37-115-21897

Well Details

Well ID: 37-115-21897
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Oakland Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 150903
Farm/Lease Name: OAK RIDGE NORTH 2H
License Status:
Spud Date:
Permit Date: 2014-10-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.975447
Longitude: -75.642372

For data sources see[1][2][3]

Well History

Date Event
2014-10-29 New Permit Application
2015-05-26 Performed Spud Operation
2015-07-06 Drilling Completion
2015-08-22 Perforation
2015-08-22 Performed Stimulation
2015-10-23 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-22 2015-08-30 5,918 8,475,940 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Operator Carrier Water 7732-18-5 100 81.7156 70,670,700.0
HCl, 10.1 - 15% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.647691 559847
MaxPerm-20A, 265 gallon tote Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0670184 57928.9
Ingredients in Additive(s) (MSDS and non-MSDS) Baker Hughes See Trade Name(s) List Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.001806 1561.88
Tar Bases, Quinoline Derivs., Benzyl Chloride-Quaternized 72480-70-7 30 0.0003893 336.72
Quaternary Ammonium Compound 68424-85-1 5 0.0009679 837.058
Sulfurized polyolefin 68037-13-8 5 0.00006490 56.12
Potassium Acetate 127-08-2 0.5 0.00000650 5.612
Polyoxyethylene sorbitan monooleate 9005-65-6 5 0.0033491 2896.45
Sodium Chloride 7647-14-5 5 0.0035189 3043.29
Water 7732-18-5 85 0.612084 529353
Formic Acid 64-18-6 30 0.0003893 336.72
Oxyalkylated Fatty Acid 61791-002 40 0.0005191 448.96
Oxyalkylated alcohol 78330-21-9 5 0.0033491 2896.45
Ethylene Glycol 107-21-1 45 0.0076408 6608.04
Aldehyde 104-55-2 30 0.0003893 336.72
Hydrotreated Light Distillate 64742-47-8 30 0.0200947 17378.7
Hydrochloric Acid 7647-01-0 15 0.0971016 83977
Citric Acid 77-92-9 60 0.0026676 2307.04
Ethanol 64-17-5 5 0.000903 780.938
Isopropanol 67-63-0 5 0.00006490 56.12
Potassium Iodide 7681-11-0 2 0.00002600 22.448
Glutaraldehyde 111-30-8 30 0.0054179 4685.63
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt 71050-62-9 20 0.0033959 2936.91
Polyaklylene 7756-94-7 1 0.00001300 11.224
Calcium Chloride 10043-52-4 5 0.000849 734.227
Potassium Chloride 7447-40-7 1 0.0001698 146.845
Crystalline Silica (Quartz) 14808-60-7 100 17.4757 15,113,600.0
1-Propanesulfonic acid, 2-methyl-2-[(1-oxo-2-propen-1-yl)amino]-,
polymer with 2-propenamide, sodium salt
83446-68-8 60 0.0401895 34757.3
Sorbitan, mono-(9Z)-9-octadecenoate 1338-43-8 5 0.0033491 2896.45
Sand, White, 100 mesh Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 8.7576 7,569,840.0
Scaletrol 720 Baker Hughes Scale Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0169886 14684.5
CI-39 Baker Hughes Corrosion Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0012985 1122.4
Alpha 1427 Baker Hughes Biocide MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0180694 15618.8
Ferrotrol 300L Baker Hughes Iron Control MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0044484 3845.06
Sand, White, 30/50 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 8.72744 7,543,770.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-22 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SWN PROD CO LLC 497,803.00 106 0.00 0 0.00 0
2016 SWN PROD CO LLC 1,355,742.00 365 0.00 0 0.00 0
2017 SWN PROD CO LLC 854,752.00 362 0.00 0 0.00 0
2018 SWN PROD CO LLC 681,692.00 363 0.00 0 0.00 0
2019 SWN PROD CO LLC 590,664.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SWN PROD CO LLC Fracing Fluid Waste 58.00 Bbl LANDFILL THR029
2015 SWN PROD CO LLC Drill Cuttings 1,074.50 Tons LANDFILL 101247
2015 SWN PROD CO LLC Produced Fluid 13,640.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWN PROD CO LLC Drilling Fluid Waste 1,202.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Soil Contaminated by Oil 19.00 Tons LANDFILL THR029
2016 SWN PROD CO LLC Synthetic Liner Materials 4.00 Tons LANDFILL 101247
2016 SWN PROD CO LLC Other Oil & Gas Wastes 125.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 10,701.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Soil Contaminated by Oil & Gas Related Spills 19.00 Tons LANDFILL THR029
2017 SWN PROD CO LLC Other Oil & Gas Wastes 92.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 6,022.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 819.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 SWN PROD CO LLC Produced Fluid 3,748.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 775.00 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 990.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 350.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 945.00 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Produced Fluid 125.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Other Oil & Gas Wastes 28.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 1,925.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2373848 Primary Facility 2015-05-28 Drilling/Alteration No Violations Noted
2377282 Primary Facility 2015-06-09 Drilling/Alteration No Violations Noted
2380094 Primary Facility 2015-04-29 Preoperation Inspection No Violations Noted On 4/29/15, the Department was on site at the SWN NR 18 Oak Ridge Well Pad to conduct a Preoperational Inspection. Inspection conducted with Rich Gulyas, SWN Construction Foreman. The well permits that have been issued for this pad are the Oak Ridge North 2H(115-21897), and the NE 3H(115-21675). All perimeter BMP’s in place to include red lined additions. Pad is 95% complete. No violations noted.
