| Well ID: 37-115-22263 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.838569,"lon":-75.604075,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Susquehanna | |
| Municipality: Jackson Township | |
| Operator Name: SWN PROD CO LLC | |
| Well Pad ID: 150053 | |
| Farm/Lease Name: PEASE 2H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2016-11-30 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.838569 | |
| Longitude: -75.604075 |
| Date | Event |
|---|---|
| 2016-11-30 | New Permit Application |
| 2017-05-03 | Performed Spud Operation |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-10-18 | 2017-10-23 | 6,876 | 7,987,770 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.412866 | 320943 |
| FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| LP-65 MC | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| HAI-150E | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0266042 | 20681 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 13.9459 | 10,840,800.0 | ||||
| Inorganic salt | Proprietary | 30 | 0.0266042 | 20681 | ||||
| Non-hazardous food substance | Proprietary | 100 | 0.000201969 | 157 | ||||
| Acrylamide acrylate copolymer | Proprietary | 30 | 0.0266042 | 20681 | ||||
| Hydrochloric acid | 7647-01-0 | 15 | 0.0457941 | 35598 | ||||
| Ammonium chloride | 12125-02-9 | 30 | 0.00723049 | 5621 | ||||
| Diammonium phosphate | 7783-28-0 | 5 | 0.00120508 | 937 | ||||
| Organic phosphonate | Proprietary | 60 | 0.014461 | 11242 | ||||
| Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00399028 | 3102 | ||||
| SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| BE-9 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
| Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 85.5959 | 66,537,900.0 | |
| SAND-PREMIUM WHITE-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2017 | SWN PROD CO LLC | 780,476.00 | 56 | 0.00 | 0 | 0.00 | 0 |
| 2018 | SWN PROD CO LLC | 2,552,885.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | SWN PROD CO LLC | 1,268,290.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 68.33 Bbl | REUSE (AT WELL PAD) | |
| 2017 | SWN PROD CO LLC | Synthetic Liner Materials | 24.31 Tons | LANDFILL | 101247 |
| 2017 | SWN PROD CO LLC | Drilling Fluid Waste | 326.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2017 | SWN PROD CO LLC | Soil Contaminated by Oil & Gas Related Spills | 5.29 Tons | LANDFILL | 101247 |
| 2017 | SWN PROD CO LLC | Produced Fluid | 12,104.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2017 | SWN PROD CO LLC | Produced Fluid | 1.56 Tons | LANDFILL | 301358 |
| 2017 | SWN PROD CO LLC | Drilling Fluid Waste | 1,300.00 Bbl | REUSE (AT WELL PAD) | |
| 2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 162.01 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2017 | SWN PROD CO LLC | Soil Contaminated by Oil | 5.29 Tons | LANDFILL | 101247 |
| 2017 | SWN PROD CO LLC | Drill Cuttings | 1,740.98 Tons | LANDFILL | 101247 |
| 2017 | SWN PROD CO LLC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 3,634.01 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 335.33 Bbl | REUSE (AT WELL PAD) | |
| 2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 282.65 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2018 | SWN PROD CO LLC | Produced Fluid | 505.01 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 12.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 55.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 509.58 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
| 2019 | SWN PROD CO LLC | Produced Fluid | 375.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2591609 | Primary Facility | 2017-05-04 | Drilling/Alteration | No Violations Noted | At time of inspection, arrived on site at 11:25a.m. for a new spud inspection.
Minichi Contracting Group was on site to drill and run the conductor pipe for the 1H and 2H with a dual rotary rig. I spoke with driller Ralph Dewald of Minichi, the 2H was drilled and the conductor was set at 50'. The rig was set up to start the 1H, Ralph told me they were waiting for an excavator with a jack hammer attachment because the surface is so hard. The projected TD for the 1H is 88'. The drill cuttings were put into a sealed role off container and hauled to the Keystone Landfill. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:00p.m. |
| 2603256 | Primary Facility | 2017-06-12 | Drilling/Alteration | No Violations Noted | At time of inspection, arrived on site at 8:55a.m.
