X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22254

Well Details

Well ID: 37-115-22254
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 153964
Farm/Lease Name: JEFFERS FARMS 11
License Status:
Spud Date: 2017-02-21
Permit Date: 2016-11-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.772189
Longitude: -75.742114

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-11-22 New Permit Application
2017-02-20 Performed Spud Operation
2017-06-07 MOD
2018-01-17 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-25 2018-06-07 7,187 32,616,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.0447 272,185,000.0
Friction Reducer, KFR-23 Keane Friction Reducer oleic acid diethanolamide 93-83-4 2 0.00206499 6383.81
Water 7732-18-5 50 0.0516248 159595
alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00206499 6383.81
Copolymer of 2-propenamide 69418-26-4 20 0.0206499 63838
Petroleum distillate 64742-47-8 20 0.0206499 63838
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.7952 36,464,100.0
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.00011047 341.512
Citric acid 77-92-9 30 0.000662821 2049.07
Other Chemical(s) Listed Above See Trade Name(s) List oleic acid diethanolamide 93-83-4 2 0.00206499 6383.81
Water 7732-18-5 7.5 0.00199366 6163.27
Citric acid 77-92-9 30 0.000662821 2049.07
Cinnamaldehyde 104-55-2 10 0.00007853 242.762
organic phosphonic salts 15827-60-8 15 0.0026857 8302.67
Glutaral 111-30-8 26.7 0.0025087 7755.51
ethanal 64-17-5 2.8 0.000263085 813.312
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000157054 485.523
alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00206499 6383.81
Ethoxylated alcohol 68131-39-5 10 0.00007853 242.762
Petroleum distillate 64742-47-8 20 0.0206499 63838
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000498922 1542.39
isoproyl alcohol 67-63-0 5 0.00003926 121.381
didecyldimethylammonium chloride 7173-51-5 8 0.000748853 2315.03
formic acid 64-18-6 10 0.00007853 242.762
Copolymer of 2-propenamide 69418-26-4 20 0.0206499 63838
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007853 242.762
Biocide, MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00532935 16475.4
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000498922 1542.39
ethanal 64-17-5 2.8 0.000263085 813.312
Glutaral 111-30-8 26.7 0.0025087 7755.51
didecyldimethylammonium chloride 7173-51-5 8 0.000748853 2315.03
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.0026857 8302.67
Water 7732-18-5 95 0.0170094 52583.6
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00199366 6163.27
Hydrochloric Acid 7647-01-0 15 0.00398732 12326.5
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.00007853 242.762
isoproyl alcohol 67-63-0 5 0.00003926 121.381
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007853 242.762
Ethylene glycol 107-21-1 40 0.000314108 971.046
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000157054 485.523
Cinnamaldehyde 104-55-2 10 0.00007853 242.762
formic acid 64-18-6 10 0.00007853 242.762

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 5,529,482.00 167 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 6,665,267.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Drill Cuttings 666.82 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid 22,415.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 22.93 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 20,936.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 117.20 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 5.93 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,993.39 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Produced Fluid 948.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.52 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 3,091.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 2.18 Tons LANDFILL 101247

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2561967 Primary Facility 2017-02-15 Preoperation Inspection No Violations Noted
2565624 Primary Facility 2017-02-24 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 12:30p.m. for a new spud inspection.

I met with company man Glenn Broussard. United Drilling was on site to drill and set the conductor pipe Upon arrival, O Tex was on site to cement the conductor pipe on the 7H, 10H, 11H, and 13H. The conductor pipe was set at 94' on all four wells. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:15p.m.

2621137 Primary Facility 2017-07-31 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 9:20a.m.

I met with company man Perk McDowell. Nabors X36 Rig was on site and pulling drill pipe out of the 15H well and will run surface casing to 624'. I took a walk around the location and there were no obvious concerns noticed. There was no gas detected at the (13x9) annulus vent for the 11H well. Depth at time of inspection was 634'. I left the site at 10:45a.m.

2623647 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Today's inspection, 7/19/17 is being conducted as a routine inspection. No pictures were added to this inspect due to an electronic glitch. Drilling rig still on-site. Signage is up and displayed. Good vegetative growth occurring on all sections of the site. Vegetation a mixture of annuals and perennials with clovers being the most dominant perennial. No violations were observed during this inspection. Drilling set up looked very streamlined and organized.
2625637 Primary Facility 2017-08-14 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 8:45a.m.

I met with company man Tony Ketterling. Nabors X36 Rig was rigging down and moving off the location. I took a walk around the location and there were no obvious concerns noticed. I left the site at 9:50a.m.

2627616 Primary Facility 2017-08-17 Routine/Complete Inspection Violation(s) Noted At time of inspection, arrived on site at 11:00a.m. as part of a migration investigation, accompanied by DEP Geologist Andrea Mullen and WQS Gene Rickard.

We met with Steve Watson and Marshall McCarty of Cabot Oil and Gas and Prad Jadeja of Selman & Associates. Andrea used an Altair 5X gas meter calibrated on 8/16/17 and Prad used a Sensit HXG-3 gas meter to check for gas. We checked for gas at the vent lines at the edge of the pad, if gas was detected at the (13x9) annulus vent line, we went to the cellar so we could determine if the gas was coming from the (20x13) annulus or the (13x9) annulus. The 9H, 7H, 8H, 10H, 14H, and 12H wells were drilled to TD. The 11H, 15H, 13H, 17H, 16H, and 18H wells were partially drilled with the surface and intermediate casings cemented into place I left the site at 13:30p.m.

