37-115-21929

Well Details

Well ID: 37-115-21929
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: New Milford Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 149945
Farm/Lease Name: TONYA WEST 2H
License Status: Active
Spud Date: 2015-02-07
Permit Date: 2015-01-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.907678
Longitude: -75.662753

For data sources see[1][2][3]

Well History

Date Event
2015-01-15 New Permit Application
2015-02-04 Performed Spud Operation
2015-07-11 Drilling Completion
2015-10-21 Perforation
2015-10-21 Performed Stage 1 of Stimulation
2015-10-21 Performed Stage 2 of Stimulation
2015-10-21 Performed Stage 3 of Stimulation
2015-10-21 Performed Stimulation
2015-10-22 Perforation
2015-10-22 Performed Stage 4 of Stimulation
2015-10-22 Performed Stage 5 of Stimulation
2015-10-22 Performed Stage 6 of Stimulation
2015-10-23 Perforation
2015-10-23 Performed Stage 7 of Stimulation
2015-10-23 Performed Stage 8 of Stimulation
2015-10-23 Performed Stage 9 of Stimulation
2015-10-24 Perforation
2015-10-24 Performed Stage 10 of Stimulation
2015-10-24 Performed Stage 11 of Stimulation
2015-10-24 Performed Stage 12 of Stimulation
2015-10-24 Performed Stage 13 of Stimulation
2015-10-25 Perforation
2015-10-25 Performed Stage 14 of Stimulation
2015-10-25 Performed Stage 15 of Stimulation
2015-11-23 Perforation
2015-12-18 NEWLY DRILLED
2017-01-18 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-21 2015-10-25 6,042 8,831,880 61,801

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
BE-9, HAI-150E, LP-65 MC, PermVis
VFR-10, SAND-COMMON WHITE-100
MESH, SSA-2, SAND-PREMIUM WHITE-30/50
Halliburton Biocide, Corrosion Inhibitor, Friction Reducer, Proppant, Scale Inhibitor NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients Inorganic salt Confidential 30 0.0292801 26460
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) 93-83-4 5 0.00488002 4410
Fatty acid ester Confidential 5 0.00488002 4410
Hydrotreated light petroleum distillate 64742-47-8 30 0.0292801 26460
Hydrochloric acid 7647-01-0 15 0.0917933 82949
Crystalline silica, quartz 14808-60-7 100 17.8338 16,115,500.0
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00197175 1782
Water 7732-18-5 100 0.660953 597272
Organic phosphonate Proprietary 60 0.013912 12572
Polyacrylate Confidential 30 0.0292801 26460
Ammonium chloride 12125-02-9 30 0.0167167 15106
Alcohols, C12-16, ethoxylated 68551-12-2 10 0.00976005 8820
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 81.4135 73,569,400.0
HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-10-21 1 SAND 9,048,984 8,276 5,692
2015-10-21 2 SAND 9,048,984 8,353 5,903
2015-10-21 3 SAND 9,048,984 8,206 4,406
2015-10-22 4 SAND 9,048,984 8,335 5,084
2015-10-22 5 SAND 9,048,984 8,272 5,877
2015-10-22 6 SAND 9,048,984 8,192 4,527
2015-10-23 7 SAND 9,048,984 8,352 6,199
2015-10-23 8 SAND 9,048,984 8,279 4,995
2015-10-23 9 SAND 9,048,984 8,135 5,732
2015-10-24 10 SAND 9,048,984 8,179 5,770
2015-10-24 11 SAND 9,048,984 8,304 5,968
2015-10-24 12 SAND 9,048,984 8,083 5,744
2015-10-24 13 SAND 9,048,984 8,008 5,970
2015-10-25 14 SAND 9,048,984 8,193 6,479
2015-10-25 15 SAND 9,048,984 8,019 6,186

