37-115-22008

Well Details

Well ID: 37-115-22008
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Oakland Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 151947
Farm/Lease Name: WALKER DIEHL NORTH 1H
License Status:
Spud Date:
Permit Date: 2015-06-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.969297
Longitude: -75.622211

For data sources see[1][2][3]

Well History

Date Event
2015-06-17 New Permit Application
2015-08-15 Performed Spud Operation
2015-09-23 Drilling Completion
2015-10-27 Perforation
2015-10-27 Performed Stimulation
2016-01-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-27 2015-11-01 6,029 7,242,060 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-39 Baker Hughes Corrosion Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0015414 1150
Sand, White, 30/50 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 9.16302 6,836,460.0
Alpha 1427 Baker Hughes Biocide MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0123142 9187.5
Sand, White, 100 mesh Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 9.06091 6,760,280.0
Ingredients in Additive(s) (MSDS and non-MSDS) Baker Hughes See Trade Name(s) List Isopropanol 67-63-0 5 0.00007700 57.5
Potassium Acetate 127-08-2 0.5 0.00000770 5.75
Tar Bases, Quinoline Derivs., Benzyl Chloride-Quaternized 72480-70-7 30 0.0004622 345
1-Propanesulfonic acid, 2-methyl-2-[(1-oxo-2-propen-1-yl)amino]-,
polymer with 2-propenamide, sodium salt
83446-68-8 60 0.036177 27004.3
Ethanol 64-17-5 5 0.0006154 459.375
Oxyalkylated Fatty Acid 61791-002 40 0.0006163 460
Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.0012308 918.75
Calcium Chloride 10043-52-4 5 0.0007138 532.81
Polyaklylene 7756-94-7 1 0.00001540 11.5
Hydrotreated Light Distillate 64742-47-8 30 0.0180885 13502.2
Citric Acid 77-92-9 60 0.003116 2325.95
Glutaraldehyde 111-30-8 30 0.0036925 2756.25
Potassium Chloride 7447-40-7 1 0.0001428 106.562
Sorbitan, mono-(9Z)-9-octadecenoate 1338-43-8 5 0.0030147 2250.36
Polyoxyethylene sorbitan monooleate 9005-65-6 5 0.0030147 2250.36
Hydrochloric Acid 7647-01-0 15 0.11248 83960.5
Water 7732-18-5 85 0.690805 515651
Sodium Chloride 7647-14-5 5 0.0031575 2356.92
Potassium Iodide 7681-11-0 2 0.00003080 23
Formic Acid 64-18-6 30 0.0004622 345
Ethylene Glycol 107-21-1 45 0.0064241 4795.29
Crystalline Silica (Quartz) 14808-60-7 100 18.2152 13,596,700.0
Aldehyde 104-55-2 30 0.0004622 345
Sulfurized polyolefin 68037-13-8 5 0.00007700 57.5
Oxyalkylated alcohol 78330-21-9 5 0.0030147 2250.36
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt 71050-62-9 20 0.0028552 2131.24
Quaternary Ammonium Compound 68424-85-1 5 0.0006924 516.875
Ferrotrol 300L Baker Hughes Iron Control MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0051958 3876.58
Scaletrol 720 Baker Hughes Scale Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0142826 10656.2
Water Operator Carrier Water 7732-18-5 100 80.8934 60,382,800.0
HCl, 10.1 - 15% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.750224 559737
MaxPerm-20A, 265 gallon tote Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0603239 45007.2

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-10-27 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SWN PROD CO LLC 225,029.00 38 0.00 0 0.00 0
2016 SWN PROD CO LLC 1,341,440.00 364 0.00 0 0.00 0
2017 SWN PROD CO LLC 833,423.00 362 0.00 0 0.00 0
2018 SWN PROD CO LLC 646,153.00 363 0.00 0 0.00 0
2019 SWN PROD CO LLC 547,594.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SWN PROD CO LLC Fracing Fluid Waste 102.50 Bbl LANDFILL THR029
2015 SWN PROD CO LLC Drill Cuttings 1,195.00 Tons LANDFILL 101247
2015 SWN PROD CO LLC Produced Fluid 18,275.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Other Oil & Gas Wastes 60.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Produced Fluid 7,901.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Fracturing Fluid Waste 20.00 Tons LANDFILL THR029
2017 SWN PROD CO LLC Produced Fluid 5,040.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Other Oil & Gas Wastes 74.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 695.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 SWN PROD CO LLC Produced Fluid 1,551.50 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 330.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 165.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Produced Fluid 445.50 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Produced Fluid 232.00 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Other Oil & Gas Wastes 14.25 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 1,018.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2397648 Primary Facility 2015-08-11 Preoperation Inspection No Violations Noted On 8/11/15, the Department was on site at the SWN NR 19 Walker Diehl Well Pad to conduct a Preoperational Inspection. Inspection conducted with Rich Gulyas, SWN Construction Foreman, Andy Breese, SWN Construction Foreman, and Ryan Klemish, Regulatory Analyst. The well permits that have been issued for this pad are the Walker Diehl N 1H (115-22008), the N 4H (115-21882), and the S 5H (115-22009). All perimeter BMP’s in place to include red lined additions. Pad is 100% complete. No violations noted.
2400973 Primary Facility 2015-08-21 Drilling/Alteration No Violations Noted
2401614 Primary Facility 2015-08-25 Drilling/Alteration No Violations Noted
2409339 Primary Facility 2015-09-22 Drilling/Alteration No Violations Noted
2412663 Primary Facility 2015-09-14 Drilling/Alteration No Violations Noted Heavy equipment on location mobilizing rig. SDC 44 to resume drilling on the Walker Diehl North 1H at approx 2000 hours on 9/15
2446902 Primary Facility 2016-02-03 Routine/Complete Inspection No Violations Noted
2470053 Primary Facility 2016-03-31 Routine/Complete Inspection No Violations Noted
2474825 Primary Facility 2016-04-14 Routine/Complete Inspection No Violations Noted
2479224 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Department representatives Frank Hoehle, WQS and Andrea Mullen, LPG were on site on 4/19/2016 to conduct a routine complete inspection of the Walker Diehl Well Pad (ESX29-115-14-0067). The site was last inspected by the company on 4/18/2016.

