Well Details

Well ID: 37-115-22123
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: New Milford Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 153291
Farm/Lease Name: CONKLIN EAST 1H
License Status:
Spud Date: 2016-07-21
Permit Date: 2015-12-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.838397
Longitude: -75.6939

For data sources see[1][2][3]

Well History

Date Event
Deviated
2015-12-09 New Permit Application
2016-07-21 Performed Spud Operation
2016-10-14 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-13 2016-12-22 6,839 7,718,020 154,120

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ingredients Listed Above Listed Above Water 7732-18-5 100 2.13028 1,591,090.0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 86.1812 64,368,100.0
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
LP-65 MC Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
HAI-150E Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
Inorganic salt Proprietary 30 0.0225251 16824
Hydrochloric acid 7647-01-0 15 0.30395 227019
Acrylamide acrylate copolymer Proprietary 30 0.0225251 16824
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00405657 3030
Diammonium phosphate 7783-28-0 5 0.00152693 1141
Ammonium chloride 12125-02-9 30 0.0091616 6843
Hydrotreated light petroleum distillate 64742-47-8 30 0.0225251 16824
Organic phosphonate Proprietary 60 0.0183232 13686
Propylene glycol 57-55-6 60 0.0243394 18179
Crystalline silica, quartz 14808-60-7 100 11.6461 8,698,400.0
BE-9W Halliburton Biocide Listed Below Listed Below 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0
2017 SWN PROD CO LLC 2,834,611.00 312 0.00 0 0.00 0
2018 SWN PROD CO LLC 1,356,578.00 352 0.00 0 0.00 0
2019 SWN PROD CO LLC 952,571.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 SWN PROD CO LLC Soil Contaminated by Oil 14.58 Tons LANDFILL 101247
2016 SWN PROD CO LLC Servicing Fluid 15.80 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Drilling Fluid Waste 1,187.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Other Oil & Gas Wastes 94.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Drill Cuttings 697.37 Tons LANDFILL 101247
2016 SWN PROD CO LLC Synthetic Liner Materials 6.42 Tons LANDFILL 101247
2016 SWN PROD CO LLC Fracturing Fluid Waste 220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWN PROD CO LLC Soil Contaminated by Oil & Gas Related Spills 14.58 Tons LANDFILL 101247
2016 SWN PROD CO LLC Produced Fluid 120.15 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Other Oil & Gas Wastes 221.66 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 2,980.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWN PROD CO LLC Produced Fluid 2,980.00 Bbl SURFACE IMPOUNDMENT 826342
2017 SWN PROD CO LLC Produced Fluid 5,735.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Unused Fracturing Fluid Waste 35.55 Tons LANDFILL THR029
2017 SWN PROD CO LLC Produced Fluid 105.00 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Other Oil & Gas Wastes 13.33 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 1,830.16 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Synthetic Liner Materials 6.00 Tons LANDFILL 100933
2018 SWN PROD CO LLC Produced Fluid 272.50 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 251.01 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Other Oil & Gas Wastes 132.39 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 36.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 634.52 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 248.83 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Other Oil & Gas Wastes 25.69 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2503458 Primary Facility 2016-07-21 Drilling/Alteration No Violations Noted
2516395 Primary Facility 2016-08-29 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 12:40p.m., I met with company man Bud Woolsey, Falcon Rig 25 was on site and waiting on the welder to repair the flow line before they drill the top hole section to TD. I took a walk around the location and everything looked OK.

Depth at time of inspection was 1599'. Projected TD for the top hole section is 5400' I left the site at 14:10p.m.

2521873 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted I met with Tom Fooshee, site Company Man of SWN shortly upon arrival at the site. Falcon Drilling Rig #25 is at the location currently in the process of drilling the Conklin East 5H well. The most recent drilling resumption notice was submitted by SWN to the Department on 9/12/16. The comments in the notice indicated that Falcon 25 will be skidding to the Conklin East 5H on 9/9/16 at 5AM. Mr. Fooshee stated that the surface casing on the 5H well was cemented at (618) feet yesterday. The current depth of the well is (628) feet. The cement has cured for (8) hours and the rig crew is in the process of Formation Integrity Testing. The 2H and 6H well is in production. Falcon 25 has drilled the 1H and 4H well to kickoff point. The 3H well will be the last well drilled to kickoff point according to Mr. Fooshee. Eventually, either SDC Drilling Rig #44 or 45 will drill the 1H, 3H, 4H and 5H from kickoff point to total depth.

