X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22250

Well Details

Well ID: 37-115-22250
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 153964
Farm/Lease Name: JEFFERS FARMS 7
License Status:
Spud Date: 2017-02-21
Permit Date: 2016-11-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.772097
Longitude: -75.742125

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-11-22 New Permit Application
2017-02-20 Performed Spud Operation
2017-06-28 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-03 2018-06-08 7,070 19,865,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, KFR-23 Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00225778 4260.62
oleic acid diethanolamide 93-83-4 2 0.00225778 4260.62
Copolymer of 2-propenamide 69418-26-4 20 0.0225778 42606.2
Water 7732-18-5 50 0.0564445 106515
Petroleum distillate 64742-47-8 20 0.0225778 42606.2
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.8492 165,779,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.00007462 140.814
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007462 140.814
Cinnamaldehyde 104-55-2 10 0.00007462 140.814
Ethylene glycol 107-21-1 40 0.000298479 563.254
isoproyl alcohol 67-63-0 5 0.00003731 70.407
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000149239 281.627
formic acid 64-18-6 10 0.00007462 140.814
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00189316 3572.55
Hydrochloric Acid 7647-01-0 15 0.00378632 7145.1
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.9828 22,612,600.0
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000490651 925.898
Glutaral 111-30-8 26.7 0.00246712 4655.65
Water 7732-18-5 56.7 0.005241 9890.2
didecyldimethylammonium chloride 7173-51-5 8 0.000736439 1389.72
ethanal 64-17-5 2.8 0.000258724 488.233
Other Chemical(s) Listed Above See Trade Name(s) List oleic acid diethanolamide 93-83-4 2 0.00225778 4260.62
isoproyl alcohol 67-63-0 5 0.00003731 70.407
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000490651 925.898
organic phosphonic salts 15827-60-8 15 0.00265503 5010.26
alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00225778 4260.62
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007462 140.814
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000149239 281.627
ethanal 64-17-5 2.8 0.000258724 488.233
didecyldimethylammonium chloride 7173-51-5 8 0.000736439 1389.72
Petroleum distillate 64742-47-8 20 0.0225778 42606.2
Water 7732-18-5 7.5 0.00189316 3572.55
formic acid 64-18-6 10 0.00007462 140.814
Citric acid 77-92-9 30 0.000629841 1188.56
Cinnamaldehyde 104-55-2 10 0.00007462 140.814
Glutaral 111-30-8 26.7 0.00246712 4655.65
Ethoxylated alcohol 68131-39-5 10 0.00007462 140.814
Copolymer of 2-propenamide 69418-26-4 20 0.0225778 42606.2
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000104974 198.094
Citric acid 77-92-9 30 0.000629841 1188.56
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0168152 31731.6
organic phosphonic salts 15827-60-8 15 0.00265503 5010.26

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,431,155.00 167 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 6,486,399.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 3.24 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Servicing Fluid 417.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 CABOT OIL & GAS CORP Servicing Fluid 135.04 Tons LANDFILL 100933
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Drill Cuttings 1,601.47 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Servicing Fluid 332.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Servicing Fluid 41.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 22.93 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Servicing Fluid 47.81 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Produced Fluid 17,793.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Servicing Fluid 36.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 90.34 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 5.93 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 19,348.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Drill Cuttings 17.34 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 2.18 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 654.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.17 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 2,198.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2561957 Primary Facility 2017-02-15 Preoperation Inspection No Violations Noted
2565618 Primary Facility 2017-02-24 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 12:30p.m. for a new spud inspection.

I met with company man Glenn Broussard. United Drilling was on site to drill and set the conductor pipe Upon arrival, O Tex was on site to cement the conductor pipe on the 7H, 10H, 11H, and 13H. The conductor pipe was set at 94' on all four wells. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:15p.m.

2607497 Primary Facility 2017-06-22 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 12:30p.m.

I met with company man Tony Ketterling. Nabors X36 Rig was on site and drilling the hole for the production casing. The tools were stuck in the hole at 8123' at time of inspection. KLX Energy Services was on site to run a collar locater and a charge to separate the drill pipe but they were having technical difficulty with their tools. I took a walk around the location and there were no obvious concerns noticed. Depth at time of inspection was 8,123'. Projected TD for the well is 17,017'. I left the site at 13:45p.m.

2623633 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Today's inspection, 7/19/17 is being conducted as a routine inspection. No pictures were added to this inspect due to an electronic glitch. Drilling rig still on-site. Signage is up and displayed. Good vegetative growth occurring on all sections of the site. Vegetation a mixture of annuals and perennials with clovers being the most dominant perennial. No violations were observed during this inspection. Drilling set up looked very streamlined and organized.
2627579 Primary Facility 2017-08-17 Routine/Complete Inspection Violation(s) Noted At time of inspection, arrived on site at 11:00a.m. as part of a migration investigation, accompanied by DEP Geologist Andrea Mullen and WQS Gene Rickard.

We met with Steve Watson and Marshall McCarty of Cabot Oil and Gas and Prad Jadeja of Selman & Associates. Andrea used an Altair 5X gas meter calibrated on 8/16/17 and Prad used a Sensit HXG-3 gas meter to check for gas. We checked for gas at the vent lines at the edge of the pad, if gas was detected at the (13x9) annulus vent line, we went to the cellar so we could determine if the gas was coming from the (20x13) annulus or the (13x9) annulus. The 9H, 7H, 8H, 10H, 14H, and 12H wells were drilled to TD. The 11H, 15H, 13H, 17H, 16H, and 18H wells were partially drilled with the surface and intermediate casings cemented into place I left the site at 13:30p.m.