I met with company man John Hill. W S G Rig #1 was on site and running the surface casing into the 1H I took a walk around the location and there were no obvious concerns noticed. I left the site at 9:50a.m. |
| 2623840 | Primary Facility | 2017-08-02 | Incident- Response to Accident or Event | No Violations Noted | I arrived on site and met with David Schoonover (DEP-OGI) and Mike Deming (SWN). The inspection was halted due to lightening, as the rig was shut down. I arrived at 1:45 PM. Mr. Deming explained the following: At 0730 on 8/1/17 the well site supervisor was conducting an inspection of the site when a few associates were washing dust from a telehandler. They were using a substance they called "rig wash." The well site supervisor discovered water on the pad when the remainder of the pad was dry. Water was pooled in an area outside of the containment. Ryan Klemish later arrived and tested some ponded water, for conductivity, on the site and found it was 2.3 mS. The well site supervisor scraped the surface of the site removing 3 buckets worth of material from the surface, which is an estimated 2-3 cu yards of material. Seth Tratthen conducted soil EC screenings after the area was excavated to determine if the release was remediated. His conductivity readings were all under 220 micro siemens. He to |
| 2623851 | Primary Facility | 2017-08-03 | Follow-up Inspection | No Violations Noted | Jon Sassi (DEP-EPS) and I met with Joseph Pendergraft (Company Man- Bedrock, SWN) and Mike Deming (Senior Regulatory Analyst-SWN). I inquired about the capacity of the power washer and Mr. Pendergraft explained that the rig wash and water is mixed at an approximate rig wash to water ratio of 1:4 in a 5 gallon bucket. They hand washed the telehadler then sprayed it down with a power washer. When I inquired about a total volume of fluid used during this practice, Mr. Pendergraft stated "I have no quantitative value that I can give you on that". Three (3) 500 bbl gallon tanks situated on Durabase Newpark mats were being drained while we were on site. They will then remove the tanks and pull back the containment. Crews were on site vacuuming up fluid on the containment, patching holes, and working on draining the tanks.
Mr. Sassi collected conductivity readings on the well pad that ranged from 0.8-3.0 mS. The rig wash soap, Smartwash 20, was stored in a tote on containment. Mr. Sassi collected pure pr |
| 2629649 | Primary Facility | 2017-08-22 | Drilling/Alteration | No Violations Noted | At time of inspection, arrived on site at 14:40p.m.
I met with company man Dan Hessdorfer. SDC Rig 44 was on site and finished drilling the lateral section of the well, they were pulling the drill pipe out of the hole when I arrived on location. The top-hole section of the well was drilled and completed on 6/10/17 by WSG Rig 1 to a depth of 1630'. I took a walk around the location and there were no obvious concerns noticed. Depth at time of inspection is was 12,890'. I left the site at 15:25p.m. |
| 2640082 | Primary Facility | 2017-08-29 | Incident- Response to Accident or Event | No Violations Noted | The Department arrived on site in response to the self-reported release of a Smartwash 20/water mixture. Eric Rooney (P.G.) and I met with Mike Deming (SWN) to conduct an Incident Inspection. Upon our arrival, a vacuum truck had less than a 1 gallon release of antifreeze that they were removing from the well pad surface. Well Services Group was on site as the cleaning contractor and Resource Environmental was on site to delineate the release.
According to Mr. Deming, on 8/26/17 he received a call concerning water coming from underneath the containment on the Pease Pad. It was reported to him that they were unable to find any water on the containment, therefore they initially believed it to be water that was under the containment from condensation or a precipitation event that expressed itself while they were moving equipment off. Mr. Deming stated that he arrived on 8/27/17 and identified the area in Photo #1 which was field tested with an approximate 2 mS conductivity. He later spoke to Steve Moy |
| 2640102 | Primary Facility | 2017-08-30 | Follow-up Inspection | No Violations Noted | The Department was on site to conduct a Follow Up Inspection, in response to a notification that SWN was removing the on site containment, of the RU 62 site. We met with Mike Deming (Senior Regulatory Analyst-SWN) Resource Environmental, their remediation contractor, found some black staining under the containment and they are collecting soil samples in bags to conduct headspace sampling. It was estimated under 5 gallons. The Department requested that they have Resource Environmental walk the fill slope to search for seeps.
Violations associated with this inspection have been attached to permit #115-22262. |
| 2648806 | Primary Facility | 2017-10-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
I met with company man Wesley Martinez. Halliburton was on site to frac the 1H and 2H wells. The 1H was completed and the crew was changing the iron over to the 2H. The water was being pumped in from the Young fresh water impoundment. It is being pumped into a 20,000bbl tank on site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noticed. |
| 2674600 | Primary Facility | 2017-12-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was recently completed and is in production. The well tag was on the well and correct. The cellar was set up with a corrugated pipe around the well for inspection access. The (20x13) and (13x9) annuli were below the water level and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
| 2736020 | Primary Facility | 2018-05-29 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. No E&S issues were identified. No violations noted. |
| 2768918 | Primary Facility | 2018-08-29 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. There was water 3' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[8]