | Routine/Complete Inspection | No Violations Noted | Pre-operational inspection. |
2219036 | Primary Facility | 2013-10-31 | Routine/Complete Inspection | No Violations Noted | Rec'd notification that the well was spid 09/05/13. Cement/manhole over cellar, unalb eot determine if conductor is set. |
2351117 | Primary Facility | 2015-02-20 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Kropp Well site. The wells associated with this site are: |
2398919 | Primary Facility | 2015-08-17 | Routine/Complete Inspection | No Violations Noted | |
2472238 | Primary Facility | 2016-04-01 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Kropp Well site. The wells associated with this site are:
115-21354 115-21355 115-21356 115-21357 115-21358 The Department arrived on site and talked to the Talisman foreman at approximately 1315 hrs. At this time, the conductor was being drilled with a Soilmec SR30 (excavator based) rig. A Patterson 3 stack rig will be scheduled to arrive on site at a future date to complete any further drilling. There was adequate vegetation throughout the site, and there were no erosional issues apparent at this time. Talisman's last E&S inspection was on 3/29/2016. There are no violations. If there are any questions please feel free to contact me. |
2500381 | Primary Facility | 2016-07-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:15a.m., the cellar was about three quarters full of water with no bubbling noticed, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and peaked at 62% methane with no measurable flow. There was 633psi on the production casing and 393psi on the production tubing. I took a walk around the location and noticed dead vegetation on the right side of the site from the entrance, I contacted Frank Hoehle (DEP water quality specialist) and he informed me that he knew of the area.
I left the site at 11:00a.m. |
2509478 | Primary Facility | 2016-07-09 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Kropp Well site. The wells associated with this site are:
115-21354 115-21355 115-21356 115-21357 115-21358 There was some dead vegetation on the well pad surface and a small area of dead vegetation near an area where it appears a concrete truck cleaned out on the pad surface. Contacted Kris Perrit, Talisman representative. Otherwise, there was adequate vegetation throughout the site, and there were no erosional issues apparent at this time. There are no violations. If there are any questions please feel free to contact me. |
2509481 | Primary Facility | 2016-07-09 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Kropp Well site. The wells associated with this site are:
115-21354 115-21355 115-21356 115-21357 115-21358 There was some dead vegetation on the well pad surface and a small area of dead vegetation near an area where it appears a concrete truck cleaned out on the pad surface. Contacted Kris Perrit, Talisman representative. Otherwise, there was adequate vegetation throughout the site, and there were no erosional issues apparent at this time. There are no violations. If there are any questions please feel free to contact me. |
2509490 | Primary Facility | 2016-08-11 | Follow-up Inspection | No Violations Noted | The Department was on site to conduct a follow up inspection of the Kropp Well site. The wells associated with this site are:
115-21354 115-21355 115-21356 115-21357 115-21358 From Previous Inspection: (There was some dead vegetation on the well pad surface and a small area of dead vegetation near an area where it appears a concrete truck cleaned out on the pad surface. Contacted Kris Perrit, Talisman representative.) After contact with Mr. Perritt, it was concluded that it was indeed concrete cleanout on the pad surface, which is to be cleaned up during upcoming activity at the pad. There was also vegetation killer sprayed on the pad surface itself, resulting in the dead vegetation observed during the visit.
|
2530356 | Primary Facility | 2016-10-11 | Routine/Complete Inspection | No Violations Noted | Patterson Drilling Rig #805 is currently on the location. The current drilling depth is 1,625 feet. The most recent Drilling Resumption notice After Break of 30 days or more was submitted to the Department by Talisman on 10/7/16. The notice indicated that Talisman would commence drilling of the Kropp 6H well on 10/10/16 at 12:01 PM. I met with Vaughn Swanson, site company man of Talisman and Tory Rogers, site safety man of REM Security. Mr. Vaughn informed me the following information. "We are in the process of running a cement bond log. The intermediate casing will be run today and cemented later today. We are drilling with water based mud through the Upper Devonian formation. The surface casing was cemented at (562) feet. We will drill with water based mud through the kickoff point at (4,800) feet. Soli-bond is used to dry the cuttings instead of sawdust or wood pellets. It consists of cement with a hint of lime. Water from the freshwater impoundment up the road is used for drilling. Polymer wi |
2534077 | Primary Facility | 2016-11-01 | Site Restoration | No Violations Noted | The Department was on site to conduct an inspection of the Kropp Well site. The wells associated with this site are:
115-21354 115-21355 115-21356 115-21357 115-21358 Responded to spill of 5-7 gallons of anti-freeze on Thorne or Kropp access road (According to spill notification 323313). Met with company man on site, who related that there was no spill on the Kropp access road to his knowledge. There appeared to be no other issues on site at this time, and there were no Erosion or Sedimentation problems occuring currently.
