37-115-22131

Well Details

Well ID: 37-115-22131
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 153301
Farm/Lease Name: JHHC 2
License Status:
Spud Date:
Permit Date: 2016-01-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.792239
Longitude: -75.986956

For data sources see[1][2][3]

Well History

Date Event
2016-01-08 New Permit Application
2017-01-01 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-11 2017-10-27 6,401 21,948,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000753674 1555.52
Acetic acid 64-19-7 5 0.000125612 259.253
Acid Inhibitor, KAI-12 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.0001786 368.616
Ethoxylated alcohol 68131-39-5 10 0.00008930 184.308
Cinnamaldehyde 104-55-2 10 0.00008930 184.308
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00008930 184.308
Ethylene glycol 107-21-1 40 0.000357201 737.233
formic acid 64-18-6 10 0.00008930 184.308
isoproyl alcohol 67-63-0 5 0.00004465 92.154
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.1046 22,918,900.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 7.5 0.00226713 4679.18
organic phosphonic salts 15827-60-8 15 0.00279117 5760.74
Citric acid 77-92-9 30 0.000753674 1555.52
Cinnamaldehyde 104-55-2 10 0.00008930 184.308
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.0001786 368.616
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00008930 184.308
Copolymer of 2-propenamide 69418-26-4 5 0.00442199 9126.61
ammonium chloride 12125-02-9 30 0.0265319 54759.7
oleic acid diethanolamide 93-83-4 1 0.000884397 1825.32
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00442199 9126.61
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482878 996.62
Glutaral 111-30-8 26.7 0.00242803 5011.25
Ethoxylated alcohol 68131-39-5 10 0.00008930 184.308
isoproyl alcohol 67-63-0 5 0.00004465 92.154
formic acid 64-18-6 10 0.00008930 184.308
ethonal 64-17-5 2.8 0.000254625 525.525
didecyldimethylammonium chloride 7173-51-5 8 0.000724772 1495.87
Petroleum distillate 64742-47-8 1 0.000884397 1825.32
Biocide, MBC-516 Keane Biocide Glutaral 111-30-8 26.7 0.00242803 5011.25
didecyldimethylammonium chloride 7173-51-5 8 0.000724772 1495.87
ethonal 64-17-5 2.8 0.000254625 525.525
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482878 996.62
Water 7732-18-5 56.7 0.00515797 10645.6
Friction Reducer, KFR-20 Keane Friction Reducer Petroleum distillate 64742-47-8 1 0.000884397 1825.32
Copolymer of 2-propenamide 69418-26-4 5 0.00442199 9126.61
Water 7732-18-5 30 0.0265319 54759.7
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00442199 9126.61
ammonium chloride 12125-02-9 30 0.0265319 54759.7
oleic acid diethanolamide 93-83-4 1 0.000884397 1825.32
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00226713 4679.18
Hydrochloric Acid 7647-01-0 15 0.00453427 9358.35
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.7457 183,164,000.0
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0176774 36484.7
organic phosphonic salts 15827-60-8 15 0.00279117 5760.74

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 663,373.74 47 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 3,664,826.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 2,355,837.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Drill Cuttings 1,532.73 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 18.54 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 37,789.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 41.55 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.10 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Produced Fluid 11,157.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 55.27 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 0.15 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 17,883.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.73 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 8,603.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 32.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 7,387.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2475063 Primary Facility 2016-03-21 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection for the JHHC well site (ESX29-115-15-0039).

There are 9 wells that will be associated with this site, and they are as follows: 115-22130 115-22131 115-22132 115-22133 115-22134 115-22135 115-22136 115-22137 115-22138 The site is currently staked out, and awaiting construction. There were no erosion or sediment issues currently and the site is stable and well vegetated.

There were no violations.

If there are any questions please feel free to contact me at (570)346-5539.

2493195 Primary Facility 2016-05-03 Preoperation Inspection No Violations Noted The Department was on site on 5/3/2016 to conduct a routine complete inspection for the JHHC well site (ESX29-115-15-0039).

There are 9 wells that will be associated with this site, and they are as follows: 115-22130 115-22131 115-22132 115-22133 115-22134 115-22135 115-22136 115-22137 115-22138 The site is under construction. All perimeter BMPs have been installed and there has been an additional filter sock added along the lower edge of the project. There are currently no issues with the site and this qualifies as a preoperational inspection.

There were no violations.

If there are any questions please feel free to contact me at (570)346-5539.