2380497 Primary Facility 2015-06-11 Routine/Complete Inspection No Violations Noted Falcon Drilling Rig #25 is currently drilling the Oak Ridge 2H well @ (1,647) feet. It appears as if cement overtopped the cement tank and spilled onto containment and compromised liner integrity is noticed in the containment near (2) diesel fuel tanks. The containment in this particular area consists of a layer of felt above a (40) mil HDPE Western liner, and a layer of felt below the liner. The pad surface is revealed below the tears in the felt and the liner. Mr. Fooshee stated that he would have the area cleaned up where the cement was spilled to containment and the tears in the containment will be repaired.
2387275 Primary Facility 2015-07-14 Routine/Complete Inspection No Violations Noted
2402876 Primary Facility 2015-08-27 Incident- Response to Accident or Event Viol(s) Noted & Immediately Corrected Mike Williams of Southwestern Energy contacted the PADEP Northeast Regional Office Emergency Response Team at 9:29 PM on 8/25/15 to report an estimated (20) gallon diesel fuel release that occurred and impacted the access road on 8/25/15 around 8:45 PM. Hydraulic fracturing operations were in progress on the Oak Ridge Pad when the release occurred. The release occurred due to a sand track shearing the fuel line connecting the fuel tanks on the truck as the truck was travelling up the access road approaching the pad. In order to stop the leaking diesel fuel from the truck and control the release, the remaining diesel fuel in the truck was unloaded into nearby water trucks, drip pans were placed under the truck and absorbent pads were utilized to soak up the diesel fuel on the ground surface.
2405588 Primary Facility 2015-09-08 Complaint Inspection No Violations Noted
2406290 Primary Facility 2015-09-11 Incident- Response to Accident or Event No Violations Noted On 8/24/15, the Department conducted an inspection of the SWN NR 18 Oak Ridge Well Pad in response to their self-reporting of a small spill of fresh water to containment. Present during the inspection was Ryan Klemish, SWN Regulatory Analyst. The spill occurred during stimulation activities on the pad. The spill occurred when a valve was not fully closed and caused a frac tank to overflow. A review of the containment revealed that the containment looked sound with no tears or punctures present. The water was immediately vacuumed up. No further action is required of SWN at this time.
2423981 Primary Facility 2015-11-10 Routine/Complete Inspection No Violations Noted
2425346 Primary Facility 2015-11-17 Routine/Complete Inspection No Violations Noted
2431304 Primary Facility 2015-12-07 Routine/Complete Inspection No Violations Noted
2465606 Primary Facility 2016-03-17 Routine/Complete Inspection No Violations Noted
2474822 Primary Facility 2016-04-14 Routine/Complete Inspection No Violations Noted
2484758 Primary Facility 2016-05-17 Routine/Complete Inspection No Violations Noted
2491654 Primary Facility 2016-06-06 Routine/Partial Inspection No Violations Noted The Department was on site at the Oak Ridge Well Site located at 712 Four Star Pass Oakland Township, Susquehanna County to conduct a Routine Partial Inspection. At the time of the inspection, it was noted that SRT signed off on an E&S inspection on 6/6/16. The Department walked the well site to survey the temporary stabilization. Some of the vegetation on the cut slope appears to be dead. This area should be monitored to ensure that potential erosion issues do not occur once the dead vegetation decays. Also, a small area near the tree line appeared to be recently mulched.
2495482 Primary Facility 2016-06-23 Routine/Complete Inspection No Violations Noted
2563262 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted Last inspection 2/16/2017. The NR18 1H is not in production but the 2H is. The access road to this site is long but in good shape, despite recent snowmelt and warm weather. The cut and fill slope are vegetated and stable and the pad surface is graded well. The area has some snowcover but vegetation is visible. There are no apparent erosion issues at this time.

There are no violations

If there are any questions contact me at 570-346-5539

2575181 Primary Facility 2017-03-24 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:30a.m.

The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was water and ice above the surface casing with no bubbling noticed. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 606psi on the production casing and 307psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 10:05a.m.

2668282 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. The (20x13) and (13x9) annuli were below the water level and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2768228 Primary Facility 2018-08-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water 3' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2815391 Primary Facility 2018-12-13 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Only one of the 2 wells drilled on this pad, the 2H is in production. No E&S issues identified. Good vegetative stabilization present. No violations present.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2402876 733497 08/27/2015 2015-08-27 CSL 402(b) - POTENTIAL POLLUTION - Conducting an activity regulated by a permit issued pursuant to Section 402 of The Clean Streams Law to prevent the potential of pollution to waters of the Commonwealth without a permit or contrary to a permit issue Environmental Health & Safety
2402876 733498 08/27/2015 2015-08-27 78.56(a) - PITS AND TANKS FOR TEMPORARY CONTAINMENT - Operator failed to contain pollutional substances and wastes from the drilling, altering, completing, recompleting, servicing and plugging the well, including brines, drill cuttings, drilling muds Environmental Health & Safety
2402876 733499 08/27/2015 2015-08-27 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety

For data sources see[9]