|
2551248 | Primary Facility | 2017-01-06 | Incident- Response to Accident or Event | No Violations Noted | Jack Burns, company man of Talisman Energy contacted David Schoonover, DEP OGI at 8:15 AM on 1/6/17 to report a spill of (2) gallons oil based mud to the pad surface. I arrived at the site at 12:30 PM on 1/6/17 to conduct an investigation of the incident. I met with Tory Rogers, site safety man of REM security. Talisman was in the process of breaking down the Patterson number 805 drilling rig and equipment and moving it off-site. Mr. Rogers stated the following information associated with the spill. "The spill occurred yesterday, 1/5/17, around 9:00 AM. (2) gallons of synthetic oil based mud from a flow line from that runs from the rig to the mud tanks was spilled to the pad surface about 60 to 70 yards from the where the lease road and well pad meet. The pipe was loaded onto the back of a flatbed truck and rolled as it was set spilling the mud out of the pipe onto the ground. There was no bull plug on the end of the pipe. The spill was cleaned up immediately. A bull plug was attached to the pipe. |
2556740 | Primary Facility | 2017-01-20 | Incident- Response to Accident or Event | No Violations Noted | Frank Hoehle, DEP O&G WQS and I arrived at the site at 11:40 in response to a reported spill of (170) gallons of hydraulic fluid to secondary containment. On 1/15/17, Kevin Augustine, Emergency Response Coordinator of the PADEP NERO Emergency Response Team contacted Eric Rooney, Licensed Professional Geologist in the Oil and Gas Management Program in the Scranton District Office to report the spill. The long description of the standard detail report states the following. "Bill Watts of Talisman notified Kevin Augustine (NERO - ER) who then referred spill to Eric Rooney (Scranton Office - O&G) that 170 gallons of hydraulic fluid was spilled onto 2nd containment." We met with Dave Coxhead, site safety man of REM security upon arrival to the location. Mr. Coxhead stated that Repsol was in the process of rigging up frac operations and they may start hydraulic fracturing of 10 wells here tomorrow. We had a brief discussion of the reported hydraulic fluid spill with Mr. Coxhead. He informed us that he was no |
2559224 | Primary Facility | 2017-02-03 | Incident- Response to Accident or Event | No Violations Noted | Department representatives Frank Hoehle and Jon Sassi were on site to conduct an inspection in response to a reported release on the Repsol Kropp Well site. (ESX12-115-0086)
The wells associated with this site are: 115-21354 115-21355 115-21356 115-21357 115-21358
The release occurred because the auto valve lock on the blender failed so the valve was then manually operated, allowing approximately 20 gallons of blended fluid to overflow the blender and escape onto secondary containment. This blended fluid was immediately vac'd up. The valve problem has since been corrected, but there is residual sand trickling from the blender, which is being periodically cleaned up. This is all on |
2568809 | Primary Facility | 2017-02-23 | Incident- Response to Accident or Event | No Violations Noted | Frank Hoehle, DEP O&G WQS and I arrived at the site at 11:30 to conduct an investigation of an diesel fuel spill of an estimated 1-5 gallons to the ground surface and one-half gallon of antifreeze onto Rig Mats. Halliburton is the Repsol subcontractor performing hydraulic fracturing operations. We met with Gordon Bennett, site safety man of REM security and Sheridan Anderson site company man of Repsol. Mr. Bennett and Mr. Anderson stated the following in reference to the spills and site activities. "Stimulation is in progress on the 8H well. Zipper frac is also in progress with 5 wells completed.
