Well ID: 37-115-21754 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.655547,"lon":-75.960569,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149374 | |
Farm/Lease Name: STONE UNIT | |
License Status: INACTIVE | |
Spud Date: 2014-09-23 | |
Permit Date: 2014-05-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.655547 | |
Longitude: -75.960569 |
Date | Event |
---|---|
NEWLY DRILLED | |
2014-05-09 | New Permit Application |
2014-09-08 | Performed Spud Operation |
2014-11-02 | Drilling Completion |
2016-05-09 | Inactive Well Request Granted |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 396.56 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,357.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Drill Cuttings | 631.70 Tons | LANDFILL | 100933 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2317988 | Primary Facility | 2014-10-28 | Drilling/Alteration | No Violations Noted | |
2441789 | Primary Facility | 2016-01-19 | Routine/Complete Inspection | No Violations Noted | Inspection of the Stone Unit Pad for current or potential E&S issues due to a recent drilling permit application for the #3H well. The site is less than 5 acres. The site is stable, vegetation coverage around the pad and access is stable, and no erosion issues were observed. The PCMS controls appear to be installed according to the 2010 E&S and restoration plans. They basically consist of a drainage channel around the pad that drains on both sides to a sediment basin and appear to be functioning properly. The access road is in good condition and the PCSMs (drainage channel and culverts, and etc) are in place according to the plans referenced above with no apparent problems. |
2471244 | Primary Facility | 2016-04-05 | Drilling/Alteration | No Violations Noted | |
2471813 | Primary Facility | 2016-04-05 | Drilling/Alteration | No Violations Noted | |
2485163 | Primary Facility | 2016-05-11 | Routine/Complete Inspection | No Violations Noted | |
2491277 | Primary Facility | 2016-06-02 | Follow-up Inspection | No Violations Noted | I conducted an inspection of the site accompanied by Scott Kuchta, DEP O&G WQS. A coiled tubing unit is on the location. Shortly after our arrival at 10:30, wet met with Gilbert Blevins, site company man, consultant of Chief. Mr. Blevins stated the following information. "We just finished drilling out frac plugs on the 3H well. We started to drill out the plugs yesterday. There were (12) frac plugs drilled out. The plugs were drilled out at a rate of (15) barrels an hour, (3) barrels in 3.25 hours. The Rain for Rent frac tanks contain water from the frac plug drill out process and water used during the frac. The frac job was completed last week. All of the wells are currently shut in."
Chief submitted a stimulation notification to the Department on 5-18-16. The notification indicated stimulation of the Stone Unit 3H would commence on 5/24/16 at 6:00 AM. According to our records, there are (8) wells drilled on the pad. The 2H, 1V, 5H and 4H wells were in production. The 6H, 7H and 8H have been |