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SWN PROD CO LLC 107,546.00 31 0.00 0 0.00 0
2016 SWN PROD CO LLC 1,587,694.00 366 0.00 0 0.00 0
2017 SWN PROD CO LLC 1,259,518.00 364 0.00 0 0.00 0
2018 SWN PROD CO LLC 893,488.00 365 0.00 0 0.00 0
2019 SWN PROD CO LLC 817,802.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SWN PROD CO LLC Fracing Fluid Waste 112.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWN PROD CO LLC Fracing Fluid Waste 68.00 Bbl LANDFILL THR029
2015 SWN PROD CO LLC Drill Cuttings 1,470.00 Tons LANDFILL 101247
2015 SWN PROD CO LLC Produced Fluid 11,278.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Other Oil & Gas Wastes 31.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 13,007.05 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Other Oil & Gas Wastes 10.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 6,505.40 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 1,627.40 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 503.40 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 294.80 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 109.52 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 309.20 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Other Oil & Gas Wastes 31.23 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 891.60 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2345872 Primary Facility 2015-02-11 Routine/Complete Inspection No Violations Noted Falcon Drilling Rig #25 was in the process of moving to the location during the inspection. We met with Rudy Holtzclaw, company man of SWN Energy. Mr. Holtzclaw stated that drilling will most likely commence tomorrow, 2/12/15. The 2H-5H wells have been spudded and will be drilled to kickoff point with Falcon Rig #25. The surface and intermediate casing of these wells will be cemented. Most likely a Precision Drilling Rig will mobilize to the site at a date to be determined to re-enter the wells to drill from kickoff point to total depth. The 6H well is in the production phase of operations. There are (2) heating units staged on the pad surface near the production fluid tank containment. Mr. Holtzclaw claimed the tanks did not contain any diesel fuel and the tanks will be placed on containment upon filling with fuel.
2374368 Primary Facility 2015-05-29 Routine/Complete Inspection No Violations Noted
2404912 Primary Facility 2015-09-03 Routine/Complete Inspection No Violations Noted
2417536 Primary Facility 2015-10-21 Complaint Inspection No Violations Noted
2418225 Primary Facility 2015-10-20 Complaint Inspection Pending On-site, Mr. Klemish and I met with Dave Singer, SWN Completions Foreman overseeing Halliburton’s hydraulic fracturing operations. Hallibuton is in the process of fracking 4 wells, the 2H, 3H, 4H, and 5H. The inspection revealed that the “dust” in question was actually frac sand that was becoming air borne as it was off loaded to proppant storage tanks. The Halliburton team working this part of the operation stated that they were having issues with their filtration system and that they had additional components in route and that they were actively trying to fine tune the operation. The airborne frac sand appeared to be coming from multiple locations of this operation. The “dust” on-site became irritating to me near the off-loading area which caused me to move back to the completion foreman’s trailer. At that time, I stated that fugitive emissions off-site of an operation were a violation of the Department’s Air Resources regulations.
2422909 Primary Facility 2015-10-26 Routine/Complete Inspection No Violations Noted Inspection conducted on 10/26/15 of the Tonya West Pad as a follow-up inspection to an ongoing dust complaint related to the sand off loading at the site as part of the hydraulic fracturing activities. Present during the inspection was Joe Gaboff, Department OGI. The dust issues that are related to the off-loading of the frac sand were not observed during the inspection. Joe Gaboff believes that the sand capture system must not be working efficiently as evidenced by the amount of filled tote bags present near the off-loading site. It appears as if the filtration system must be very labor intensive, again as evidenced by the high volume of frac sand being collected. There are no longer any hatches left open. The Department will continue to conduct intensive investigations to ensure that the short cuts observed during the initial investigation of this site do not resume.
2422943 Primary Facility 2015-11-05 Routine/Complete Inspection No Violations Noted Inspection conducted on 11/5/15 of the Tonya West Pad as a follow-up inspection to an ongoing dust complaint related to the sand off loading at the site as part of the hydraulic fracturing activities. The hydraulic fracturing activities have been completed. The frac sand off-loading dust suppression system has been removed. The containment is still in place. A high volume of waste sand is still present on the containment. Coil tubing activities taking place during the inspection. No violations noted. Please remove the waste sand that is present in order to avoid natural causes, i.e. wind from mobilizing the sand.
2425076 Primary Facility 2015-11-16 Routine/Complete Inspection No Violations Noted During the inspection, Ryan Klemish, SWN Regulatory Analyst and Dan Jones, Acting Regulatory Analyst arrived on-site. Mr. Klemish also metered this location with a pen meter and recorded a reading of 3 milliSiemens/cm³. The Department was able to collect a small sample of this water and is having it analyzed for the metal analytes of the Department’s 946 suite. The second puddle in question had an elevated reading of 6 milliSiemens/cm³. This puddle is located right off containment in front of the well heads on the entrance side. The Department spoke to Mike Deming, Senior Regulatory Analyst by phone about the puddles in question. Mr. Deming agreed to have a consultant evaluate both locations.
2426681 Primary Facility 2015-11-19 Routine/Complete Inspection No Violations Noted Mr. Deming stated he would work on getting the pump system up and running ASAP. As always, please be prepared to provide the Department with a detailed report of your field screenings as had been conducted on the hot spot near the well heads. Mr. Deming stated that there is a possibility that dust suppression activities conducted in response to a dust complaint on the access road may be contributing to the elevated conductivity readings. He is going to attempt to contact the contractor and get a sample of the pure product that was used on the access road.
2432482 Primary Facility 2015-12-14 Administrative/File Review No Violations Noted A review of the Department collected sample results as illustrated in the attached Table 1, reveal that a spill has occurred at the well site, and it is recommended that SWN should conduct characterization and remediation of the site.
2434940 Primary Facility 2015-12-18 Follow-up Inspection No Violations Noted Standing water in the GPU containment was measured at 4 milliSiemen/cm³. The containment is new and appears to be sound. While the Department was on-site and preparing to leave, a well tender arrived on-site and began sampling from the sand trap observation valve. The tender went to each valve, opened the valve and filled a clear quart jar. After observing the contents, the tender dumped the contents of the jar on the ground of the GPU containment (photograph 1). This is probably the reason for the elevated conductivity observed. This does not appear to be a good practice, especially when not all well pads have new containment, if any, as had been pointed out on the Charles Pad, where no containment exists(photograph 2).
2448180 Primary Facility 2016-02-09 Routine/Complete Inspection No Violations Noted
2462324 Primary Facility 2016-03-04 Routine/Complete Inspection No Violations Noted
2471414 Primary Facility 2016-04-05 Routine/Complete Inspection No Violations Noted
2493581 Primary Facility 2016-06-13 Routine/Partial Inspection No Violations Noted The Department was on site at the Tony West (#12 Pad) to conduct a Routine Partial Inspection. At the time of the inspection, the E&S Inspection Log indicated that Klemish conducted an inspection on 6/13 and that there was no attention needed at that time. The E&S Plan map had several redlines. It was noted that the filter sock had been removed and that there were several additional topsoil stockpiles added to the site due to an excessive amount of topsoil present. The well site appeared to meet temporary stabilization requirements during the Department’s inspection.

