If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-115-21537 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.732964,"lon":-75.773822,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Brooklyn Township | |
| Operator Name: CABOT OIL & GAS CORP | |
| Well Pad ID: 150542 | |
| Farm/Lease Name: FOLTZ J 5 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2013-12-09 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.732964 | |
| Longitude: -75.773822 |
| Date | Event |
|---|---|
| 2013-12-09 | New Permit Application |
| 2014-01-29 | Performed Spud Operation |
| 2014-11-19 | Drilling Completion |
| 2015-01-23 | Perforation |
| 2015-03-27 | Performed Stimulation |
| 2015-08-17 | DEVIATED |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-03-26 | 2015-04-16 | 7,226 | 9,042,140 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Greenhib 679 | Chemplex | Friction Reducer | Proprietary | Proprietary | 35 | 0.00848963 | 7268.69 |
| Glycerine | 56-81-5 | 20 | 0.00485122 | 4153.54 | ||||
| Plexcide 15G | Chemplex | Biocide | Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.000646588 | 553.599 | |
| Alkyl Dimethyl Benzyl Ammonium Chloride | 68424-85-1 | 3 | 0.000646588 | 553.599 | ||||
| Ethanol | 64-17-5 | 3 | 0.000646588 | 553.599 | ||||
| Glutaraldehyde | 111-30-8 | 14 | 0.00301741 | 2583.46 | ||||
| Water | Rockwater | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.4507 | 75,730,200.0 | |
| Sand (Proppant) | TSS | Proppant | Silica Substrate | 14808-60-7 | 100 | 11.1037 | 9,506,800.0 | |
| Hydrochloric Acid (15%) | Reagent | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0465832 | 39883.8 | |
| Plexslick 957 | Chemplex | Friction Reducer | Paraffinic, Naphtehenic Solvent | 64742-47-8 | 30 | 0.0262216 | 22450.6 | |
| Ammonium Chloride | 12125-02-9 | 5 | 0.00437027 | 3741.76 | ||||
| Poly (acrylamide-co-acrylic acid), partial sodium salt | 62649-23-4 | 35 | 0.0305919 | 26192.3 | ||||
| Nonionic Surfactants | Proprietary | 1.5 | 0.00131108 | 1122.53 | ||||
| Chemplex 4-N-1 | Chemplex | Combination/Iron Control | thiourea-formaldehyde copolymer | 68527-49-1 | 2 | 0.00003629 | 31.074 | |
| Cocamide Diethanolamine Salt | 68603-42-9 | 2 | 0.00003629 | 31.074 | ||||
| Methyl Alcohol | 67-56-1 | 10 | 0.00018147 | 155.372 | ||||
| n-olefins | Proprietary | 1 | 0.00001815 | 15.537 | ||||
| 2-Ethylhexanol | 104-76-7 | 10 | 0.00018147 | 155.372 | ||||
| Propargyl Alcohol | 107-19-7 | 1 | 0.00001815 | 15.537 | ||||
| Diethanolamine | 111-42-2 | 2 | 0.00003629 | 31.074 | ||||
| Acetic Acid | 64-19-7 | 85 | 0.0015425 | 1320.66 | ||||
| Alcohol Ethoxylate Surfactants | Proprietary | 2 | 0.00003629 | 31.074 |
For data sources see[5]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2015-03-27 | 0 | 0 | 0 |
For data sources see[6]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2014 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | CABOT OIL & GAS CORP | 2,626,169.39 | 217 | 0.00 | 0 | 0.00 | 0 |
| 2016 | CABOT OIL & GAS CORP | 2,627,603.63 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | CABOT OIL & GAS CORP | 1,387,475.32 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | CABOT OIL & GAS CORP | 1,381,459.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | CABOT OIL & GAS CORP | 821,657.00 | 356 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2014 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 77.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
| 2014 | CABOT OIL & GAS CORP | Drill Cuttings | 1,599.19 Tons | LANDFILL | 101247 |
| 2014 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
| 2014 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 240.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
| 2015 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 107.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
| 2015 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 4.46 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
| 2015 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 7,670.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2015 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 13.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
| 2015 | CABOT OIL & GAS CORP | Produced Fluid | 8,600.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2016 | CABOT OIL & GAS CORP | Produced Fluid | 481.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2016 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 0.76 Tons | LANDFILL | 301358 |
| 2016 | CABOT OIL & GAS CORP | Produced Fluid | 728.19 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
| 2017 | CABOT OIL & GAS CORP | Produced Fluid | 511.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
| 2017 | CABOT OIL & GAS CORP | Produced Fluid | 10.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
| 2017 | CABOT OIL & GAS CORP | Produced Fluid | 305.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2018 | CABOT OIL & GAS CORP | Produced Fluid | 594.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2018 | CABOT OIL & GAS CORP | Produced Fluid | 210.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
| 2019 | CABOT OIL & GAS CORP | Produced Fluid | 451.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
| 2019 | CABOT OIL & GAS CORP | Produced Fluid | 48.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2240463 | Primary Facility | 2014-01-29 | Preoperation Inspection | No Violations Noted | |
| 2254516 | Primary Facility | 2014-03-18 | Drilling/Alteration | No Violations Noted | |
| 2322404 | Primary Facility | 2014-11-13 | Drilling/Alteration | No Violations Noted | |
| 2377440 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | No Violations Noted | |
| 2477992 | Primary Facility | 2016-04-25 | Routine/Complete Inspection | Pending | At time of inspection, arrived on site at 12:45 p.m., the cellar had water at the bottom with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 742psi on the production casing. I took a walk around the location and notice a numerous number of stains on the site. I contacted Andy Mehalko of Cabot Oil and Gas to have the stains checked out and contact the department with their plans. I also let DEP WQS Scott Kuchta know about the stains on the ground.
I left the site at 13:40 p.m. |
| 2531982 | Primary Facility | 2016-10-26 | Routine/Complete Inspection | No Violations Noted | Inspection of the Foltz J. P1 well pad in conjunction with the Maplewood Pipeline notice of termination inspection. No E&S issues observed on the pad at the time of the inspection. |
| 2631396 | Primary Facility | 2017-08-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. I took a walk around the location and there were no obvious concerns noticed. |
For data sources see[9]