2639040 Primary Facility 2017-08-17 Complaint Inspection No Violations Noted Todays inspection, 8/17/17 was conducted as part of a Department investigation into a nearby water supply complaint. This inspection centered around investigating the annuli of the 12 wells recently drilled at this location. Present during this inspection were myself, Jon Sassi, Dept EPS, David Schoonover, Dept OGI, Steve Watson, Cabot EH&S Specialist, Marshall McCarty, Cabot Production Person and Prad Jadeja, Cabot consultant. As part of the effort in trying to identify if any of the wells are discharging gas from their respective annular vents, Cabot has developed a more sophisticated layout of the vent pipes which are clearly marked. No E&S violations were noted.
2664995 Primary Facility 2017-11-20 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:24. The weather conditions are mostly cloudy skies, with a light breeze and occasional wind gusts, with temperatures in the mid to upper 30's. Nabors X 36 is the drilling rig on-site. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department on 11/15/17 for the Jeffers Farms Pad 2 18H well. The notice indicates the date and time the action was to occur was on 11/16/17 at 6:00 AM. I met with Perk McDowell, site company man, consultant of Cabot. Mr. McDowell informed me of the following regarding site activities. "We are drilling the 18H well on diesel oil based mud at a depth of (6,954) feet. We are drilling below the kickoff point in the curve. Kickoff point (KOP) was at (4,843) feet. Curve will be landed at (8,575) feet. The well will be drilled to total depth (TD) at (18,979) feet. Drilling resumed here on 11/18/17. Surface and intermediate casings have been cemented. The well was drilled to KOP and then the rig left the pad. We resumed
2730545 Primary Facility 2018-05-15 Routine/Complete Inspection No Violations Noted I arrived on site at 1345 to perform a RTNC inspection of the Jeffers Farms P2 well pad. Present during the inspection were Casey Baldwin (WQS - DEP) and Ken Wilson (EHS Foreman - Cabot).

The entrance to the access road was well-marked by the appropriate signage. The access road was stable and solid with no apparent erosion or deterioration. The well's mailbox contained most of the required paperwork, however the site map outlining the BMPs associated with the ESCGP permit was absent. I used the site map with PCSM associated BMPs instead.

On the date of inspection, the wells on the pad were in between stages of hydraulic fracturing. Fracturing had been completed on the 8H, 10H, 12H, 14H, 16H, and 18H. Hydraulic fracturing had yet to be performed on the 7H, 9H, 11H, 13H, 15H, and 17H.

Several nearby water supply complaints have prompted Cabot to install a monitoring station on site to aid in early detection of any further issues that may arise.

The fill slope appeared to be well-vegetated and mostly stab

2741470 Primary Facility 2018-06-12 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection.

Met with company man Andy Rodriguez. Keane was on site to frac the 12 wells on the location. The even number wells were completed first, for frac information see inspection conducted on 4/17/18. The frac was completed and Keane was rigging down there iron and moving off location when I arrived on location. There were 46 stages completed in the 7H. There were 66 stages completed in the 9H. There were 78 stages completed in the 11H. There were 58 stages completed in the 13H. There were 50 stages completed in the 15H. There were 46 stages completed in the 17H. I took a walk around the location and there were no obvious concerns noticed.

2762352 Primary Facility 2018-08-07 Follow-up Inspection Outstanding Violations - Viols Req'd At time of inspection.

The wells were recently completed and put in production. Cabot Oil & Gas contacted the Department to let them know they plan to evaluate and take isotopic samples from the annuli of the Jeffers Farms P2. The Department Eric Rooney (Geologist) and David Schoonover (Oil & Gas inspector) was on-site to observe and document results. We met with Cabot representatives Mike Hall and Ben Whitaker and Selman representatives Tyler Thomas and Kaydee Oliver. Remedial work was done on the 14H, 8H, 7H and 10H wells. Work started in August 2017 and well assessments are still ongoing.

11H 115-22254 All annuli were connected together and venting to a poly vent tank. (9x5) 50% LEL 24000ppm sample taken (13x9) 22% LEL 11300ppm sample taken (20x13) 35% LEL 17800ppm sample taken Since some presence of gas was detected at all wells annuli, it appears that some comingling of gas may have been occurring within the current vent plumbing set u

2836059 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site has good stabilization. No E&S issues identified. No violations noted.
2855437 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site appears to have good stabilization. As Photo #2 #3 show, a sheen was noted on the containment which is still present from the stimulation activities which occurred at this site. Please vac this containment and remove immediately. Steve Watson, Cabot EH&S Specialist was notified about this sheen during the inspection. No E&S issues identified. No violations noted.
2856399 Primary Facility 2019-03-20 Follow-up Inspection No Violations Noted Today's inspection was conducted as a follow-up inspection to the Department's inspection conducted on 3/13/19 in which an oily sheen was noted on standing water which was on containment present on this pad. Today's inspection finds that the contaminated water was removed, the 3 mobile water tanks have been removed, and the containment is being removed. Standing water thus far exposed after containment removal has no sheen present. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2627616 794838 2017-08-17 78a85(a)5 Environmental Health & Safety
2741470 819702 2017-08-17 78a85(a)5 Environmental Health & Safety This is an outstanding violation for gas detected in a cemented annulus.
2762352 824884 2017-08-17 78a85(a)5 Environmental Health & Safety This is an outstanding violation for gas detected at a cemented annulus.

For data sources see[8]

References