Antifreeze spill happened on 2/22/17. Less than one gallon of it was spilled onto rig mats from a coolant hose on a truck. This sand truck finished blowing off sand and noticed the leak. It was immediately soaked up with absorbent material. The diesel fuel spill of approximately one gallon occurred on the lease road on 2/20/17. A heater unit was parked on a wooden mat straddling an E&S ditch. A fuel sheen was no |
2572425 | Primary Facility | 2017-03-06 | Incident- Response to Accident or Event | No Violations Noted | Frank Hoehle, DEP WQS and I arrived at the site at 11:30 in response to 2 separate spill incidents reported to the Department. We met with Sheridan Anderson, site company man, completions consultant of Repsol and Gordon Bennett, site safety man of REM security. Halliburton is the Repsol subcontractor conducting hydraulic fracturing operations. Mr. Anderson informed the Department he had reported both spills to Bob Bisignani, Assistant Emergency Response Coordinator of PADEP Northeast Regional Office Emergency Response Team on 3/5/17. The production fluid spill was reported to NERO at 7:45 AM on 3/6/17 and the motor oil spilled was reported at 10:28 PM on 3/5/17. Mr. Anderson and Mr. Bennett explained the following in reference to site activities and the spills. "Frac operations are in progress on the 6H well. Frac operations should be completed in about 2 weeks. The first spill occurred on Sunday morning 3/5/17 at approximately 3AM. 1/8 gallon of motor oil spilled to matting near tank battery. The d |
2587185 | Primary Facility | 2017-04-21 | Incident- Response to Accident or Event | No Violations Noted | I arrived at the site at 11:50 in response to a reported spill of (3) barrels of flowback fluid to secondary containment on 4/20/17. The weather conditions were mostly cloudy to partly sunny skies and breezy with temperatures in the 50's. I met with Rich Cashen, site company man, completions foreman of Repsol. Mr. Cashen and I discussed site activities and the spill incident in the company man trailer. Mr. Cashen stated the following." We are in the the process of drilling out frac plugs on the 12H well, and flowing back the 1H, 3H, 4H, 5H, 7H and 8H wells. There are (14) plugs left to be drilled out on this well. The wells currently in the flowback phase of operations are sending natural gas to the gathering pipeline on the pad to the sales line. The 2H, 6H, 10H and 11H wells are currently shut in. The 2H and 11H were in production and the 6H and 10H have not yet been flowed back. The 12H well is the last well where frac plugs will be drilled out. The spill occurred at 16:00 hours on 4/20/17. Flowback fl |
2596971 | Primary Facility | 2017-05-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:00a.m.
The cellar was full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and 100% methane with no measurable flow. There was 860psi on the production casing and 439psi on the production line. There was a crew on site picking up the containment from the recent drilling and stimulation activity. The 500bbl water tanks that were used during stimulation were still on site and on containment, the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:10p.m. |
2612570 | Primary Facility | 2017-06-20 | Routine/Complete Inspection | No Violations Noted | Arrived at the site at 12:30. The weather conditions were mostly sunny skies and breezy with temperatures in the low to mid 70's. I met with Rich Cashen, Completions Foreman and Dave Williams, Water Management Coordinator, both of Repsol and Andrew Senefelder, Staff Environmental Scientist of Golder Associates. Mr. Senefelder is in the process of performing a post hydraulic fracturing and completions assessment. Repsol is breaking down containment and cleaning up the site. The assessment consists of spraying distilled water on the pad surface and utilizing a soil conductivity meter immediately after spraying the water to obtain conductivity readings of the pad surface. The intent of the assessment according to Mr. Senefelder and Mr. Cashen is to evaluate the condition of the pad surface where the containment was set in place and others areas of the pad relevant to completions activities. The assessment will also determine if hydraulic fracturing flowback and/or production fluid impacted the pad surface via |
2622290 | Primary Facility | 2017-07-18 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:55. I was accompanied by Frank Hoehle, PADEP O&G WQS during the inspection. The weather conditions were sunny skies with a light breeze, very warm and humid with temperatures in the mid to upper 80's. There was no activity or personnel at the site. All wells at the location are in production. Secondary containment utilized for completions operations has been removed from the site. During the inspection the Department performed specific conductance (electrical conductivity) screening of water on the pad surface, in well cellars, the production fluid tanks containment structure, the gas production units containment structure and frac tank containment structure. There were no elevated conductivity readings of concern. All readings recorded were less than (600) micro Siemens/cm. We were not able to locate a post storm Erosion and Sedimentation inspection report in the mailbox on the access road near the pad entrance. The Department left the site at 13:46. |