2639016 Primary Facility 2017-08-17 Complaint Inspection No Violations Noted Todays inspection, 8/17/17 was conducted as part of a Department investigation into a nearby water supply complaint. This inspection centered around investigating the annuli of the 12 wells recently drilled at this location. Present during this inspection were myself, Jon Sassi, Dept EPS, David Schoonover, Dept OGI, Steve Watson, Cabot EH&S Specialist, Marshall McCarty, Cabot Production Person and Prad Jadeja, Cabot consultant. As part of the effort in trying to identify if any of the wells are discharging gas from their respective annular vents, Cabot has developed a more sophisticated layout of the vent pipes which are clearly marked. No E&S violations were noted.
2664951 Primary Facility 2017-11-20 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:24. The weather conditions are mostly cloudy skies, with a light breeze and occasional wind gusts, with temperatures in the mid to upper 30's. Nabors X 36 is the drilling rig on-site. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department on 11/15/17 for the Jeffers Farms Pad 2 18H well. The notice indicates the date and time the action was to occur was on 11/16/17 at 6:00 AM. I met with Perk McDowell, site company man, consultant of Cabot. Mr. McDowell informed me of the following regarding site activities. "We are drilling the 18H well on diesel oil based mud at a depth of (6,954) feet. We are drilling below the kickoff point in the curve. Kickoff point (KOP) was at (4,843) feet. Curve will be landed at (8,575) feet. The well will be drilled to total depth (TD) at (18,979) feet. Drilling resumed here on 11/18/17. Surface and intermediate casings have been cemented. The well was drilled to KOP and then the rig left the pad. We resumed
2691055 Primary Facility 2018-02-05 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection.

Met with company man James Restly. Stone Well Service Rig #2 was on site pulling 2 7/8" drill pipe. Halliburton just finished spotting 10bbls of cement at 2020' just above the top perforation. When they finish pulling the drill pipe they plan to pressure up on the 5 1/2" production casing and attempt to squeeze the cement into the perforations.

2730518 Primary Facility 2018-05-15 Routine/Complete Inspection No Violations Noted I arrived on site at 1345 to perform a RTNC inspection of the Jeffers Farms P2 well pad. Present during the inspection were Casey Baldwin (WQS - DEP) and Ken Wilson (EHS Foreman - Cabot).

The entrance to the access road was well-marked by the appropriate signage. The access road was stable and solid with no apparent erosion or deterioration. The well's mailbox contained most of the required paperwork, however the site map outlining the BMPs associated with the ESCGP permit was absent. I used the site map with PCSM associated BMPs instead.

On the date of inspection, the wells on the pad were in between stages of hydraulic fracturing. Fracturing had been completed on the 8H, 10H, 12H, 14H, 16H, and 18H. Hydraulic fracturing had yet to be performed on the 7H, 9H, 11H, 13H, 15H, and 17H.

Several nearby water supply complaints have prompted Cabot to install a monitoring station on site to aid in early detection of any further issues that may arise.

The fill slope appeared to be well-vegetated and mostly stab

2741468 Primary Facility 2018-06-12 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection.

Met with company man Andy Rodriguez. Keane was on site to frac the 12 wells on the location. The even number wells were completed first, for frac information see inspection conducted on 4/17/18. The frac was completed and Keane was rigging down there iron and moving off location when I arrived on location. There were 46 stages completed in the 7H. There were 66 stages completed in the 9H. There were 78 stages completed in the 11H. There were 58 stages completed in the 13H. There were 50 stages completed in the 15H. There were 46 stages completed in the 17H. I took a walk around the location and there were no obvious concerns noticed.

2762346 Primary Facility 2018-08-07 Follow-up Inspection Outstanding Violations - Viols Req'd At time of inspection.

The wells were recently completed and put in production. Cabot Oil & Gas contacted the Department to let them know they plan to evaluate and take isotopic samples from the annuli of the Jeffers Farms P2. The Department Eric Rooney (Geologist) and David Schoonover (Oil & Gas inspector) was on-site to observe and document results. We met with Cabot representatives Mike Hall and Ben Whitaker and Selman representatives Tyler Thomas and Kaydee Oliver. Remedial work was done on the 14H, 8H, 7H and 10H wells. Work started in August 2017 and well assessments are still ongoing.

7H 115-22250 All annuli were connected to Alicat meters. (9x5) 100% LEL 50000ppm sample taken 0psi (13x9) 35% LEL 17800ppm sample taken 0psi (20x13) 30% LEL 15500ppm sample taken 1psi Since some presence of gas was detected at all wells annuli, it appears that some comingling of gas may have been occurring within the current vent plumbing set up. The D

2836049 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site has good stabilization. No E&S issues identified. No violations noted.
2855413 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site appears to have good stabilization. As Photo #2 #3 show, a sheen was noted on the containment which is still present from the stimulation activities which occurred at this site. Please vac this containment and remove immediately. Steve Watson, Cabot EH&S Specialist was notified about this sheen during the inspection. No E&S issues identified. No violations noted.
2856385 Primary Facility 2019-03-20 Follow-up Inspection No Violations Noted Today's inspection was conducted as a follow-up inspection to the Department's inspection conducted on 3/13/19 in which an oily sheen was noted on standing water which was on containment present on this pad. Today's inspection finds that the contaminated water was removed, the 3 mobile water tanks have been removed, and the containment is being removed. Standing water thus far exposed after containment removal has no sheen present. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2627579 794832 2017-08-17 78a85(a)5 Environmental Health & Safety
2691055 807519 2018-02-05 78a85(a)5 Environmental Health & Safety
2741468 819701 2017-08-17 78a85(a)5 Environmental Health & Safety This is an outstanding violation for gas detected in a cemented annulus.
2762346 824881 2017-08-17 78a85(a)5 Environmental Health & Safety This is an outstanding violation for gas detected at a cemented annulus.

For data sources see[8]

References