SWN submitted an alternative waste management practice (OG-71) application to the

2524896 Primary Facility 2016-09-30 Incident- Response to Accident or Event No Violations Noted I arrived at the site at 11:05 in response to an estimated (8-10) gallon spill of oil based mud. I met with Dan Hesserdorfer and Jonathan "Woody" Woodburn, both site company men of SWN, Danica Westgard, Drilling Engineer in Training and Mike Deming, Senior Regulatory Analyst also of SWN. We discussed the specifics of the spill incident in the company man trailer prior to viewing the area of impact and remediation process where the spill occurred. SDC Drilling Rig #45 is currently in the process of drilling the Conklin East 5H well at a depth of (10,820) feet. Re-entry of the well at kickoff point commenced at (5,243) feet. The well will be drilled to total depth at (11,991) feet). The Conklin East 2H and 6H wells are in production. SWN personnel stated the following information in reference to the spill. "The spill actually occurred at on 9-29-16 around 12:30 AM during a transfer of mud from a frac tank to the mud tanks next to the drilling rig. A valve was left open a frac tank forcing the oil based
2544886 Primary Facility 2016-12-13 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:15p.m., met with company men Ken Bush and Donny Torres. Halliburton was on site to frack the 1H, 3H, 4H, and 5H. They completed the 4H with 27 stages and were rigging down off the well and rigging up on the 1H. The 5H was completed with 23 stages, and the 1H will have 43 stages, and the 3H will have 41 stages. The water is being pumped in from the Young fresh water impoundment. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 14:00p.m.

2553046 Primary Facility 2017-01-18 Administrative/File Review No Violations Noted On 1/10/17 the Department submitted a Statewide Health Final Report Approval to SWN in reference to a spill of oil based mud that occurred at the site on 9/29/16. The report states the following information. "The Department of Environmental Protection (DEP) received on December 22, 2016 and reviewed the Document titled " Site Characterization And Final Report For Site Remediated to Statewide Health Standard, " (report) for the Range Unit 36- Conklin East Pad. Approximately one barrel of diesel based drilling fluid was released to secondary containment, breached the containment and impacted underlying well pad soils. The report was prepared by Resource Environmental Management, Inc. and submitted to DEP in accordance with the Land Recycling and Environmental Remediation Standards Act (Act 2) and constitutes a final report as defined in Chapter 3 of Act 2. The DEP hereby approves this final report for the substances identified and remediated to an Act 2 standard within the site specified. Chapter 5, Sect
2562355 Primary Facility 2017-01-30 Routine/Complete Inspection No Violations Noted I arrived at the site at 11:30. I met with Eugene Mancuso, Production Foreman of SWN. The most recent stimulation notice for the Conklin East 1H well was submitted to the Department from SWN was on 11/23/16. The notice indicated that stimulation would commence on 11/25/16 at 6:00. Mr. Mancuso stated the following. "The frac job has been done for a few weeks now. We are setting up production equipment and welding pipeline. Flowback of the wells will start in about a month or so. The majority of the frac tanks and containment might be removed prior to flowback. There are 6 wells here and 2 are in production."

The mailbox at the site entrance contains a Prepardeness, Prevention and Contingency Plan dated May of 2012, a site specific Emergecy Response Plan, Erosion & Sedimentation Control Plan, a site specific Spill Prevention Control and Countermeasure checklist and a Weekly E&S Inspection Checklist and Site Inspection Log. The weather conditions were sunny and cold, with temperatures in the 20's. There was so

2580400 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:50a.m.

The well was recently completed and is in production. The well tag was on the well and correct. The cellar was set up with a plastic corrugated pipe around the well for inspection access; there was water above the surface casing with no bubbling noticed. The (9x5) annulus vent pipe was open and set up with a Taylor plug to check for pressure with a Crystal pressure gauge, the valve going to the production tank was closed. There was 761psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:45a.m.

2591908 Primary Facility 2017-05-10 Routine/Complete Inspection No Violations Noted Inspection conducted on May 4, 2017. A crew is actively working on restoring ditches and cleaning out cross culverts. It appears as if all 6 wells have been placed into production. The East 3H, East 1H, East 4H, East 5H, East 6H, and the East 2H. Overall, site stable. No violations noted. Standing water on west side of well heads had a conductivity of 1000 micro Siemens. Photo 6 shows what appears to be land owner damage off access road.
2672732 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was set up with a corrugated pipe around the well for inspection access. The (20x13) and (13x9) annuli were below the water level and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2682574 Primary Facility 2018-01-12 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall site has good stabilization. No spills detected. No violations noted.
2777023 Primary Facility 2018-09-19 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was containment around the four newest wells drilled and was unable to inspect the cellar. There was also an empty flow back tank on the containment and the containment appeared to be in good condition. It appears tubing was recently put in the well. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2812670 Primary Facility 2018-12-03 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Good site stabilization. No E&S issues identified. No violations noted.