2636564 | Primary Facility | 2017-09-06 | Incident- Response to Accident or Event | No Violations Noted | I arrived at the site at 12:54 in response to a reported spill incident of (2) gallons of diesel fuel and (4) gallons of transmission fluid. The weather conditions were cloudy skies, temperatures around 60 degrees, with calm winds. Rainfall has ended recently. I met with Steve Thompson, completions consultations of Repsol. Mr. Thompson stated the following in reference to site activities and the spill incident. "Currently, flowback of the Kropp 3H well is in progress. Over the course of the last week the 5H, 7H, and 9H wells were flowed back. The 1H, 10H and 12H are the next wells to be flowed back. The 2H, 4H, 6H and 8H are in all production. The wells on the Kropp pad were flooded out due to communication with some of the wells on the Repine pad during hydraulic fracturing (stimulation) there. Flowback is needed on this pad now due to the well communication issues. The spill happened on 9/6/17 at 00:40 hours, 12:40 AM. The spill occurred as a result of a vacuum truck hitting a cement block as the driver wa |
2640611 | Primary Facility | 2017-09-27 | Follow-up Inspection | No Violations Noted | On Sept 12,2017 Jon Sassi and I conducted an inspection of the Kropp well site. The man in charge on site representing Ensign was Jimmy White. There had been erosional issues and a spill on site previously. We were on site to conduct a follow up inspection for these issues. The acting company man for Ensign stated they were currently flowing back the 1h well. Jon took conductivity readings at various puddles around the site. Examples are as follows: .67 mS, 1.3, .30 in tank battery, .41, .67, .95, .5, .43, 1.7. Pad was dry during inspection. The flow back lines were not on containment but all appeared dry. 5mS in containment for gasbuster unit. There did not appear to be any anomalous readings on the pad surface of high conductivity at the time of inspection. There were some higher readings but all were in containment. A bucket had readings of 12 mS. Well cellars did not have any high conductivity readings. Some examples were .48mS, .91mS, .89mS, .99mS. Readings in production tank containment were 1.9 |
2651006 | Primary Facility | 2017-10-23 | Site Restoration | No Violations Noted | I inspected the Kropp well site for notice of termination (NOT) on October 23, 2017. There had previously been some stability issues following a significant rain event, on the fill slope. The issue has been resolved and is currently solid and stable. The vegetation surrounding the site was healthy and met or exceeded the department standard for perennial growth. The pad surface was solid as was the access road. During operations on site the pad had quite a considerable amount of mud on it but that was not in evidence during the inspection for NOT.
There were no violations I recommend APPROVAL of this NOT. |
2703579 | Primary Facility | 2018-03-08 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of water and there was no bubbling noticed. There was a 500bbl tank on containment and the containment appeared to be in good condition. The tank was connected to the bottom of the separators. I took a walk around the location and there were no obvious concerns noticed. |
2802765 | Primary Facility | 2018-11-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of water and over flowing onto the well site with a thin layer of ice and there was no bubbling noticed. There was no sheen noticed on the water and would suggest the cellar be emptied. The (20x13) and (13x9) annuli were below the water level. The (9x5) annulus was venting to the atmosphere. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted |
2852582 | Primary Facility | 2019-02-15 | Incident- Response to Accident or Event | No Violations Noted | I arrived at the site at 11:04 in response to a reported spill incident of (0.5) gallons of production fluid. The weather conditions are mostly cloudy skies and windy with temperatures around 40 degrees Fahrenheit. Chris Hartman, well tender of Repsol reported the spill incident to the Department. I contacted Mr. Hartman to obtain the details of the spill. See the reporting/releases section in this inspection report for additional details.
I met with Jeffrey Blanton, well tender of Repsol, and Christian Mondi, Environmental Data Systems of Resource Environmental, Montrose, PA. Mr. Blanton informed me the following regarding the spill incident. "Spill was discovered around 3 yesterday, 2-13-19. A hammer union on the flowline on the 3H well leaked. Not sure how long it was leaking. There are no reports of prior leaking. We used absorbent pads to mop up the spill. The well was shut in, and the thread on the hammer union was sealed. The well is back on-line now." Mr. Mondi provided me the following |