The Department noticed that there was rust colored staining running down the production tank. The dried fluid appeared to have originated from the thief hatch on the tank. The Department requests that the operator investigate this and report back to the Department with your findings within 3 days of receipt of this report.

2493598 Primary Facility 2016-06-16 Routine/Complete Inspection No Violations Noted
2540383 Primary Facility 2016-12-01 Site Restoration No Violations Noted The Department conducted a Restoration Inspection in response to the submittal of a Notice of Termination (NOT). The Department noted that the PCSM BMP did not appear to be reflective of your Site Restoration Plan. The Department spoke with Justin Thomas (SWN) concerning this and suggested that you make any repairs needed and to please contact the Department, when they have been completed, to conduct a Follow-Up Inspection. The result of the NOT is pending the Follow-Up Inspection.
2557655 Primary Facility 2017-01-03 Administrative/File Review No Violations Noted I recommend that this NOT be returned.
2565975 Primary Facility 2017-02-28 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:30p.m.

The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was water above the surface casing with no bubbling noticed. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, there was also a 1000psi pressure gauge with 0psi on it, the valve going to the production tank was closed. There was 808psi on the production casing and 408psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:20p.m.

2660566 Primary Facility 2017-11-15 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2762155 Primary Facility 2018-08-09 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water .5' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]