2526050 Primary Facility 2016-09-22 Routine/Partial Inspection No Violations Noted
2550412 Primary Facility 2017-01-05 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 15:10p.m. for a new spud inspection, I met with company man Glenn Broussard. United Drilling was on site to drill the holes and run the conductor pipe. The 1H and 2H were drilled to TD at 92' and the conductor pipe was run in the hole. There was a rig on the 6H and the 10H, the rig on the 6H was running the conductor pipe and the rig on the 10H was at a depth of 44'. All the conductor pipe will be ran to 92' and cemented in. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 15:35p.m.

2555851 Primary Facility 2017-01-25 Follow-up Inspection No Violations Noted
2596949 Primary Facility 2017-05-23 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 14:45p.m.

I met with company man Marcus Cormier. Precision Rig 548 was on site and drilling the hole for the production casing. I took a walk around the location and there were no obvious concerns noticed. Depth at time of inspection was 4,925'. Projected TD for the well is 16,331'. I left the site at 15:40p.m.

2652898 Primary Facility 2017-10-26 Routine/Complete Inspection No Violations Noted At time of inspection.

I met with company men Jody Martin and Ken Wilson. Keane was on site to frac the 1H, 2H, 6H, and 10H wells. They just ran a plug and perf in the 2H well when I arrived on site. There were 13 stages completed out of 30 on the 1H. There were 56 stages completed out of 60 on the 2H. There were 23 stages completed out of 34 on the 6H. There were 31 stages completed out of 48 on the 10H. The water was being hauled to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2654982 Primary Facility 2017-10-26 Incident- Response to Accident or Event No Violations Noted Arrived at the site at 12:19 in response to a reported spill of a residual lubricant to the JHHC well pad lease road, State Route 3027 and State Route 706. The weather conditions were cloudy skies and breezy with temperatures around 50 degrees. I was accompanied by Briana Cunningham, DEP O&G WQS during the inspection. We met with Ken Wilson, completions consultant of Cabot Oil and Gas on the lease road. Keane Frac is the subcontractor conducting hydraulic fracturing operations on the 2H well according to Mr. Wilson. Mr. Wilson provided the Department the following details in reference to the spill. "The spill occurred on the lease road. A wireline unit, #8015, was being sent back to New Stanton, PA to be serviced. A 3 ft x 3 ft pan (7.5) inches deep on a truck was completely full of a mixture of rainwater and vegetable oil, OCR782B biodegradable line spray, (53) gallons in capacity. We recovered (5) gallons in the pan leaving the spill volume at (48) gallons, with the majority of the impact occurring on SR
2684092 Primary Facility 2018-01-17 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and venting to the same tank. There was a 500 bbl flow back tank on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2728690 Primary Facility 2018-05-10 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection. The wells associated with this site are as follows: 115-22133, 115-22137, 115-22130, 115-22131. The wells were properly labeled.

The access road was solid and the pad surface was mostly solid as well. Due to recent rains there was some puddling on the pad surface, but no areas in danger of instability.

The grass was growing well and filling in on the cut and fill slopes. There were areas on the site which appeared to be recently touched up and mulched and these areas all appeared stable and growing.

There was a light/generator plant running near the entrance to the site. It was parked on containment however the right tire was on the berm of the containment rendering the containment ineffective. The plant was not leaking. It would be recommended the light plant be moved completely onto the containment to eliminate the possibility of a release occurring due to ineffective containment.

There were no erosional issues noted.

There were no violations noted.

2748528 Primary Facility 2018-06-19 Routine/Complete Inspection No Violations Noted The Department arrived on site at 1400 hrs to conduct a RTNC inspection. The Department was represented by Frank Hoehle (WQS-DEP) and myself.

The pad's access road and surface were solid and stable. The cut slope was solid and stable, with some isolated areas that are nearly bare and contain little vegetation. While the overall vegetative cover is still greater than 70 percent, these bare spots should be monitored by the operator to ensure 70 percent vegetative cover is maintained. The fill slope was well-vegetated with no apparent bare spots.

There were several areas of the pad's perimeter berm that had fairly large bare spots. Operator, please review these areas to determine if there is erodible material present in these areas. If there is, please determine the best method in your approved plan to achieve stabilization (Photos 8, 10, 11).

All the required PCSM BMPs were in place and in good condition, including ditches and rock aprons along the access road. There were several filter socks on site that w

2786532 Primary Facility 2018-10-10 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. There was a light plant being used as a generator at the entrance of the well pad on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]

References