The wells associated with this site are as follows: 115-22008 115-21882 115-21888 115-22009

The site had some slippage along the access road leading in near the following GPS coordinate: 41deg. 58' 15" 75deg 37' 23". (Photos 1 and 2)

The site also had poor vegetative growth in the vicinity of coordinates: 41deg. 58' 13.8" 75deg. 37' 20.1". The poor vegetative growth could possibly be due to too much organic matter being incorporated into the soil from tree clearing operations, resulting in a tie up of the nitrogen necessary for proper germination. (Photos 3 and 4)

The sediment trap near coordinates 41deg. 58' 12.9" 75deg. 37' 21.8" is laden with sediment, most likely due to the poor vegetative growth directly uphill from the trap. (Photo 5)

If

2484783 Primary Facility 2016-05-17 Routine/Complete Inspection No Violations Noted
2491698 Primary Facility 2016-06-06 Routine/Partial Inspection No Violations Noted The Department was on site at the Walker Diehl Well Site to conduct a Routine Partial Inspection. At the time of the inspection, the Department noted that the E&S Plan was on site and the E&S Inspection Log indicated that SRT conducted their most recent inspection on 6/6/16. The Department walked the site to verify if the recent efforts to bring the site back into compliance have worked. The Department noted a large mulch pile on the well site. Also, the site does not meet temporary stabilization requirements. During the Department’s inspection, there were large areas that had very little to no vegetation at all. The Department requests that the operator survey these areas and deploy a method of temporary stabilization consistent with your E&S Plan within 3 business days of receipt.
2495480 Primary Facility 2016-06-23 Routine/Complete Inspection No Violations Noted
2505976 Primary Facility 2016-07-26 Routine/Complete Inspection No Violations Noted
2526635 Primary Facility 2016-09-26 Follow-up Inspection No Violations Noted

The Department was on site to conduct a Follow-Up Inspection of the Walker Diehl Well Site. On 6/21/16 the Department received an email from Afton Sterling (Regulatory Supervisor-SWN) concerning stabilization efforts at the NR 19- Walker Diehl Well Site. The email explained that they worked on the site that day seeding, fertilizing, and applying hay/mulch and that they will be bringing an additional 10 bales of hay and two bags of fertilizer for application the following day.

During this Follow-Up Inspection, it was noted that the well site appeared to meet temporary stabilization requirements. Areas that did not have vegetative growth consisted of mainly rock. There was a small area on the cut slope adjacent to the rock filter that could use some additional measures to acquire stabilization. There is still a large mulch pile on site. Lastly, the catch basin at the cross culvert outlet was full of water that was clear (not sediment laden as it was during the previous inspection).

2564076 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted Site mostly snow covered. The repairs cited in a previous inspection had been addressed and are holding up well, with visible vegetation through snow cover. The cut slope of the well pad has areas of low vegetation however this seems to be due to a local lack of good topsoil and rocky conditions. The access road is well graded and had no erosion or washouts along its length. There are no apparent erosional issues currently.

There are no violations

If there are any issues feel free to contact me at 570 346-5539

2570654 Primary Facility 2017-03-09 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:35p.m.

The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was water above the surface casing with no bubbling noticed. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge and a 1000psi pressure gauge with about 265psi on it, the valve going to the production tank was closed. There was 608psi on the production casing and 313psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:50p.m.

2665816 Primary Facility 2017-11-30 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. The (20x13) and (13x9) annuli were below the water level and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2765665 Primary Facility 2018-08-21 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water .5' below grade in the cellar and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2828191 Primary Facility 2019-01-14 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[9]